Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on the August 2022 operating results from the Farellon Copper-Gold (Cu-Au) mine located near La Serena, Chile.

During the month of August, approximately 5,000 tonnes of mineralized copper-gold material was produced at Farellon with approximately 3,227 tonnes shipped and processed. Production at Farellon achieved the maximum output capacity of 5,000 tonnes as the operations begins the transition from sales to ENAMI, to processing at the Company's El Peñón facility. The August production represents an increase of 20.2% over the July output with August processing at 3,227 tonnes increasing by 93% over the July figure of 1,667 tonnes processed. Copper grade continues to be strong with August coming in at 2.01% copper, representing an 18.9% improvement over July's copper grade of 1.69%. Increased production and good copper grades generated the highest amount of copper sales from Farellon in August at 136,753 pounds, representing an increase of greater than 44% over the 2022 monthly average of 95,000 pounds.

Revenue generated in August was approximately US$313,000 after processing costs, representing a 109% improvement over July's revenue of US$149,579. At August month end, an additional 1,900 tonnes were stockpiled at site with 2,136 tonnes in process at ENAMI. The revenue from this material will be credited in the following months after processing has been completed. Lower grade stocks of 1,400 tonnes have been shipped to the El Peñón processing facility in advance of startup. In addition, newly mined material is split shipped between ENAMI and El Peñón to maximize revenue and manage cash flows as the mill finalizes the commissioning process in advance of full-scale operation. In total, an estimated 3,470 tonnes are stockpiled at the mill and available for processing.

CEO Alastair McIntyre commented, "Farellon continues to demonstrate impressive results as we ramp up to full production to support our commissioned processing plant at El Peñón. Record total copper pounds were sold in August representing another important milestone as we complete the commissioning of the El Peñón processing facility."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/139189_b7211f91c41219bb_001.jpg
 
Figure 1. Comparative Monthly Review of Farellon Output (2021-2022)
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/139189_b7211f91c41219bb_001full.jpg
 

Figure 2. Comparative 2022 Income, Copper Contained and Grade

Month 2022USD Income*Copper PoundsCu grade %
January$277,84592,5942.07%
February$327,436105,7342.17%
March$304,79596,8711.96%
April$318,90597,9292.07%
May$377,545115,9892.00%
June$271,23596,1431.83%
July $149,57959,2161.69%
August$313,086136,7532.01%

 
*After processing costs

 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/139189_b7211f91c41219bb_002.jpg
 
Figure 3. Trucks Being Loaded for Transport
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/139189_b7211f91c41219bb_002full.jpg
 

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4303/139189_b7211f91c41219bb_003.jpg
 
Figure 4. Stockpiles at El Peñón
 
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4303/139189_b7211f91c41219bb_003full.jpg
 

The Hugo Decline continues the advance to the 344-level m where a total of 18.5 m has been completed to date of the expected total intersect length of 55 m. Intersection of the new level is expected in early November when mining will commence in NE and SW production sub-drifts.

About Altiplano
Altiplano Metals is a growing gold, silver, and copper company focused on the Americas. The Company has a diversified portfolio of assets that include an operating copper/gold/iron mine, development of near-term producing gold/copper projects, and exploration land packages with district-scale potential. Altiplano is focused on creating long-term stakeholder value through developing safe and sustainable production, reinvesting into exploration, and pursuing acquisition opportunities to complement its existing portfolio. Management has a substantial record of success in capitalizing on opportunity, overcoming challenges and building shareholder value. Altiplano trades on the Toronto Venture Exchange trading under the symbol APN and the Frankfurt Exchange under the symbol A2JNFG.

Altiplano has generated over US$9.86 million from the recovery and sale (after processing costs) of 4.47 million pounds of copper with an average grade of 1.78% Cu (2018 Q1-2022 Q2). Cash flow has been re-invested into equipment, underground drilling, expanding underground development at Farellon, enhancing ventilation to increase productivity and capacity, new underground development and exploration at Maria Luisa, and the commissioning of the El Peñón fit-for-purpose mill and flotation plant located 15 km from the Farellon site.

