ACME Lithium Starts Exploration Program at Bailey Lake Pegmatite Discovery Area in Saskatchewan Canada

ACME Lithium Starts Exploration Program at Bailey Lake Pegmatite Discovery Area in Saskatchewan Canada

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce that it has commenced a summer exploration program at its Bailey Lake pegmatite discovery area in northeastern Saskatchewan.

Starting August 21st, 2023, ACME will be conducting a 3-in-1 Airborne Geophysical Survey on the Bailey Lake Property which will include Helicopter-borne Tri-axial Gradiometer Magnetics, Radiometrics, and LiDAR (Light Detection and Ranging) to identify regional structural trends and localized controls of pegmatite bodies and other key information to aid in future drill targeting.

Immediately following the geophysical survey, a field program will be conducted to follow up on any anomalous signatures detected from the geophysical survey, as well as to conduct follow-up prospecting from the work completed on the property in 2017. This program will consist of prospecting, geochemical sampling (soils, boulder, outcrop, and channel samples), and structural measurements on the Bailey Lake property. This exploration program will focus on delineating and identifying potential sources for the 2017 boulder sampling completed by Paul Ramaekers and David Turner which returned samples with elevated values of lithium and critical mineral elements. The goal of these programs is to locate and analyze the pegmatites on the property and delineate which ones are hosting spodumene and lepidolite for upcoming drill programs.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7776/178007_84613973e4ce48e5_002.jpg

Image 1: Spodumene bearing boulder train, GEM Oil

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7776/178007_84613973e4ce48e5_002full.jpg

ACME Lithium has acquired the services of Axiom Exploration Group LTD. (Axiom) to complete the upcoming Geophysical Surveys and Field Exploration programs at Bailey Lake Project. Axiom is an employee owned, Saskatchewan based consulting firm providing a diverse set of technical services within, and integrated across multiple divisions: Exploration, Geophysics & Geomatics, Environment & Energy Services. Axiom has a team of diverse geoscientists with multi-jurisdictional experience, managing numerous on-going lithium projects across Canada. Staff are specialized in the field of rare-element pegmatite exploration and Axiom's geoscientists are equipped with the latest industry knowledge and tools to provide reliable and accurate data to aid in the initial design, operation, and management of grass-roots exploration programs to the optimization of advanced projects.

ACME announced on December 12th, 2022, that it had entered into two agreements, an option ("Option") to purchase a 100% interest in a core block of 13 contiguous mineral claims encompassing 25,900 hectares (or 100 square miles) and a purchase ("Purchase") of five additional contiguous claims comprised of 15,794 hectares (61 square miles). Together, the Project Claims comprise 41,694 hectares (or 161 square miles).

Highlights:

  • The large claim block contains multiple indications of spodumene-bearing pegmatites with potentially economic lithium grades.
  • Spodumene-bearing pegmatites with evolved mineralogy are found on surface in outcrop and boulder trains.
  • Historical reported sampling by Gem Oil includes up to 3950 ppm Li in the Bailey Lake region.
  • Historical reported sampling by the Saskatchewan Geological Survey includes results up to 3470 ppm Li at Misaw Lake region to the east of Bailey Lake.
  • Till sampling in the region by the Saskatchewan Geological Survey reported numerous sites with elevated lithium and lithium pegmatite associated elements.
  • The geological setting, granitic suite characteristics, evolved pegmatite characteristics, occurrence of float with potentially economic lithium grades, and absence of extensive historical exploration in the region is strongly encouraging for exploration expansion in this discovery area.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7776/178007_84613973e4ce48e5_003.jpg

Image 2: Spodumene bearing pegmatite in outcrop, GEM Oil

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/7776/178007_84613973e4ce48e5_003full.jpg

Saskatchewan is a highly prospective region for critical mineral development. The Government of Saskatchewan recently announced an expansion to its existing investment and innovation incentive programs to include eligible lithium projects with the aim to become one of the best resource development jurisdictions in the world.

Qualified Person

Mr. Dane A. Bridge, P.Geol., a "Qualified Person" (as defined in NI 43-101 -Standards for Disclosure for Mineral Projects) and a Senior Consultant to the Company, has reviewed and approved the technical disclosures in this news release.

About ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, and at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba.

On behalf of the Board of Directors

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 818-5154
asimone@simonecapital.ca

Neither the CSE nor its Regulations Service Providers accept responsibility for the adequacy or accuracy of this news release.

