Discussions commenced with metal traders and smelters regarding offtake for Superior Lake Zinc Project

Discussions commenced with metal traders and smelters regarding offtake for Superior Lake Zinc Project

 

(TheNewswire)

 Metallum Resources Inc.

  HIGHLIGHTS  

 
  •  

      Discussions with multiple global metal traders and smelters have commenced regarding future offtake for the zinc and copper concentrates to be produced at the Superior Lake Project  

     
    •  

        Forecasted annual production of 69,819t of Zn and 5,308t of Cu concentrate per annum.  

       
    •  
  •  
  •  

      Both the zinc and copper concentrates are of a high quality with favorable grades and minimal deleterious elements (Table 1 and Table 2)  

     
  •  
  •  

      The Project has established transportation routes to North American and international smelters, giving the Project its unique location 30km from an operating rail terminal (Image 1)  

     
  •  
  •  

      The market outlook for zinc is strong, due to declining production from existing primary zinc mines, and increased forecasts on long-term demand driven by decarbonization  

     

  •  

  May 31, 2022 – TheNewswire -   Metallum Resources Inc. (TSXV:MZN)   (   "Metallum" or the "Company")   is pleased to announce the commencement of discussions with multiple global metal traders regarding future offtake from the Company's Superior Lake Zinc and Copper Project ("Project") in Ontario, Canada.  

 

  Preliminary discussions with a number of these groups have indicated a willingness to have offtake linked to additional funding solutions. An offtake related financing is typically in the form of mezzanine debt or concentrate pre-payments.  

 

    
Click Image To View Full Size
 

 

  Image 1: Location of Zinc smelter in north America and transportation routes  

 

  The concentrate produced at Superior Lake can access smelters using existing rail and road infrastructure to North American smelters as well as smelters in Asia, using the Vancouver port. The Thunder Bay port, which is located 214km from the mine gate, will provide access to smelters in Europe. The Project's unique location and access to the Canadian rail and highway network will provide access to Canadian port systems, both East and West coasts, allowing easy access to major smelters around the globe.  

 

  Both the Zinc and Copper concentrates are well understood given the Project successfully operated for a decade before closing in 1998 due to sustained low zinc prices. This historical production as well as additional metallurgical test work carried out by SGS Lakefield in Canada (Superior Zinc and Copper Project Feasibility Study N.I. 43-101 compatible, DRA – October 2021), provides detailed information and certainty to these groups. Detailed information regarding the concentrate grades and quality can be found in Table 1 below.  

 

  Table 1: Historical Winston Lake Detailed Zinc Concentrate Specifications  

 
                                                              
 

Element

 
 

% (LOM Average)

 
 

Zn

 
 

54

 
 

Cu

 
 

0.6

 
 

Fe

 
 

11

 
 

Pb

 
 

0.01

 
 

S

 
 

32

 
 

Si0 2  

 
 

0.5

 
 

  Element  

 
 

  ppm (LOM Average)  

 
 

Ag

 
 

40

 
 

As

 
 

 

 

Al 2 O 3  

 
 

6500

 
 

Au

 
 

0.4

 
 

BaO

 
 

100

 
 

Bi

 
 

80

 
 

CaO

 
 

490

 
 

Cd

 
 

1,300

 
 

Cl

 
 

150

 
 

Cr

 
 

80

 
 

Co

 
 

100

 
 

F

 
 

300

 
 

Ge

 
 

20

 
 

Hg

 
 

5

 
 

In

 
 

330

 
 

MgO

 
 

1,900

 
 

Mn

 
 

1,500

 
 

Mo

 
 

 

 

Ni

 
 

25

 
 

Sb

 
 

20

 
 

Se

 
 

310

 
 

Sn

 
 

180

 
 

Te

 
 

1

 
 

  Table 1: Historical Winston Lake Detailed Copper Concentrate Specifications  

 
                                                              
 

Element

 
 

Forecast LOM Average

 
 

Cu

 
 

24

 
 

Zn

 
 

