0.22 um

ValOre Drills 127 m of 0.85 g/t 2PGE+Au from 39 m and 53 m of 1.19 g/t 2PGE+Au from 2.0 m, Santo Amaro Target, Pedra Branca

ValOre Metals Corp. ("ValOre"; TSX ‐ V: VO; OTC: KVLQF; Frankfurt: KEQ0, "the Company") today reported diamond drilling assay results from the Santo Amaro target at ValOre's 100%-owned Pedra Branca Platinum Group Elements ("PGE", "2PGE+Au") Project ("Pedra Branca") in northeastern Brazil.

"2021 drilling at Santo Amaro was a great success, with significant shallow PGE intercepts returned in 16 of 20 holes," stated ValOre's VP of Exploration, Colin Smith. "The 127-metre PGE intercept in drill hole DD21SA27, situated 95 metres outside of the resource to the east-southeast, demonstrates the impressive upside potential of this underexplored target area."

Key Updates on 2021 Santo Amaro Core Drilling:

  • 20 holes drilled totaling 2,316 metres ("m"), with a primary focus of resource expansion;
  • All 20 completed holes intercepted the target ultramafic ("UM") intrusion, with assays received in full, and notable PGE intercepts returned in 16 of 20 core holes;
  • Newly received near surface PGE interval highlights include:
    • 127 m at 0.85 grams per tonne palladium + platinum + gold ("g/t 2PGE+Au") from 39 m, incl. 27 m at 2.25 g/t 2PGE+Au from 55 m in drill hole DD21SA42
    • 53 m at 1.19 g/t 2PGE+Au from 2.0 m, incl. 20 m at 2.13 g/t 2PGE+Au from 29 m in drill hole DD21SA34
    • 22 m at 2.64 g/t 2PGE+Au from 18 m, incl. 6.0 m at 5.32 g/t 2PGE+Au from 29 m in drill hole DD21SA37
    • 20 m at 1.67 g/t 2PGE+Au from 40 m in drill hole DD21SA33;
  • Drill-confirmed PGE mineralization along the trend has increased in strike length from 215 m to over 600 m;
  • Continuity of geology and PGE grade has been established between Northwest Target ("NW") and resource area, with 8 positive NW drill holes spaced ~60-90 m apart;
  • Broad trends of near-surface PGE mineralization remain largely open.

*Reported core assay interval lengths are estimated to represent 80-100% true width

Santo Amaro Target and the 2019 Mineral Resource Domain

Santo Amaro is one of five currently defined PGE deposit areas at Pedra Branca, which together host an inferred resource totalling 1,067,000 ounces ("oz") of 2PGE+Au contained in 27.2 million tonnes ("Mt") grading 1.22 g/t 2PGE+Au. Summary Table of the 2019 Inferred Resource and Pedra Branca Resource Estimate NI 43-101 Technical Report, May 2019 .

The 2019 Santo Amaro mineral resource was defined by 5 pre-ValOre drill holes spaced 45-60 m apart, along a collective geological trend of 215 m, which together comprise an inferred resource of 203,000 oz at 1.19 g/t 2PGE+Au in 5.3 Mt. To improve geological constraint for the next resource re-estimation, 10 scissor holes were drilled in 2021 from 5 pads (2 holes per pad) to the north of the resource holes, with each pad having 1 vertical hole (-90° dip) and 1 angled hole to the south (-50° dip).

Shallow, well-mineralized intercepts have been returned for all 10 holes, establishing strong geology and PGE grade continuity of the resource area. Highlight PGE intercepts include: 36 m at 2.22 g/t 2PGE+Au from 43 m, incl. 9.1 m at 6.38 g/t 2PGE+Au from 43 m in drill hole DD21SA30, and 53 m at 1.19 g/t 2PGE+Au from 2.0 m, incl. 20 m at 2.13 g/t 2PGE+Au from 29 m in drill hole DD21SA34. See Table 1 below for a summary of significant drill core assays, and Figure 1 below for a plan map of Santo Amaro drilling.

