Beyond Lithium Completes Phase 1 Exploration On 39 Properties in Ontario

Beyond Lithium Completes Phase 1 Exploration On 39 Properties in Ontario

Phase 2 Exploration Set To Begin As Planned In Early August

HIGHLIGHTS 

  • The Phase 1 exploration program has been completed on 39 of Beyond Lithium's 64 properties, covering an area of more than 107,000 hectares. 

  • Over 700 grab and channel samples have been collected and submitted to the lab for analysis. 

  • Over 160 mineral samples of muscovite or feldspar from different properties have been collected for LIBS (Laser Induced Breakdown Spectroscopy) analysis. 

  • LIBS vectoring results of Beryl pegmatites at the Cosgrave Lake property demonstrated a similar Lithium (Li), Cesium (Cs), and Rubidium (Rb) intensity footprints to the nearby Swanson Beryl mineral occurrence. The Swanson beryl pegmatite is located 1.8 km north of the Cosgrave Lake property and 1.2 km southwest of a Li bearing spodumene pegmatite recorded as the Mnw mineral occurrence(3).

  • Ten properties are moving to Phase 2 exploration in early August. 

  • Preliminary results received from the LiDAR survey completed at the Wisa property. The final report is expected to be available soon. 

  • The Phase 1 program on three properties (11,818 ha) in the Case Lake District and eight properties (12,107 ha) in the McKenzie Bay District have been delayed due to Ontario wildfire access restriction. 

  • A total of 14 properties (15,645 ha) in the Pak & Spark, Lilly Pad Lake, and Eastern English Districts have been rescheduled from the shortage of helicopter availability due to Ontario wildfires. 

  • Properties impacted by the forest fire restrictions will see resumption of Phase 1 programs as soon as those districts reopen.

Winnipeg, Manitoba--(Newsfile Corp. - July 19, 2023) - Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to provide an update on the Phase 1 exploration program and to announce its plans to initiate the Phase 2 exploration program on ten different properties in early August.

"In two short months, we were able to complete Phase 1 exploration on a total of 39 properties covering an area of more than 107,000 hectares," said Allan Frame, President and CEO of Beyond Lithium. "Our four field teams supervised by Beyond Lithium's Senior Geologist, Paul Baxter, collected more than 700 grab and channel samples and over 160 mineral samples of muscovite or feldspar from different properties for lab and LIBS analysis. Results warrant moving to Phase 2 exploration on ten of the 39 properties explored to date."

Mr. Frame added: "More properties will be included in the Phase 2 exploration program as assays from the lab become available. This next phase will include detailed mapping to determine the length and the density of pegmatites identified on our properties and systematic trenching and channel sampling of pegmatites in tightened exploration target area delineated by analytical assays and LIBS analysis."

Lawrence Tsang, VP Exploration of Beyond Lithium, also commented: "A limited number of assays have been received and more results are expected to be available in about a week. The rest of the assays will become available roughly every one to two weeks. Samples submitted to the lab in Ontario usually have a four-to-six-week turnaround time, although we are seeing some assays results taking longer given the current level of exploration being conducted throughout Ontario. We will publish the complete assay results from a particular property when all the results for that property are received from the lab."

Overview of Phase 2 Program

The Phase 2 exploration program is expected to begin in early August as planned and will include more detailed mapping, trenching and sampling on selected properties with tightened exploration target areas delineated from analytical results and LIBS vectoring. Based on an initial evaluation, Phase 2 properties will include (Figure 2):

  • Cosgrave Lake (7,388 ha) which has two identified beryl bearing pegmatites with similar footprint to nearby Swanson's beryl and Mnw spodumene mineral occurrences(3).
  • Ogani Lake (1,427 ha) properties with identified beryl bearing pegmatites.
  • Webb (3,580 ha) (West and East) and Gullwing-Tot (645 ha) properties that are along trend of Green Technology Metals' Gullwing-Tot Lake Property (ASX: GT1)4 with 8 km of LCT pegmatites clusters.
  • McKenzie Bay (6,186 ha) and Gathering Lake (6,948 ha) properties (South, West and East) with relatively higher LIBS analyzed of Li.
  • MacDowell Lake (4,137 ha) property that is along trend of and has similar airborne geophysical magnetic anomalies by Ontario Geological Survey5 to Frontier Lithium's (TSXV: FL) Pak & Spark deposits.