7.5

 
 

Fe

 
 

29

 
 

Pb

 
 

0.07

 
 

S

 
 

35

 
 

Si0 2  

 
 

1.1

 
 

  Element  

 
 

  ppm (LOM Average)  

 
 

Ag

 
 

344

 
 

As

 
 

110

 
 

Al 2 O 3  

 
 

1,300

 
 

Au

 
 

12.9

 
 

BaO

 
 

270

 
 

Bi

 
 

230

 
 

CaO

 
 

570

 
 

Cd

 
 

180

 
 

Cl

 
 

70

 
 

Cr

 
 

100

 
 

Co

 
 

190

 
 

F

 
 

50

 
 

Ge

 
 

20

 
 

Hg

 
 

3

 
 

In

 
 

110

 
 

MgO

 
 

3,700

 
 

Mn

 
 

240

 
 

Mo

 
 

 

 

Ni

 
 

80

 
 

Sb

 
 

50

 
 

Se

 
 

300

 
 

Sn

 
 

170

 
 

Te

 
 

5

 
 

  Qualified Person  

 

  The news release has been reviewed and approved by Andrew Tims, P.Geo., Exploration Manager of the Company, and a Qualified Person as defined by National Instrument 43-101 –   Standards of Disclosure for Mineral Projects   .  

 

  ON BEHALF OF THE BOARD  

 

  For further information, contact:  

 

  Kerem Usenmez, President & CEO  

 

  Tel: 604-688-5288;  Fax: 604-682-1514  

 

  Email: info@metallumzinc.com  

 

  Website: metallumzinc.com  

 

   Neither the TSX Venture Exchange nor the Investment Industry Regulatory Organization of Canada accepts responsibility for the adequacy or accuracy of this release.   

 

  Cautionary Note Regarding Forward-Looking Statements  

 

  Certain statements contained in this news release constitute forward-looking statements within the meaning of Canadian securities legislation. All statements included herein, other than statements of historical fact, are forward-looking statements and include, without limitation, statements about the estimated economics of the Project, potential   offtake related financing,   and the Company's development plans for the Project. Often, but not always, these forward looking statements can be identified by the use of words such as "estimate", "estimates", "estimated", "potential", "open", "future", "assumed", "projected", "used", "detailed", "has been", "gain", "upgraded", "offset", "limited", "contained", "reflecting", "containing", "remaining", "to be", "periodically", or statements that events, "could" or "should" occur or be achieved and similar expressions, including negative variations.  

 

  Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any results, performance or achievements expressed or implied by forward-looking statements. Such uncertainties and factors include, among others,   the uncertainties inherent in the estimated economics of the Project, and whether the Company will arrange any offtake related financing;   whether exploration and development of the Company's properties will proceed as planned; changes in general economic conditions and financial markets; the Company or any joint venture partner not having the financial ability to meet its exploration and development goals; risks associated with the results of exploration and development activities, estimation of mineral resources and the geology, grade and continuity of mineral deposits; unanticipated costs and expenses; risks associated with COVID-19 including adverse impacts on the world economy, exploration and development efforts and the availability of personnel; and such other risks detailed from time to time in the Company's quarterly and annual filings with securities regulators and available under the Company's profile on SEDAR at www.sedar.com. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.  

 

  Forward-looking statements contained herein are based on the assumptions, beliefs, expectations and opinions of management, including but not limited to: the accuracy of the estimated economics of the Project; that the Company will arrange   offtake related financing;   that the Company's stated goals and planned exploration and development activities will be achieved; that there will be no material adverse change affecting the Company or its properties; and such other assumptions as set out herein. Forward-looking statements are made as of the date hereof and the Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or results or otherwise, except as required by law. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on forward-looking statements.  

 

  ABOUT Metallum Resources  

 

  Metallum Resources (MZN.TSXV   ) owns 100% of the Superior Lake Zinc and Copper Project in Ontario, Canada.  The Project ranks as the highest-grade zinc project in North America with a resource of 2.35 Mt at 17.9% Zn, 0.9% Cu, 0.4 g/t Au and 34 g/t Ag.  