Resource Expansion Potential Along Strike

The easterly resource strike extension exhibits a thickening of the mineralized package and was subsequently targeted with 3 holes in 2021. All three holes intercepted broad intervals of target UMs along trend from the existing resource, including highlight drill hole DD21SA42, which returned 127 m at 0.85 g/t 2PGE+Au from 39 m, including 27 m at 2.25 g/t 2PGE+Au from 55 m. See Table 1 below for a summary of significant drill core assays, and Figure 2 below for a cross section of DD21SA42.

The resource strike potential also remains open to the west and northwest, as evidenced by western-most 2020 drill hole DD20SA23, which returned 20 m at 0.98 g/t 2PGE+Au from surface ( CLICK HERE for news release dated January 15, 2021), and 2021 drill hole DD21SA37, situated 220 m to the northwest (NW Target), which returned 22 m at 2.64 g/t 2PGE+Au from 18 m.

Northwest Target Area

The NW Target represents an emerging shallow PGE body approximately 250 m north-northwest of the resource area, targeted with 6 holes totaling 729 m in 2021, with the goal of incorporating the zone into a future inferred resource estimate. All 6 holes intercepted the target shallow UM intrusion, with 4 holes returning significant near-surface PGE intercepts, building strong geological continuity between the 200 m by 300 m zone, and the resource area (250 m to the south-southeast). Highlight drill hole DD21SA37 returned 22 m at 2.64 g/t 2PGE+Au from 18 m, incl. 6.0 m at 5.32 g/t 2PGE+Au from 29 m. See Table 1 below for a summary of significant drill core assays.

Table 1: Significant Core 2PGE+Au Assays from 2021 Santo Amaro Drilling

Target Hole ID From
(m)
To
(m)
Length
(m)
Au
(g/t)
Pd
(g/t)
Pt
(g/t)
2PGE+Au
(g/t)
Summary Interval** Gram x metre
Scissor Target DD21SA25* 41.90 99.76 57.86 0.01 0.29 0.30 0.60 59 m at 0.60 g/t 2PGE+Au from 42 m 35
Scissor Target

DD21SA26*

34.02 62.60 28.58 0.04 0.54 0.26 0.83 29 m at 0.83 g/t 2PGE+Au from 34 m
incl. 12 m at 1.12 g/t 2PGE+Au from 43 m

24

43.00 55.00 12.00 0.02 0.73 0.37 1.12
NW Target



DD21SA27*



8.50 13.00 4.50 0.01 0.12 0.12 0.26 4.5 m at 0.26 g/t 2PGE+Au from 8.5 m
and 31 m at 0.26 g/t 2PGE+Au from 88 m
incl. 4.0 m at 0.99 g/t 2PGE+Au from 88 m



9



88.00 119.00 31.00 0.01 0.17 0.08 0.26
88.00 92.00 4.00 0.02 0.73 0.25 0.99
Scissor Target

DD21SA28*

19.95 27.60 7.65 0.05 1.30 1.60 2.96 7.7 m at 2.96 g/t 2PGE+Au from 20 m
incl. 3.0 m at 5.24 g/t 2PGE+Au from 22 m

23

22.00 25.00 3.00 0.08 2.55 2.60 5.24
Scissor Target DD21SA29* 22.55 51.42 28.87 0.14 0.89 0.38 1.41 29 m at 1.41 g/t 2PGE+Au from 23 m 41
Scissor Target

DD21SA30*

42.55 78.15 35.60 0.02 1.16 1.05 2.22 36 m at 2.22 g/t 2PGE+Au from 43 m
incl. 9.1 m at 6.38 g/t 2PGE+Au from 43 m

79

42.55 51.67 9.12 0.03 3.28 3.07 6.38
Scissor Target

DD21SA31

49.22 95.00 45.78 0.01 0.42 0.38 0.81 46 m at 0.81 g/t 2PGE+Au from 49 m
incl. 16 m at 1.22 g/t 2PGE+Au from 52 m