More properties are expected to be included in the Phase 2 program as more assays become available from the lab. Beyond Lithium's 2023 exploration program is still on schedule and within budget and will include a small drill program near the end of the season.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_004.jpg

Figure 1 Beyond Lithium Properties Phase 1 Program Update Map

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_004full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_005.jpg

Figure 2 Beyond Lithium Phase 2 Program Based on Initial Assessment

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_005full.jpg

The Importance of a LIBS Analyzer

Beyond Lithium's exploration team have made extensive use of a LIBS analyzer, taking thousands of onsite readings which are being compiled in a comprehensive database. A LIBS analyzer is a handheld sample analyzing device used to measure elemental concentrations in material1 which takes a few minutes in the field to collect the data. The analysis of the over 160 mineral samples of muscovite or feldspar will help develop relativity plots of different elements and ratios like lithium (Li), caesium (Cs), tantalum (Ta), and potassium/rubidium (K/RB) to vector and prioritize exploration targets for the Phase 2 program.

The objective of the LIBS database is to provide an additional layer of relative values of Li, Cs, Ta, K/Rb from muscovite or feldspar to augment results from mapping and assaying for establishing and vectoring Li trends and targets.

Cosgrave Lake Property

The Cosgrave Lake property encompasses 7,388 ha in area and is located 125 NE of the city of Thunder Bay that can be accessed via highway and logging roads. The Cosgrave Lake property is adjacent to the Jackpot lithium project of Imagine Lithium (TSXV: ILI) that has a historical resource of 2 million tonnes at 1.09% Li2O2.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_006.jpg

Figure 3 Large Beryl Crystal Outlined in Yellow from Cosgrave Lake Property's Pegmatite

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_006full.jpg

Phase 1 program has led to the discovery of two beryl pegmatite dykes with beryl crystal noted up to 25cm wide in diameter which have been mapped and sampled on the western side of the Cosgrave Lake property circled in yellow in Figures 3 and 4. These beryl pegmatite dykes generally strike in a north-south direction, but local cross cutting pegmatites were observed showing different generations of pegmatites hosted in both granite and metasedimentary host rocks. The presence of pegmatites striking in different orientations shows the abundance of pegmatite potential in the area and geologically shows a good structural zone for pegmatite formation.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_009.jpg

Figure 4 Cosgrave Lake Property Geological Map with 2023 Field Mineralogy of Pegmatite in Relation to the Swanson Beryl
and the Mnw Spodumene Pegmatites Showings

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_009full.jpg

Based on Rennick's Exploration Work 2009's report3, the Swanson mineral occurrence with a mapped beryl pegmatite dyke is located just 1.8 km north of the Cosgrave Lake property. Five grab samples were collected from the Swanson pegmatite with elevated Li, Cs, and Rb towards the Mnw's showing which is about 1.2 km northwest from the Swanson showing. The Mnw mineral occurrence is a spodumene bearing pegmatite with up to 5.85% Li2O from a grab sample3. The Swanson and the Mnw mineral occurrences are circled in red in Figure 4.

On Beyond Lithium's Cosgrave Lake property, two beryl pegmatites were discovered and sampled and analyzed by LIBS analyzer. The LIBS results of the two beryl pegmatites at the Cosgrave Lake property showed an elevated Li, Cs, and Rb footprint that resembles the Swanson pegmatite (Figures 5 to 7). Complete assay results will be published by Beyond Lithium once all results are received from the lab.

Lawrence Tsang, VP Exploration of Beyond Lithium, commented: "It is exciting to see the Cosgrave Lake property having a similar footprint as the Swanson and Mnw mineral occurrences where a Li spodumene bearing pegmatite is located just less than 2 km NW of the beryl occurrence. We have identified two beryl bearing pegmatites on our Cosgrave Lake property which are both to the north and to the south of the beryl pegmatites and are still open for over 3km in strike length to prospect for the potential Li bearing zone. Our crews are looking forward to getting back to Cosgrave Lake property in early to mid August to follow up on these beryl pegmatites." Mr. Tsang continues, "Based on the similar footprint between the Cosgrave Lake's beryl pegmatites and the Swanson beryl pegmatite, a Phase 2 program is planned on the Cosgrave Lake property in August. The purpose of this program is to follow up on the beryl pegmatites to explore for the potential Li bearing core zone to the north and south of the beryl pegmatites."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_010.jpg
Figure 5 Cosgrave Lake Property 2023 Mineralogy Map with LIBS Rb Intensity Plot

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_010full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_011.jpg
Figure 6 Cosgrave Lake Property 2023 Mineralogy Map with LIBS Cs Intensity Plot