 

  The Company completed a positive Feasibility Study that highlights the Project will rank in the lowest quartile of operating costs (C1 costs – C$0.44 / lb; AISC C$0.51 / lb).  These low costs driven by the high grade of the Project drive robust economic returns. The majority of permits and licenses are in place allowing for a quick re-development following a Final investment Decision.  

 

  For further details about the Company and the Superior Project, please visit the Company's website at     metallumzinc.com     .  

 

    
Click Image To View Full Size
 

 

Copyright (c) 2022 TheNewswire - All rights reserved.

 

News Provided by TheNewsWire via QuoteMedia

MZN:CA
The Conversation (0)
Metallum signs Negotiation Agreement with the Pays Plat First Nation

Metallum signs Negotiation Agreement with the Pays Plat First Nation

 

(TheNewswire)

 Metallum Resources Inc.

  HIGHLIGHTS  

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Metallum Resources: Copper and Zinc, CEO Clip Video

Metallum Resources: Copper and Zinc, CEO Clip Video

Metallum Resources Inc. (TSXV: MZN) (OTCQB: MTLLF is developing a high-grade zinccopper project in Ontario. BTV chats with President & CEO, Kerem Usenmez to learn more.

Metallum Resources Inc. (TSXV: MZN) (OTCQB: MTLLF) 

https://www.metallumzinc.com/

About CEO Clips:

CEO Clips is the largest library of publicly traded company CEO videos in Canada and the US. These 60 second video profiles broadcast on national TV and online via 12 financial sites including: Thomson Reuters, Bloomberg, Yahoo! Finance and Stockhouse.com.

BTV - Business Television/CEO Clips

Discover Companies to Invest in

www.b-tv.com

Contact: Trina Schlingmann (604) 664-7401 x 5 trina@b-tv.com 

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/127151

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
NPV increases to C$383M with average EBITDA of C$102m pa for Superior Lake Zinc Project

NPV increases to C$383M with average EBITDA of C$102m pa for Superior Lake Zinc Project

 

(TheNewswire)

 Metallum Resources Inc.

  HIGHLIGHTS  

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Metallum Resources completes $5.2 million private placement to advance the development of the Superior Lake Zinc Project and Board changes

Metallum Resources completes $5.2 million private placement to advance the development of the Superior Lake Zinc Project and Board changes

 

(TheNewswire)

 Metallum Resources Inc.

April 21, 2022 TheNewswire - Vancouver, British Columbia: Metallum Resources Inc. (TSXV:MZN) is pleased to report that it has closed its previously announced non-brokered private placement with the issuance of 87,371,674 units at $0.06 each, for gross proceeds of $5,242,300.  Each unit consists of one common share of the Company and one warrant which entitles the holder to purchase one additional common share at $0.14 for two years from closing.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Metallum Resources increases proposed non-brokered private placement financing to $5.242 million

Metallum Resources increases proposed non-brokered private placement financing to $5.242 million

 

(TheNewswire)

 Metallum Resources Inc.

April 8, 2022 TheNewswire - Vancouver, British Columbia - Metallum Resources Inc. (TSXV:MZN) is pleased to report that its previously announced non-brokered private placement has been oversubscribed and, subject to TSX Venture Exchange approval, has been increased to 87.37 million units at $0.06 each, to raise gross proceeds of up to $5.242 million. Each unit consists of one common share of the Company and one warrant which will entitle the holder to purchase one additional common share at $0.14 for two years from closing.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Finlay Minerals Announces Increased Budget for PIL and ATTY Projects

Finlay Minerals Announces Increased Budget for PIL and ATTY Projects

 
 

Finlay Minerals Ltd . (TSXV: FYL,OTC:FYMNF) (OTCQB: FYMNF), the "Company", is pleased to announce that the approved budget under the Earn-In Agreements with Freeport-McMoRan Mineral Properties Canada Inc. ("Freeport") 1 for both the PIL and ATTY Projects, has been increased to a total of $3.6 million .