John Williamson, B.Sc., P.Geol., a Qualified Person as defined by NI 43-101, has reviewed, and approved the technical contents of this document

Altiplano is part of the Metals Group of companies. Metals Group is an award-winning team of professionals who stand for technical excellence, painstaking project selection and uncompromising corporate governance, with a proven ability to capitalize on investment opportunities and deliver shareholder returns.

www.metalsgroup.com

ON BEHALF OF THE BOARD

/s/ "John Williamson"
Chairman

For further information, please contact:
Alastair McIntyre, CEO
alastairm@apnmetals.com

Tel: (416) 434 3799

Jeremy Yaseniuk, Director
jeremyy@apnmetals.com
Tel: (604) 773-1467

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the (TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This release includes certain statements that may be deemed "forward-looking statements". All statements in this release, other than statements of historical facts, that address exploration drilling, exploitation activities and events or developments that the Company expects are forward-looking statements. A qualified person has not done sufficient work to classify any historical estimates as current mineral resources or mineral reserves and the issuer is not treating the historical estimates as current mineral resources or mineral reserves. The Farellon mine was previously in production dating back to the 1970's with a reported historical production (to a depth of 70 m) yielding approximately 300,000 tonnes at an average grade of 2.5% copper and 0.5g/t gold. This material was processed locally and sold to ENAMI. Altiplano is relying upon past production records, underground sampling and related activities and current diamond drilling to estimate grade and widths of the mineralization to reactivate production. The decision to commence production on the Farellon deposit is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and there is increased uncertainty and economic and technical risks of failure associated with any production decision. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and title and delays due to third party opposition, changes in government policies regarding mining and natural resource exploration and exploitation, and continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on the Company, investors should review the Company's continuous disclosure filings that are available at www.sedar.com.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/139189

News Provided by Newsfile via QuoteMedia

APN:CA
The Conversation (0)
Altiplano Reports Q4 2023 Operational Results at Farellon with Improved Cu Grade and Output

Altiplano Reports Q4 2023 Operational Results at Farellon with Improved Cu Grade and Output

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on Q4 2023 operation results from the Farellon Copper-Gold-Iron (Cu-Au-Fe) mine located near La Serena, Chile.

The Company extracted a total of 9,114 tonnes of mineralized Cu-Au material and processed 8,125 tonnes during Q4 2023 at Farellon. This represents a 12% and 13.6% increase respectively from the Q3 production and processing figures. Mine production in Q4 represented the highest quarterly production over the 2024-year period. Copper grade improved in Q4 to 1.87% representing an 8.7% increase from the 1.72% Cu recovered in Q3. Sales of 325,328 pounds of copper in 2023 Q4 generated approximately US$798,919 in revenue (after processing costs), an increase of 25% over the $639,458 revenue figure received in Q3 - an increase related mainly to processing higher Cu grade material.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Reports on Processing Updates with Production of Cu-Au and Iron Concentrates at El Penon

Altiplano Reports on Processing Updates with Production of Cu-Au and Iron Concentrates at El Penon

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to report on the progress at the El Peñón processing facility located approximately 15 kms from the Farellon copper-gold mine, 35 kms south of La Serena, Chile.

As part of the ongoing optimization process at the processing facility, several refinements focusing on the milling and flotation processes have been completed for the crushing, milling, and flotation circuits. These adjustments were designed to improve the overall milling process efficiencies and resulted in enhanced productivity, together with increased production of concentrates while completing ongoing adjustments.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Metals Announces Change in Financial Year End

Altiplano Metals Announces Change in Financial Year End

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") wishes to announce that it is changing its financial year-end to March 31 from its current year-end of December 31.

As a result, the Corporation will file an additional interim report as of December 31, 2023, and will report audited financial results for a 15-month transition year from January 31, 2023, to March 31, 2024 (with a comparative of the 12 months ended December 31, 2022). Afterwards, the Corporation will revert to a customary reporting calendar based on a March 31 year-end, with fiscal quarters ending on the last day of June, September and December and March each year.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Closes Private Placement

Altiplano Closes Private Placement

 Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to announce that it closed its previously announced non-brokered private placement (the "Offering") for gross proceeds of $600,000. The Offering consisted of 6,000,000 units (the "Units") at C$0.10 per Unit. Each Unit consists of one (1) common share and one (1) non-transferable share purchase warrant (the "Warrants") of the Company.