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_011full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_012.jpg

Figure 7 Cosgrave Lake Property 2023 Mineralogy Map with LIBS Li Intensity Plot

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_012full.jpg

Wisa Lake LiDAR Survey

The LiDAR survey on the Wisa Lake property was completed by Eagle Mapping last month (Figure 8). The Wisa Lake property is comprised a total area of 6,549 hectares and is located next to the Green Technology Metals' (ASX: GT1) Wisa Property. As the topography of the area is generally flat, a subtle change to elevation high may indicate pegmatite outcrops or features worthwhile to prospect. A preliminary result form the LiDAR survey has been provided by Eagle Mapping. A preliminary assessment has been started to access any indication of prospective outcrops for the Phase 2 program.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_013.jpg
Figure 8 Wisa Lake Property and LiDAR Surveyed Area in Red

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8620/174042_7547cfaed453a8ed_013full.jpg

Forest Fires Update

Due to forest fires in various districts, a total of 14 properties (15,645 ha) in the Pak & Spark, Lilly Pad Lake, and Eastern English Districts have been rescheduled due to a shortage of helicopters. Exploration at three properties (11,818 ha) which are contiguous to Power Metals' Case Lake lithium property (TSXV: PWM) in the Case Lake District and eight properties (12,107 ha) in the McKenzie Bay District has been delayed due to access restriction. The Phase 1 program will resume on these affected properties as the districts reopen later in the season.

Notes:

1See Sci Aps LIBS Analyzers

2See Imagine Lithium (TSXV: ILI) Jackpot Property

3Rock Tech Resources Inc. James Bay Midarctic Development Inc. Report on Exploration Work 2009, Georgia Lake Lithium and Rare-Earths Project, by Melville William Rennick, 2010.

4See Green Technology Metals (ASX: GT1) May 18 2023 Press Release

5Ontario Geological Survey, Ontario Airborne Geophysical Surveys Magnetic Supergrids, 2017, Red Lake.

Quality Assurance/Quality Control

All collected rock samples were put in sturdy plastic bags, tagged, and sealed at site. Sample bags were then put in rice bags and kept securely before being sent by road transport or delivered by the crew supervisor to SGS's preparation facility in Red Lake or Sudbury, Ontario, for sample preparation. Pulps are analyzed at the SGS facility in Burnaby, BC. All samples are analyzed with Four-Acid Digestion/Combined ICP-AES/MS package (49 elements). The QA/QC protocol included the insertion and monitoring of appropriate reference materials, in this case high concentration and low concentration certified OREAS and CDN lithium standards to validate the accuracy and precision of the assay results.

Qualified Person and Third-Party Data

The scientific and technical information in this news release has been reviewed and approved by Lawrence Tsang, P.Geo., VP Exploration of the Company. Lawrence Tsang is a "qualified person" as defined in National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Beyond Lithium Inc.

Beyond Lithium Inc. is the largest greenfield lithium exploration player in Ontario with 64 high potential greenfield lithium properties totalling over 150,000 hectares. The Company has adopted the project generator business model to maximize funds available for exploration projects, while minimizing shareholder dilution. Beyond Lithium is advancing certain of its projects with its exploration team and will seek to option other properties to joint venture partners. Partnering on various projects will provide a source of non-dilutive working capital, partner-funded exploration, and long-term residual exposure to exploration success.

Beyond Lithium currently has 28,259,658 common shares outstanding.

Please follow @BeyondLithium on Twitter, Facebook, LinkedIn, InstagramandYouTube.

For more information, please refer to the Company's website at www.beyondLithium.ca

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION: This news release includes certain "forward-looking information" within the meaning of applicable Canadian securities legislation. All statements, other than statements of historical fact, included herein including, without limitation, statements regarding future capital expenditures, anticipated content, commencement, and cost of exploration programs in respect of the Company's projects and mineral properties, anticipated exploration program results from exploration activities, resources and/or reserves on the Company's projects and mineral properties, and the anticipated business plans and timing of future activities of the Company, are forward-looking information. Although the Company believes that such statements are reasonable, it can give no assurance that such expectations will prove to be correct. Often, but not always, forward-looking information can be identified by words such as "pro forma", "plans", "expects", "will", "may", "should", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates", "believes", "potential" or variations of such words including negative variations thereof, and phrases that refer to certain actions, events or results that may, could, would, might or will occur or be taken or achieved. In stating the forward-looking information in this news release, the Company has applied several material assumptions, including without limitation, that market fundamentals will result in sustained precious and base metals demand and prices, the receipt of any necessary permits, licenses and regulatory approvals in connection with the future exploration of the Company's properties, the availability of financing on suitable terms, and the Company's ability to comply with environmental, health and safety laws.