37

52.00 68.00 16.00 0.02 0.61 0.65 1.27
Scissor Target

DD21SA32

18.14 41.00 22.86 0.03 0.84 0.20 1.07 23 m at 1.07 g/t 2PGE+Au from 18 m
incl. 8.0 m at 2.13 g/t 2PGE+Au from 22 m

24

22.00 30.00 8.00 0.06 1.71 0.36 2.13
Scissor Target

DD21SA33

1.35 4.00 2.65 0.01 0.19 0.19 0.40 2.7 m at 0.40 g/t 2PGE+Au from 1.4 m
and 20 m at 1.67 g/t 2PGE+Au from 40 m

34

40.00 59.70 19.70 0.02 1.02 0.63 1.67
Scissor Target

DD21SA34

2.00 55.00 53.00 0.02 0.55 0.63 1.19 53 m at 1.19 g/t 2PGE+Au from 2 m
incl. 19.9 m at 2.13 g/t 2PGE+Au from 29 m

63

29.00 48.90 19.90 0.01 0.76 1.35 2.13
Scissor Target DD21SA35 46.45 49.00 2.55 0.01 0.27 0.32 0.60 2.6 m at 0.60 g/t 2PGE+Au from 47 m 2
NW Target

DD21SA36

0.00 8.00 8.00 0.01 0.17 0.05 0.23 8.0 m at 0.23 g/t 2PGE+Au from surface
and 15 m at 0.22 g/t 2PGE+Au from 119 m

5

118.50 133.75 15.25 0.01 0.10 0.10 0.22
NW Target

DD21SA37

17.90 39.50 21.60 0.01 0.88 1.75 2.64 22 m at 2.64 g/t 2PGE+Au from 18 m
incl. 5.95 m at 5.32 g/t 2PGE+Au from 29 m

57

29.00 34.95 5.95 0.01 1.84 3.47 5.32
NW Target

DD21SA40

35.08 58.85 23.77 0.01 0.36 0.23 0.59 24 m at 0.59 g/t 2PGE+Au from 35 m
incl. 4.5 m at 1.33 g/t 2PGE+Au from 54 m

14

54.35 58.85 4.50 0.01 0.85 0.47 1.33
East Strike Extension

DD21SA41

0.00 28.00 28.00 0.01 0.27 0.23 0.51 28 m at 0.51 g/t 2PGE+Au from surface
incl. 5.2 m at 1.30 g/t 2PGE+Au from 3.9 m

14

3.90 9.05 5.15 0.01 0.53 0.76 1.30
East Strike Extension

DD21SA42

39.00 165.85 126.85 0.02 0.42 0.41 0.85 127 m at 0.85 g/t 2PGE+Au from 39 m
incl. 27 m at 2.25 g/t 2PGE+Au from 55 m

108

55.00 82.05 27.05 0.04 1.04 1.17 2.25

*Released October 20, 2021
**Reported core assay interval lengths are estimated to represent 80-100% true width

Figure 1: Plan Map of Santo Amaro Drilling is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/e2174993-5186-4a44-819e-0f88a142ac67

Figure 2: Cross Section of Drill Hole DD21SA42 is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/598a27f5-2333-4402-bcea-cb1a9e8a3d84

Quality Control/Quality Assurance ("QA/QC") and Grade Interval Reporting

CLICK HERE for a summary of ValOre's policies and procedures related to QA/QC and grade interval reporting.

Qualified Person ("QP")

The technical information in this news release has been prepared in accordance with Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Colin Smith, P.Geo., ValOre's QP and Vice President of Exploration.

About ValOre Metals Corp.

ValOre Metals Corp. (TSX V: VO) is a Canadian company with a portfolio of high‐quality exploration projects. ValOre's team aims to deploy capital and knowledge on projects which benefit from substantial prior investment by previous owners, existence of high-value mineralization on a large scale, and the possibility of adding tangible value through exploration, process improvement, and innovation.