Each Warrant entitles the holder to acquire one (1) additional common share at a price of C$0.12 per share for two years from the closing date of the Offering provided that if the closing market price for the Company's common shares is equal to or greater than C$0.20 per share for a period of five (5) consecutive trading days at any point during the term (the "Acceleration Clause"), then the Company may deliver a notice that the Warrants must be exercised within thirty (30) days from the date of delivery of such Notice, otherwise the Warrants will expire at 4:30 p.m. (Vancouver time) on the thirty-first (31st) day after the date of delivery of the Notice.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altiplano Announces Private Placement

Altiplano Announces Private Placement

Altiplano Metals Inc. (TSXV: APN) (WKN: A2JNFG) ("Altiplano" or the "Company") is pleased to announce that it has arranged a non-brokered private placement (the "Offering") of up to 6,000,000 units (the "Units") at C$0.10 per Unit to raise up to C$600,000 in gross proceeds. Each Unit will consist of one (1) common share and one (1) non-transferable share purchase warrant (the "Warrants") of the Company.

Each Warrant will be exercisable to acquire one (1) additional common share at a price of C$0.12 per share for two years from the closing date of the Offering provided that if the closing market price for the Company's common shares is equal to or greater than C$0.20 per share for a period of five (5) consecutive trading days at any point during the term (the "Acceleration Clause"), then the Company may deliver a notice that the Warrants must be exercised within thirty (30) days from the date of delivery of such Notice, otherwise the Warrants will expire at 4:30 p.m. (Vancouver time) on the thirty-first (31st) day after the date of delivery of the Notice.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Industrial Minerals Limited

IND Establishes HPQ Exploration Target at Pippingarra Project

Industrial Minerals Ltd (ASX: IND or the Company) is pleased to announce a Maiden Exploration Target for High Purity Quartz (HPQ) at its Pippingarra Quarry Project (Pippingarra) located 30km south-east of Port Hedland, in the Pilbara region of Western Australia (Figure 1).

Keep reading...Show less
Firebird Metals

China-Based Battery Grade High-Purity Manganese Production Strategy

Investor Site Visit Presentation - April 2024

Firebird Metals Limited (ASX:FRB) is pleased to present its investor presentation.
Keep reading...Show less
  Summit Minerals Limited

Summit to Acquire Transformational Brazilian Niobium, Rare Earth & Lithium Portfolio

Summit Minerals Limited (ASX: SUM) (“Summit” or the “Company”) is excited to announce that it has signed binding agreements (“Agreements”) to acquire tenement packages highly prospective for rare earth elements (REE), niobium, and lithium. Term sheets were signed with vendors RTB Geologia & Mineracao Ltda (RTB), Sandro Arruda Silva Ltda. (SAS), and Mineracao Paranal Ltda (MPL) to acquire legal ownership and title over certain Exploration Permits and Applications for Exploration covering an area of 29,267 hectares in Minas Gerais and Paraiba States, Brazil (Figure 1; Table 2).

Keep reading...Show less
West Cobar Metals Limited

Positive Findings from Newmont Ti Benchmarking Study

West Cobar Metals Limited (ASX:WC1) (“West Cobar”, “the Company”) is pleased to provide an update on activities at its Salazar critical minerals project in Western Australia.

Keep reading...Show less
Augustus Minerals

High Grade Copper Rock Chips to 18% on New Targets at Ti-Tree

Augustus Minerals (ASX: AUG; “Augustus” or the “Company”) is pleased to advise the results of recent reconnaissance mapping and sampling at the Ti-Tree Project, located 200kms east of Carnarvon in Western Australia. The mapping, supported by 26 rock chip samples, identified two areas containing mineralised veins and historic workings (Figure 1). Neither of these prospects are recorded on GSWA maps.

Keep reading...Show less
The Ngwenya mine in Swaziland.

From the Bronze Age to the Green Revolution: Mining's Timeless Role in Shaping Humanity's Future

Mining is one of the oldest industries on Earth. With activity stretching back as many as 40,000 years, human advancement is closely correlated to our relationship with metals and minerals.

Indeed, modern society has been made possible through the extraction of metals and the ages this work has ushered in, from the historic Bronze Age to the more recent Industrial Revolution.

Now, 54 years after the inaugural Earth Day, the world is preparing for the green energy transition. And as this essential shift moves forward, metals are again playing an integral role in achieving the ambitious goals set globally.

Keep reading...Show less

Latest Press Releases

Related News

×