ACME Lithium Inc. to Present at 121 Mining Conference in Las Vegas, Nevada March 30th and 31st

ACME Lithium Inc. to Present at 121 Mining Conference in Las Vegas, Nevada March 30th and 31st

ACME Lithium Inc. (CSE: ACME) (OTCQB: ACLHF) (the "Company", or "ACME") is pleased to announce that President and CEO Steve Hanson will be meeting and presenting to investors at the 121 Mining Conference in Las Vegas, Nevada. https:www.weare121.com121mininginvestment-las-vegas

The 121 Mining Investment Las Vegas Summit takes place on March 30th and 31st and attracts US and international investors for two days of investment-led panel sessions and CEO presentations.

With the rapid demand for securing a domestic supply of lithium, Nevada is at the forefront of mining in the US and remains one of the world's most attractive jurisdictions for mining investment.

ACME's CEO Steve Hanson will be presenting an overview of ACME's two Nevada projects including the upcoming drill campaign at Clayton Valley, Nevada, as well as information on ACME's Manitoba and recently announced Oregon project.

About ACME Lithium Inc.

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under the option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, south east Oregon and southeastern Manitoba.

On behalf of the Board of Directors

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from the drilling program to be carried out on the FLV property. Information inferred from the interpretation of drilling and other sampling results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/117800

News Provided by Newsfile via QuoteMedia

ACME:CC
The Conversation (0)
ACME Lithium (CSE:ACME)

ACME Lithium


Keep reading...Show less

North American Lithium Development with Key Projects in Nevada, Manitoba and Saskatchewan

ACME Lithium Starts Exploration Program at Bailey Lake Pegmatite Discovery Area in Saskatchewan Canada

ACME Lithium Starts Exploration Program at Bailey Lake Pegmatite Discovery Area in Saskatchewan Canada

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce that it has commenced a summer exploration program at its Bailey Lake pegmatite discovery area in northeastern Saskatchewan.

Starting August 21st, 2023, ACME will be conducting a 3-in-1 Airborne Geophysical Survey on the Bailey Lake Property which will include Helicopter-borne Tri-axial Gradiometer Magnetics, Radiometrics, and LiDAR (Light Detection and Ranging) to identify regional structural trends and localized controls of pegmatite bodies and other key information to aid in future drill targeting.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Successfully Completes 10-Day Pumping Test at Clayton Valley Lithium Brine Project

ACME Lithium Successfully Completes 10-Day Pumping Test at Clayton Valley Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has successfully completed a 10-day pumping test at test well TW-1 located in Clayton Valley, Nevada. The data generated during the test will be used to estimate the transmissivity and the storativity of the Lower Gravel Unit (LGU) at the TW-1 location. Preliminary Phase 1 and Phase 2 data suggest the perforated casing of TW-1 captures approximately 500 feet of potential lithium brine aquifer hosted in the LGU. The LGU is the basal gravel overlaying bedrock in Clayton Valley.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/7776/177491_a3fcc31ed4de6886_002.jpg

Figure 1: Lithium Brine Samples, Clayton Valley Nevada

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Clarifies Technical Report Disclosure

ACME Lithium Clarifies Technical Report Disclosure

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME"). As a result of a review by the British Columbia Securities Commission, the Company is issuing the following news release to clarify its disclosure. By news release dated June 19, 2023, the Company announced it had filed a technical report titled "NI 43-101 Technical Report Update on the Fish Lake Valley Lithium Claystone Property, Esmeralda County, Nevada USA" (the "Technical Report"). Both the news release and the Technical Report stated that the author of the report, William Feyerabend, was an independent consultant.

Mr. Feyerabend is and was as of the date of the Technical Report, a paid consultant of the Company acting in the role of VP Exploration in the United States. As such, Mr. Feyerabend was not independent of the Company and the report should not have stated as such.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Commences TW-1 Pumping Test at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to report that the Company has commenced pumping test activities at test well TW-1 at its Clayton Valley Nevada lithium brine project. The well is the only permitted deep well known to currently exist in the northern portion of Clayton Valley.

Data generated from the pumping test will be used to assess hydraulic properties, brine chemistry of the Lower Gravel Unit (LGU) aquifer and to examine the potential concentration and extractability of economic lithium brine in the LGU.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
ACME Lithium Announces Results from Phase 1 Winter Drilling Program at Shatford Lake Manitoba

ACME Lithium Announces Results from Phase 1 Winter Drilling Program at Shatford Lake Manitoba

ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") announced today drill core sample results from its 2023 winter drill program at its 100% owned Shatford Lake and Birse Lake lithium projects in southeastern Manitoba, Canada. ACME's Shatford-Birse claim area are contiguous to the south of Sinomine's world-class Tanco Mine, a Lithium, Cesium and Tantalum producer (LCTs) since 1969.