 
 

  Finlay Minerals Ltd. logo (CNW Group/Finlay Minerals Ltd.) 

 

Both projects are situated in the highly prospective Toodoggone District of British Columbia , which continues to develop as an important copper-gold (Cu-Au) district with significant potential for further discoveries.

 

Initially, the 2025 budget was set at a minimum of $750,000 for the PIL property and $500,000 for the ATTY property. However, these amounts have now been revised to up to $2.6 million for the PIL project and up to $1.0 million for the ATTY project. Both programs are fully funded under the Earn-In Agreements with Freeport . According to these agreements, Freeport may earn an 80% interest in each property by investing a total of $35 million in exploration expenditures and making cash payments totaling $4.1 million over/up to six years.   2 Until the Finlay-Freeport Earn-In Agreements complete, Finlay owns 100% of both properties.

 

The PIL   Property lies in the heart of the Toodoggone region and features several porphyry copper-gold (Cu-Au) targets, along with associated epithermal gold-silver (Au-Ag) mineralization.  To date, 18 porphyry Cu ± Mo ± Au and porphyry-related low- and high-sulphidation epithermal Au-Ag occurrences have been outlined on the PIL Property. The PIL property is adjacent to Amarc Resources and Freeport-McMoRan's JOY Project, as well as TDG Gold Corp.'s Shasta/Baker and Sofia Properties. It is also situated 25 kilometres ("km") northwest of Centerra Gold's former Kemess South Mine and 15 km east of Thesis Gold's Lawyers Project.

 

The ATTY Property covers 3,875 hectares of sub-alpine terrain in the southern Toodoggone region, an area known for significant porphyry copper-gold (Cu-Au) and epithermal gold-silver (Au-Ag) deposits. It is located between Centerra Gold's Kemess Project and the JOY Project, held by Amarc Resources and Freeport-McMoRan. The KEM target on the ATTY Property resembles the Kemess North Trend, which is home to the Kemess Underground and Kemess East deposits. Exploration will focus on the Wrich target, located near the copper geochemical anomaly at the SWT target on the JOY Property. This anomaly extends over 2 km and continues onto the ATTY Property for an additional 1.2 km to the southeast.

 

  The 2025 programs at the PIL and ATTY are well underway with:  

 
  • Detailed property-wide, 100 metre line-spaced airborne magnetic surveys completed on both properties;

  •  
  • Detailed geological and alteration mapping and expanded rock and soil sampling on up to 8 target areas on the PIL underway, with the ATTY expected to start by the end of July;

  •  
  • 53 line-km of induced polarization ("IP") geophysical surveys planned on the PIL and 16 line-km on the ATTY, and

  •  
  • Finlay acting as the Operator on both properties.
  •  

Finlay's President and CEO, Ilona Lindsay , states :  

 

  "We are very pleased with the substantial increase in approved funding for both the PIL and the ATTY. This additional funding will allow us to identify and prioritize as many targets as possible for drilling in 2026."  

 

  References:  

 
  1. Freeport-McMoRan (FCX) is a leading international metals company focused on copper, with major operations in the Americas and Indonesia and significant reserves of copper, gold, and molybdenum.

  2.  
  3. Finlay news releases NR 03-25 dated April 17, 2025 entitled: "  Finlay Minerals Enters into Earn-In Agreements with Freeport for its PIL & ATTY Properties " and NR 05-25 dated May 2, 2025 and entitled: "  Finlay Minerals Receives TSX Venture Exchange Approval for PIL Earn-In Agreement. "
  4.  

  Qualified Person:  

 

  Wade Barnes , P. Geo. and Vice President, Exploration for Finlay Minerals and a qualified person as defined by National Instrument 43-101, has approved the technical content of this news release.

 

  About finlay minerals ltd.  