Forward-Looking Statement

This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/178007

News Provided by Newsfile via QuoteMedia

ACME:CC
The Conversation (0)
ACME Lithium Successfully Completes 10-Day Pumping Test at Clayton Valley Lithium Brine Project

ACME Lithium Successfully Completes 10-Day Pumping Test at Clayton Valley Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has successfully completed a 10-day pumping test at test well TW-1 located in Clayton Valley, Nevada. The data generated during the test will be used to estimate the transmissivity and the storativity of the Lower Gravel Unit (LGU) at the TW-1 location. Preliminary Phase 1 and Phase 2 data suggest the perforated casing of TW-1 captures approximately 500 feet of potential lithium brine aquifer hosted in the LGU. The LGU is the basal gravel overlaying bedrock in Clayton Valley.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7776/177491_a3fcc31ed4de6886_002.jpg

Figure 1: Lithium Brine Samples, Clayton Valley Nevada

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Clarifies Technical Report Disclosure

ACME Lithium Clarifies Technical Report Disclosure

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME"). As a result of a review by the British Columbia Securities Commission, the Company is issuing the following news release to clarify its disclosure. By news release dated June 19, 2023, the Company announced it had filed a technical report titled "NI 43-101 Technical Report Update on the Fish Lake Valley Lithium Claystone Property, Esmeralda County, Nevada USA" (the "Technical Report"). Both the news release and the Technical Report stated that the author of the report, William Feyerabend, was an independent consultant.

Mr. Feyerabend is and was as of the date of the Technical Report, a paid consultant of the Company acting in the role of VP Exploration in the United States. As such, Mr. Feyerabend was not independent of the Company and the report should not have stated as such.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has commenced pumping test activities at test well TW-1 at its Clayton Valley Nevada lithium brine project. The well is the only permitted deep well known to currently exist in the northern portion of Clayton Valley.

Data generated from the pumping test will be used to assess hydraulic properties, brine chemistry of the Lower Gravel Unit (LGU) aquifer and to examine the potential concentration and extractability of economic lithium brine in the LGU.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Announces Results from Phase 1 Winter Drilling Program at Shatford Lake Manitoba

ACME Lithium Announces Results from Phase 1 Winter Drilling Program at Shatford Lake Manitoba

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") announced today drill core sample results from its 2023 winter drill program at its 100% owned Shatford Lake and Birse Lake lithium projects in southeastern Manitoba, Canada. ACME's Shatford-Birse claim area are contiguous to the south of Sinomine's world-class Tanco Mine, a Lithium, Cesium and Tantalum producer (LCTs) since 1969.

Core drilling was based on geological prospecting/mapping with lithium determinations by LIBS and geophysical magnetic interpretation. Drilling and magnetic interpretation was successful in defining broad structural belts with multiple unexposed pegmatites and specific cross structural features in these broad belts that control pegmatite injection. Recent results from this maiden drilling program at Shatford Lake will help the Company vector in the fertile pegmatite zones. Twenty-six pegmatites were intersected in 6 of 8 drill holes.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Advances Lithium Discovery With Additional Lab Results From Test Well TW-1 at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Advances Lithium Discovery With Additional Lab Results From Test Well TW-1 at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") announced today results from the recently completed Dissolved Mineral Resource Exploration (DMRE) test well TW-1 as part of the Phase 2 expanded drill program at ACME's Clayton Valley Nevada lithium brine project.

The results indicate a total lithium concentration of 110 mg/L was present in fluids airlifted from approximately 496 feet of perforated casing crossing the Lower Gravel Unit (LGU). The adjacent operator's property, contiguous to ACME's project area, has a reported cut off grade of 50 mg/l.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  CERENERGY Battery Project Funding Update

Altech Batteries Ltd CERENERGY Battery Project Funding Update

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce an update on funding of the CERENERGY(R) sodium-chloride solid-state battery project in Saxony, Germany.

Highlights

- Financing plan and target structure in place

- Funding investment teaser documents and data room established

- Reach out to 10 commercial banks and 2 venture debt funds - all positive interests

- Shortlisting potential lead bank

- Equity Funding - potential sale of minority interest of the project to realise capital and strategic value

- Discussions and draft term sheets shared with investors

- Offtake agreement LOI signed with ZISP

On 14 June 2024, the Company, through its Germany subsidiary Altech Batteries GmbH ("ABG"), announced the appointment of global big four professional services firm ("funding adviser") to assist in securing finance for the construction of Altech's 120MWh CERENERGY(R) battery manufacturing plant in Germany. The project's financing strategy is structured across three key areas: debt, equity, and grants.

These sources will cover not only the capital expenditures but also financing costs, working capital, debt service coverage, and an additional contingency for potential business interruptions, See Figure 1*.