Core drilling was based on geological prospecting/mapping with lithium determinations by LIBS and geophysical magnetic interpretation. Drilling and magnetic interpretation was successful in defining broad structural belts with multiple unexposed pegmatites and specific cross structural features in these broad belts that control pegmatite injection. Recent results from this maiden drilling program at Shatford Lake will help the Company vector in the fertile pegmatite zones. Twenty-six pegmatites were intersected in 6 of 8 drill holes.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Cerenergy Battery Project Funding Progressing Well

Altech Batteries Ltd Cerenergy Battery Project Funding Progressing Well

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to announce an update on funding of the CERENERGY(R) sodium-chloride solid-state battery project in Saxony, Germany.

DEBT PROCESS

As previously mentioned, Altech has engaged ten commercial banks and two venture debt funds in the first round of financing discussions, receiving largely positive initial feedback. Based on this feedback, the Company has selected a preferred financial institution- a European bank with a proven track record in providing debt funding for technology-driven projects, particularly those within the innovation sector.

Although the mandate has not yet been formally executed, Altech intends to make an official announcement once this step is complete.

Meanwhile, the bank's commercial and technical teams have been diligently conducting a comprehensive review of the Cerenergy projects and its technology. The technical due diligence process is critical for ensuring that the project meets the bank's financing and risk criteria. As part of this process the onsite Altech experts are in detailed discussions with the bank's representative. The banks have visited Dresden and the Fraunhofer testing facilities and visit Hermsdorf, Germany where the prototype production is located in the coming weeks, which will be a key step in concluding the technical evaluation.

In parallel with these efforts, Altech is progressing discussions for securing a federal government guarantee, which would further strengthen its ability to secure the necessary debt funding for the project. Officials from the Ministry of Finance have already been briefed on the initiative, and the due diligence process for the application is actively underway. This federal guarantee will serve as an underwriter and therewith derisk any debt funding for the project substantially.

EQUITY FUNDING

In parallel with ongoing debt financing efforts, the Group has engaged several equity advisers to assist in securing the equity component of the project's funding package. As part of this strategy, Altech plans to divest a minority interest in the project to one or two strategic investors. This partial divestment is intended to attract investors who can contribute not only capital, but also strategic value, aligning with the CERENERGY(R) project's long-term goals of growth and sustainability.

The Group on one hand is specifically targeting large utility companies, data centre operators, investment funds, and corporations that are deeply committed to the green energy transition and on the other hand industrial partners with access and know-how and resources relevant to Cerenergy battery production, implementation or market access. These potential partners are seen as ideal due to their strong alignment with the project's sustainable energy focus and their ability to provide significant financial support. Progress in equity discussions has been promising, with several Non-Disclosure Agreements (NDAs) signed, enabling deeper engagement with prospective investors. Additionally, draft term sheets have been circulated to interested parties, outlining the key terms and conditions for investment. These documents provide a foundation for negotiations and facilitate more detailed discussions around the equity stake and partnership structure.

The decision to divest part of the project is strategically aimed at easing the Company's financial burden while bringing in experienced partners who can contribute to the project's success. By securing both equity and debt financing, Altech aims to finalize the full funding package, ensuring the timely construction and commissioning of the CERENERGY(R) battery plant. Moving forward, the focus will be on advancing these discussions and converting interest into formal commitments, which are critical for the project's progression.

GRANT APPLICATIONS

Altech has been actively applying for various grants offered by the State of Saxony, Federal Government of Germany, and the European Union. The State of Saxony and Brandenburg, along with the European Union, offer substantial support for renewable energy projects, including grants aimed at converting lignite coal to renewable energy sources. These grants are part of broader efforts to transition regions dependent on fossil fuels toward sustainable energy solutions. Altech's site, located in these areas, stands to benefit from various funding programs designed to support clean energy projects, including EU grants for energy transformation and innovation. Altech has applied for several of these grants to advance its CERENERGY(R) project, securing essential financial backing for technology development, high-tech industries, expert employment and infrastructure upgrades.

OFFTAKE ARRANGEMENTS

Altech has secured three key Offtake Letters of Intent (LOIs) for 100% of its CERENERGY(R) production.

1. Zweckverband Industriepark Schwarze Pumpe (ZISP): An agreement was signed on 13 September 2024 for ZISP to purchase 30 MWh of energy storage capacity annually, consisting of 1MWh GridPacks, for the first five years of production. The purchase is contingent on performance tests and battery specifications meeting customer requirements.

2. Referenzkraftwerk Lausitz GmbH (RefLau): A second LOI was executed with RefLau, a joint venture between Enertrag SE and Energiequelle GmbH. RefLau will buy 30 MWh of CERENERGY(R) storage n the first year, increasing to 32 MWh annually for the next four years. Additionally, Altech will purchase green electricity for its planned production plant.

3. Axsol GmbH: A third LOI was signed with Axsol, a leading renewable energy solutions provider. Axsol will exclusively distribute CERENERGY(R) batteries to the Western defense industry, facilitating early market entry and sales. These agreements are crucial for financing and advancing the CERENERGY(R) project.

 

About Altech Batteries Ltd:  

Altech Batteries Limited (ASX:ATC,OTC:ALTHF) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

 

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×