TSXV:RCK

Rock Tech Clarifies Technical Disclosures

(TheNewswire)



Vancouver, BC, Canada - TheNewswire December 18, 2020 Rock Tech Lithium Inc. (the "Company" or "Rock Tech") (TSXV:RCK ) ( Frankfurt:RJIB) announces that, as a result of a review by the British Columbia Securities Commission, the Company is issuing the following news release to clarify its disclosure.

The economic analyses disclosed in a news release dated November 4, 2020, are not supported by a compliant NI 43-101 technical report and should not be relied upon until they have been verified and supported by a technical report.

The Company continues to work on an NI 43-101 compliant technical report and will issue a news release when a revised technical report is filed on SEDAR.

On behalf of the Board of Directors,

"Simon Bodensteiner"
Simon Bodensteiner
Director, Chief Executive Officer

For further information, please contact:

Brad Barnett
Chief Financial Officer
Rock Tech Lithium Inc.
777 Hornby Street, Suite 600
Vancouver, B.C., V6Z 1S4
Telephone: (778) 358-5200
Facsimile: (604) 670-0033
Email: bbarnett@rocktechlithium.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, "forward ‐ looking statements".  Forward ‐ looking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions.  The Company cautions readers that forward ‐ looking statements, including without limitation those relating to the Company's future operations and business prospects, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward ‐ looking statements.

Copyright (c) 2020 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

The Conversation (0)
Rock Tech Lithium

Rock Tech Lithium

Vertically Integrated Lithium Production and Processing

Vertically Integrated Lithium Production and Processing Keep Reading...
Sphalerite Intervals at Prophet River Ga-Ge Project - Canada

Sphalerite Intervals at Prophet River Ga-Ge Project - Canada

Rapid Critical Metals (RCM:AU) has announced Sphalerite Intervals at Prophet River Ga-Ge Project - CanadaDownload the PDF here. Keep Reading...
Spartan Metals Expands Victorio Tungsten-Molybdenum Resource with Measured and Indicated Grades of 0.25% MoEq or 0.15% WO3Eq

Spartan Metals Expands Victorio Tungsten-Molybdenum Resource with Measured and Indicated Grades of 0.25% MoEq or 0.15% WO3Eq

84.54 million short tons Measured and Indicated at 0.10% WO₃ and 0.09% Mo(0.15% WO₃Eq or 0.25% MoEq) 101.84 million short tons Inferred at 0.09% WO₃ and 0.06% Mo(0.13% WO₃Eq or 0.22% MoEq) Spartan Metals Corp. (TSXV: W) (OTCQB: SPRMF) (FSE: J03) ("Spartan" or the "Company"), an exploration and... Keep Reading...
SAGA Metals Completes Diamond Drill Program at the Wolverine Rare Earth Project - All 22 Holes Totalling 3,241 Metres Intersect Prospective REE-Bearing Alteration

SAGA Metals Completes Diamond Drill Program at the Wolverine Rare Earth Project - All 22 Holes Totalling 3,241 Metres Intersect Prospective REE-Bearing Alteration

Saga Metals Corp. (TSXV: SAGA) (OTCQX SAGMF) (FSE: 20H) ("SAGA" or the "Company"), a North American exploration company focused on critical mineral discoveries, is pleased to announce the successful completion of its maiden diamond drill program at the 100%-owned Wolverine Heavy Rare Earth... Keep Reading...
High-Grade Expansion Continues at Webbs-Exceptional Results

High-Grade Expansion Continues at Webbs-Exceptional Results

Rapid Critical Metals (RCM:AU) has announced High-Grade Expansion Continues at Webbs-Exceptional ResultsDownload the PDF here. Keep Reading...
SAGA Metals Reports Final Titanium, Vanadium and Iron Assays from MRE Drilling--Maiden Mineral Resource Estimate Imminent

SAGA Metals Reports Final Titanium, Vanadium and Iron Assays from MRE Drilling--Maiden Mineral Resource Estimate Imminent

MRE PROGRAM HIGHLIGHTS:22,432 METRES. 85 HOLES. DRILLING COMPLETE. SAGA's MRE drilling campaign completed in less then ten months across Trapper North, Transition and South zones.100% MINERALIZATION HIT RATE WITH BROAD OXIDE INTERCEPTS. Every MRE hole intersected oxide mineralization, with... Keep Reading...
SAGA Metals Reports Final Titanium, Vanadium and Iron Assays from MRE Drilling-Maiden Mineral Resource Estimate Imminent

SAGA Metals Reports Final Titanium, Vanadium and Iron Assays from MRE Drilling-Maiden Mineral Resource Estimate Imminent

MRE PROGRAM HIGHLIGHTS: 22,432 METRES. 85 HOLES. DRILLING COMPLETE. SAGA's MRE drilling campaign completed in less then ten months across Trapper North, Transition and South zones. 100% MINERALIZATION HIT RATE WITH BROAD OXIDE INTERCEPTS. Every MRE hole intersected oxide mineralization, with... Keep Reading...

Interactive Chart

Latest Press Releases

Related News