DEBT PROCESS

A funding invitation document (investment teaser) has been finalised and distributed to various financial institutions for debt funding in the project. The Group has engaged ten commercial banks and two venture debt funds in a first market round, receiving predominantly positive initial feedback. Several of these institutions have expressed strong interest in participating in the financing. The Group is now in the process of shortlisting potential lenders to identify the most suitable financial partners for the project. To support a thorough due diligence process, a secure data room has been set up, providing detailed project information to interested financiers and ensuring full transparency. The DFS financial model has been adjusted to stress-test various funding scenarios tailored to the lending institutions ABG has engaged with. Further steps involve determining the most suitable banks to form a syndicate and appointing a lead bank to guide the lending process. This syndicate will play a crucial role in structuring the financing arrangement to meet the project's requirements.

EQUITY FUNDING

In addition to ongoing debt financing efforts, the Group has engaged several equity advisers to support the equity component of the project's funding package. As part of this strategy, the Altech Group plans to divest a minority interest in the project to one or two strategic investors. This partial divestment aims to attract investors who can bring not only capital, but also strategic value to the project, aligning with the CERENERGY(R) project's long-term growth and sustainability objectives.

The Group is specifically targeting large utility groups, data centre operators, investment funds and corporations that are heavily involved in the green energy transition. These entities are seen as ideal partners due to their strong alignment with the project's focus on sustainable energy solutions, as well as their capacity to provide substantial financial backing.

To date, significant progress has been made in these equity discussions. Several Non-Disclosure Agreements (NDAs) have been signed, allowing for deeper engagement with prospective investors. Altech has also circulated draft term sheets to a number of interested parties, outlining the proposed terms and conditions for investment. These documents serve as a starting point for negotiations, paving the way for more detailed discussions regarding the potential equity stake and partnership structure.

The strategic decision to divest a portion of the project is aimed at reducing the overall financial burden on the Company while bringing in experienced partners who can contribute to the project's success. By securing both the equity and debt components, the Company aims to finalise the full financing package, ensuring the timely construction and commissioning of the CERENERGY(R) battery plant. The next steps will focus on advancing these discussions and converting interest into formal commitments, which are crucial for moving forward with the project.

OFFTAKE ARRANGEMENTS

On 13 September 24, Altech announced the execution of an Offtake Letter of Intent between Zweckverband Industriepark Schwarze Pumpe (ZISP) and Altech Batteries GmbH. Under this Offtake Letter of Intent (LOI), ZISP will purchase 30 MWh of energy storage capacity annually, consisting of 1MWh GridPacks, for the first five years of production. The price of these batteries has been agreed and aligns with the sales price contained within Altech's Definitive Feasibility Study. The purchase of these batteries is subject to performance tests, battery specifications and the batteries meeting customer requirements. This offtake LOI constitutes an important aspect of the financing process. This lays the foundation for additional offtake arrangements, which are currently in progress. These agreements are vital for advancing our financing and construction timelines for the CERENERGY(R) project.

CEO and MD Mr Iggy Tan stated "The funding stage of any project is the most complex and challenging process of any project. Securing a big four funding adviser with expertise and a global network is a major step in our financing efforts. Altech is advancing both debt and equity discussions, along with offtake agreements, to fully fund the CERENERGY(R) project. We are seeing strong interest, especially from European banks and potential equity partners".

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/PO741A78

To view MD Iggy Tan explain the Funding, please visit:
https://www.abnnewswire.net/lnk/23705649



About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. Announces Closing of a Third and Final Tranche of Oversubscribed Private Placement

E-Power Resources Inc. (CSE: EPR) ("E-Power" or the "Company") announces that it has closed a third and final tranche of the private placement previously announced on September 24, 2024 (the "Private Placement"). The oversubscribed private placement was originally announced for $420,000, but a total of $526,264 was raised in all three tranches.

An aggregate of 3,150,000 units (the " Units") of the Company were issued in the third and final tranche at a price of $0.05 per Unit for gross proceeds of $157,500, each Unit being comprised of one common share in the capital of the Company (each a "Common Share") and one-half common share purchase warrant (each a "Warrant"), each Warrant entitling its holder thereof to acquire one additional common share (each a "Warrant Share") at a price of $0.10 per Warrant Share for a period of 60 months from the closing date. (the "Offering").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Mawson Finland Limited Presents Downhole EM  Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited Presents Downhole EM Geophysics: Multiple Deep Conductors Newly Identified at Rajapalot

Mawson Finland Limited ("Mawson" or the "Company") (TSXV:MFL) is pleased to announce results from downhole electro-magnetic "DHEM" geophysical surveys conducted at the Rajapalot gold-cobalt project in Finland

Highlights:

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Canadian Investment Regulatory Organization Trade Resumption - EDDY

Canadian Investment Regulatory Organization Trade Resumption - EDDY

Trading resumes in:

Company: Edison Lithium Corp.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×