Forward-looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to differ materially from any future results, performance or achievements expressed or implied by the statements of forward-looking information. Such risks and other factors include, among others, statements as to the anticipated business plans and timing of future activities of the Company, the proposed expenditures for exploration work on its properties, the ability of the Company to obtain sufficient financing to fund its business activities and plans, delays in obtaining governmental and regulatory approvals (including of the Canadian Securities Exchange), permits or financing, changes in laws, regulations and policies affecting mining operations, risks relating to epidemics or pandemics such as COVID-19, the Company's limited operating history, currency fluctuations, title disputes or claims, environmental issues and liabilities, as well as those factors discussed under the heading "Risk Factors" in the Company's prospectus dated February 23, 2022 and other filings of the Company with the Canadian securities regulatory authorities, copies of which can be found under the Company's profile on the SEDAR website at www.sedar.com.

Readers are cautioned not to place undue reliance on forward-looking information. The Company undertakes no obligation to update any of the forward-looking information in this news release except as otherwise required by law.

For further information, please contact:

Allan Frame
President and CEO
Tel: 403-470-8450
Email: allan.frame@beyondLithium.ca

Jason Frame
Manager of Communications
Tel: 587-225-2599
Email: jason.frame@beyondLithium.ca

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/174042

News Provided by Newsfile via QuoteMedia

BY:CC
Beyond Lithium

Beyond Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

The Conversation (0)
Beyond Lithium (CSE:BY)

Beyond Lithium


Keep reading...Show less
Beyond Lithium Announces Unit Offering for Gross Proceeds of up to $500,000, Amendments to Property Option Agreements and Exploration Program Update for Cosgrave, Ear Falls, And Victory

Beyond Lithium Announces Unit Offering for Gross Proceeds of up to $500,000, Amendments to Property Option Agreements and Exploration Program Update for Cosgrave, Ear Falls, And Victory

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to announce: (i) a proposed non-brokered private placement of up to 10-million units of the Company (the "Units") at a price of $0.05 per Unit for aggregate gross proceeds of up to $500,000 (the "Offering"); (ii) amendments to its existing property option agreements with Bounty Gold Corp. and Last Resort Resources Ltd. (collectively, the "Optionors"); and (iii) an exploration program update for its Cosgrave, Ear Falls, and Victory projects.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium Closes Flow-Through Offering for Gross Proceeds of $500,000

Beyond Lithium Closes Flow-Through Offering for Gross Proceeds of $500,000

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium"), today announced the completion of a non-brokered private placement of 2.5 million common shares in the capital of the Company that will qualify as "flow-through shares" (within the meaning of subsection 66(15) of the Income Tax Act (Canada)) (the "Flow-Through Shares") at a price of $0.20 per share for aggregate gross proceeds of $500,000 (the "Offering").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium Announces Flow-Through Offering for Gross Proceeds Of $500,000

Beyond Lithium Announces Flow-Through Offering for Gross Proceeds Of $500,000

Beyond Lithium Inc. (CSE:BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium"), today announced a proposed non-brokered private placement of 2.5 million common shares of the Company that will qualify as "flow-through shares" (within the meaning of subsection 66 (15) of the Income Tax Act (Canada) (the "Flow-Through Shares") at a price of $0.20 per share for aggregate gross proceeds of $500,000 (the "Offering").

The gross proceeds from the Offering will be used by the Company to incur eligible "Canadian exploration expenses" that will qualify as "flow-through critical mineral mining expenditures" as such terms are defined in the Income Tax Act (Canada) (the "Qualifying Expenditures") related to the Company's projects in Ontario. All Qualifying Expenditures will be renounced in favour of the subscribers of the Flow-Through Shares effective December 31, 2024.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium and Its Exploration Team Recognized with Bernie Schnieders Discovery of the Year Award

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium") is pleased to announce that the Company and its exploration team have been awarded the prestigious 2023 Bernie Schnieders Discovery of the Year Award for the spodumene discovery at its Victory Project in Ontario, Canada.