 

Finlay is a TSXV company focused on exploration for base and precious metal deposits with five properties in northern British Columbia :

 

Finlay trades under the symbol "FYL" on the TSXV and under the symbol "FYMNF" on the OTCQB. For further information and details, please visit the Company's website at www.finlayminerals.com   .  

 

  On behalf of the Board of Directors,  

 

  Robert F. Brown ,
Executive Chairman of the Board

 

  Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release.  

 

   Forward-Looking Information:    This news release includes certain "forward-looking information" and "forward-looking statements" (collectively, "forward-looking statements") within the meaning of applicable Canadian securities legislation. All statements in this news release that address events or developments that we expect to occur in the future are forward-looking statements.  Forward-looking statements are statements that are not historical facts and are generally, although not always, identified by words such as "expect", "plan", "anticipate", "project", "target", "potential", "schedule", "forecast", "budget", "estimate", "intend" or "believe" and similar expressions or their negative connotations, or that events or conditions "will", "would", "may", "could", "should" or "might" occur. All such forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Forward-looking statements in this news release include statements regarding, among others, the exploration plans for the PIL & ATTY Properties. Although Finlay believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploration successes, and continued availability of capital and financing and general economic, market or business conditions. These forward-looking statements are based on a number of assumptions including, among other things, assumptions regarding general business and economic conditions, the timing and receipt of regulatory and governmental approvals, the ability of Finlay and other parties to satisfy stock exchange and other regulatory requirements in a timely manner, the availability of financing for Finlay's proposed transactions and programs on reasonable terms, and the ability of third-party service providers to deliver services in a timely manner. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. Finlay does not assume any obligation to update or revise its forward-looking statements, whether as a result of new information, future or otherwise, except as required by applicable law.  

 

SOURCE finlay minerals ltd. 

 

 

 

 Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2025/17/c1585.html  

 
 

 

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Juggernaut Closes $1,000,000 $0.64 Unit Private Placement Financing

Juggernaut Closes $1,000,000 $0.64 Unit Private Placement Financing

 

(TheNewswire)

 
        
  Juggernaut Exploration Ltd. 
                   
 

Vancouver, British Columbia TheNewswire - July 17, 2025 Juggernaut Exploration Ltd. (TSX-V: JUGR) (OTCQB: JUGRF) (FSE: 4JE) (the "Company" or "Juggernaut"), further to its July 3, 2025, news release the Company is pleased to announce that it has received approval from the TSX Venture Exchange to close its private placement financing (the "Financing") for aggregate gross proceeds of $1,000,000.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Forte Minerals Secures C$5.7 Million Strategic Investment to Advance Alto Ruri Project

Forte Minerals Secures C$5.7 Million Strategic Investment to Advance Alto Ruri Project

 

"Not for distribution to United States newswire services or for dissemination in the United States."

 

Forte Minerals Corp . (" Forte " or the " Company ") ( CSE: CUAU ) ( OTCQB: FOMNF ) ( Frankfurt: 2OA ) is pleased to announce a non-brokered private placement with a strategic investor (the " Investor "), who will acquire 6,326,066 common shares at a price of C$0.90 per share for gross proceeds of approximately C$5,693,459 (the " Strategic Placement "). Upon closing of the Strategic Placement, the Investor will own 9.99% of Forte's issued and outstanding common shares on a non-diluted basis, establishing a meaningful long-term position in Forte's growth and exploration strategy.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Noble Mineral highlights Mann Central Nickel Sulphide Initial Resource as announced by Canada Nickel

Noble Mineral highlights Mann Central Nickel Sulphide Initial Resource as announced by Canada Nickel

 

(TheNewswire)

 
       
  Noble Mineral Exploration Inc. 
                
 

TORONTO, July 16, 2025 TheNewswire - Noble Mineral Exploration Inc. (" Noble " or the " Company ") (TSXV: NOB,OTC:NLPXF) (OTCQB: NLPXF) is pleased to announce the initial mineral resource at Mann Central as announced by its joint venture partner Canada Nickel in the East Timmins Nickel Company, operating in the Timmins area of Northern Ontario.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×