The award, presented by the Northwestern Ontario Prospectors Association (NWOPA), annually recognizes an exceptional discovery in Northwestern Ontario during the previous calendar year. It was presented on April 24 to Beyond Lithium and its exploration team at the annual awards banquet hosted during the 2024 Ontario Prospectors Exploration Showcase in Thunder Bay, Ontario. Past recipients of this prestigious award include Great Bear Resources Inc., Frontier Lithium Inc. and Delta Resources Ltd.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Beyond Lithium Finalizes Make up of Lithium Exploration Portfolio in Ontario

Beyond Lithium Finalizes Make up of Lithium Exploration Portfolio in Ontario

Highlights

  • No option cash payments due until August 31st, 2024.
  • The four primary projects are: the Victory Spodumene, the Ear Falls Spodumene, the Cosgrave Lake, and the Wisa Lake Projects where the exploration priorities will include advanced mapping and sampling programs to delineate more targets for mechanical stripping as well as diamond drilling.
  • Beyond Lithium's 2024 portfolio will consist of a total of 27 projects totalling over 119,000 hectares each either meriting further exploration or are part of joint venture and option discussions with interested parties.
    • Four primary projects.
    • Additional 23 projects located within well-known districts with significant LCT pegmatites discoveries and deposits.
  • Continue to engage and consult with the Ontario Ministry of Mines and the Aboriginal Communities as part of its current Exploration Permit applications for the Ear Falls Spodumene and the Victory Spodumene Projects.

Beyond Lithium Inc. (CSE: BY) (OTCQB: BYDMF) (the "Company" or "Beyond Lithium"), today announced the list of projects which will form part of its exploration portfolio going into the 2024 season. The Company also announced that it has entered into a binding letter of intent with Bounty Gold Corp. ("Bounty Gold") and Last Resorts Resources Ltd. ("Last Resort") to amend the terms of the March 30, 2023 option agreements between the parties (the "March 2023 Agreements").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  CERENERGY Battery Project Funding Update

Altech Batteries Ltd CERENERGY Battery Project Funding Update

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce an update on funding of the CERENERGY(R) sodium-chloride solid-state battery project in Saxony, Germany.

Highlights

- Financing plan and target structure in place

- Funding investment teaser documents and data room established

- Reach out to 10 commercial banks and 2 venture debt funds - all positive interests

- Shortlisting potential lead bank

- Equity Funding - potential sale of minority interest of the project to realise capital and strategic value

- Discussions and draft term sheets shared with investors

- Offtake agreement LOI signed with ZISP

On 14 June 2024, the Company, through its Germany subsidiary Altech Batteries GmbH ("ABG"), announced the appointment of global big four professional services firm ("funding adviser") to assist in securing finance for the construction of Altech's 120MWh CERENERGY(R) battery manufacturing plant in Germany. The project's financing strategy is structured across three key areas: debt, equity, and grants.

These sources will cover not only the capital expenditures but also financing costs, working capital, debt service coverage, and an additional contingency for potential business interruptions, See Figure 1*.

DEBT PROCESS

A funding invitation document (investment teaser) has been finalised and distributed to various financial institutions for debt funding in the project. The Group has engaged ten commercial banks and two venture debt funds in a first market round, receiving predominantly positive initial feedback. Several of these institutions have expressed strong interest in participating in the financing. The Group is now in the process of shortlisting potential lenders to identify the most suitable financial partners for the project. To support a thorough due diligence process, a secure data room has been set up, providing detailed project information to interested financiers and ensuring full transparency. The DFS financial model has been adjusted to stress-test various funding scenarios tailored to the lending institutions ABG has engaged with. Further steps involve determining the most suitable banks to form a syndicate and appointing a lead bank to guide the lending process. This syndicate will play a crucial role in structuring the financing arrangement to meet the project's requirements.

EQUITY FUNDING

In addition to ongoing debt financing efforts, the Group has engaged several equity advisers to support the equity component of the project's funding package. As part of this strategy, the Altech Group plans to divest a minority interest in the project to one or two strategic investors. This partial divestment aims to attract investors who can bring not only capital, but also strategic value to the project, aligning with the CERENERGY(R) project's long-term growth and sustainability objectives.

The Group is specifically targeting large utility groups, data centre operators, investment funds and corporations that are heavily involved in the green energy transition. These entities are seen as ideal partners due to their strong alignment with the project's focus on sustainable energy solutions, as well as their capacity to provide substantial financial backing.

To date, significant progress has been made in these equity discussions. Several Non-Disclosure Agreements (NDAs) have been signed, allowing for deeper engagement with prospective investors. Altech has also circulated draft term sheets to a number of interested parties, outlining the proposed terms and conditions for investment. These documents serve as a starting point for negotiations, paving the way for more detailed discussions regarding the potential equity stake and partnership structure.

The strategic decision to divest a portion of the project is aimed at reducing the overall financial burden on the Company while bringing in experienced partners who can contribute to the project's success. By securing both the equity and debt components, the Company aims to finalise the full financing package, ensuring the timely construction and commissioning of the CERENERGY(R) battery plant. The next steps will focus on advancing these discussions and converting interest into formal commitments, which are crucial for moving forward with the project.

OFFTAKE ARRANGEMENTS

On 13 September 24, Altech announced the execution of an Offtake Letter of Intent between Zweckverband Industriepark Schwarze Pumpe (ZISP) and Altech Batteries GmbH. Under this Offtake Letter of Intent (LOI), ZISP will purchase 30 MWh of energy storage capacity annually, consisting of 1MWh GridPacks, for the first five years of production. The price of these batteries has been agreed and aligns with the sales price contained within Altech's Definitive Feasibility Study. The purchase of these batteries is subject to performance tests, battery specifications and the batteries meeting customer requirements. This offtake LOI constitutes an important aspect of the financing process. This lays the foundation for additional offtake arrangements, which are currently in progress. These agreements are vital for advancing our financing and construction timelines for the CERENERGY(R) project.

CEO and MD Mr Iggy Tan stated "The funding stage of any project is the most complex and challenging process of any project. Securing a big four funding adviser with expertise and a global network is a major step in our financing efforts. Altech is advancing both debt and equity discussions, along with offtake agreements, to fully fund the CERENERGY(R) project. We are seeing strong interest, especially from European banks and potential equity partners".

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/PO741A78

To view MD Iggy Tan explain the Funding, please visit:
https://www.abnnewswire.net/lnk/23705649



About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. (CSE: EPR) ("E-Power" or the "Company") announces that it has closed a third and final tranche of the private placement previously announced on September 24, 2024 (the "Private Placement"). The oversubscribed private placement was originally announced for $420,000, but a total of $526,264 was raised in all three tranches.

An aggregate of 3,150,000 units (the " Units") of the Company were issued in the third and final tranche at a price of $0.05 per Unit for gross proceeds of $157,500, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date. (the "Offering").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Mawson Finland Limited Presents Downhole EM  Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited Presents Downhole EM Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce results from downhole electro-magnetic "DHEM" geophysical surveys conducted at the Rajapalot gold-cobalt project in Finland

Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Canadian Investment Regulatory Organization Trade Resumption - EDDY

Canadian Investment Regulatory Organization Trade Resumption - EDDY

Trading resumes in:

Company: Edison Lithium Corp.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Arranges Sale of Interest in Argentinian Lithium Properties for US$3.5 Million

Edison Lithium Corp. (TSXV: EDDY) (OTC Pink: EDDYF) (FSE: VV0) ("Edison" or the "Company") is pleased to announce that, effective November 12, 2024, it has accepted a non-binding purchase offer letter from Mava Gasoil LLC ("Mava"), a corporation based in Houston Texas, for the sale of 100% of the interest in the Company's Argentina subsidiary, Resource Ventures S.A. ("ReVe"), in consideration for USD$3,500,000. One of the LEXI claims owned by ReVe and the royalties on that mining property, and the PINAC mining properties owned by ReVe are excluded from the sale and will be retained by Edison.

ReVe controls the rights to prospective lithium brine claims in the province of Catamarca, Argentina. The claims are principally located in the two geologic basins known as the Antofalla Salar and the Pipanaco Salar. ReVe's assets on closing of the disposition to Mava will include 30 mining concessions covering approximately 104,538 hectares area in Catamarca Province, Argentina. The Company will retain and focus its Argentinian efforts on 8 mining concessions covering approximately 35,000 hectares area in Catamarca Province, Argentina, which are not subject to the sale and amount to approximately 25% of the claims currently held by ReVe.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

Argentina Lithium Announces Cancellation of the Non-Brokered Private Placement

/NOT FOR DISTRIBUTION TO UNITED STATES OR THROUGH U.S. NEWSWIRE SERVICES/

TSX Venture Exchange (TSX-V): LIT
Frankfurt Stock Exchange (FSE): OAY3
OTCQX Venture Market: LILIF

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Beyond Lithium

Beyond Lithium Investor Kit

  • Corporate info
  • Insights
  • Growth strategies
  • Upcoming projects

GET YOUR FREE INVESTOR KIT

Latest Press Releases

Related News

×