In May 2019, ValOre announced the acquisition of the Pedra Branca Platinum Group Elements (PGE) property, in Brazil, to bolster its existing Angilak uranium, Genesis/Hatchet uranium and Baffin gold projects in Canada.

The Pedra Branca PGE Project comprises 51 exploration licenses covering a total area of 55,984 hectares (138,339 acres) in northeastern Brazil. At Pedra Branca, 5 distinct PGE+Au deposit areas host, in aggregate, a current Inferred Resource of 1,067,000 ounces 2PGE+Au contained in 27.2 million tonnes grading 1.22 g/t 2PGE+Au ( CLICK HERE for ValOre's July 23, 2019 news release). All the currently known Pedra Branca inferred PGE resources are potentially open pittable.

Comprehensive exploration programs have demonstrated the "District Scale" potential of ValOre's Angilak Property in Nunavut Territory, Canada that hosts the Lac 50 Trend having a current Inferred Resource of 2,831,000 tonnes grading 0.69% U 3 O 8 , totaling 43.3 million pounds U 3 O 8 . For disclosure related to the inferred resource for the Lac 50 Trend uranium deposits, please CLICK HERE for ValOre's news release dated March 1, 2013.

ValOre's team has forged strong relationships with sophisticated resource sector investors and partner Nunavut Tunngavik Inc. (NTI) on both the Angilak and Baffin Gold Properties. ValOre was the first company to sign a comprehensive agreement to explore for uranium on Inuit Owned Lands in Nunavut Territory and is committed to building shareholder value while adhering to high levels of environmental and safety standards and proactive local community engagement.

On behalf of the Board of Directors,

"Jim Paterson"

James R. Paterson, Chairman and CEO

ValOre Metals Corp.

For further information about ValOre Metals Corp., or this news release, please visit our website at www.valoremetals.com or contact Investor Relations at 604.653.9464, or by email at contact@valoremetals.com .

ValOre Metals Corp. is a proud member of Discovery Group. For more information please visit: https://www.discoverygroup.ca/

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release contains "forward-looking statements" within the meaning of applicable securities laws. Although ValOre believes that the expectations reflected in its forward-looking statements are reasonable, such statements have been based on factors and assumptions concerning future events that may prove to be inaccurate. These factors and assumptions are based upon currently available information to ValOre. Such statements are subject to known and unknown risks, uncertainties and other factors that could influence actual results or events and cause actual results or events to differ materially from those stated, anticipated or implied in the forward-looking statements. A number of important factors including those set forth in other public filings could cause actual outcomes and results to differ materially from those expressed in these forward-looking statements. Factors that could cause the actual results to differ materially from those in forward-looking statements include the future operations of ValOre and economic factors. Readers are cautioned to not place undue reliance on forward-looking statements. The statements in this press release are made as of the date of this release and, except as required by applicable law, ValOre does not undertake any obligation to publicly update or to revise any of the included forward-looking statements, whether as a result of new information, future events or otherwise. ValOre undertakes no obligation to comment on analyses, expectations or statements made by third parties in respect of ValOre, or its financial or operating results or (as applicable), their securities.


News Provided by GlobeNewswire via QuoteMedia

The Conversation (0)

Imperial to hold 2024 First Quarter Earnings Call

(TSE: IMO, NYSE American: IMO) Brad Corson, chairman, president and chief executive officer, and Peter Shaw, vice-president, investor relations, Imperial Oil Limited, will host a 2024 First Quarter Earnings Call on Friday, April 26, following the company's first quarter earnings release that morning. The event begins at 9 a.m. MT and will be accessible by webcast.

During the call, Mr. Corson will offer brief remarks prior to taking questions from Imperial's covering analysts.

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

PrairieSky Royalty Announces Conference Call for Q1 2024 Results

PrairieSky will release its Q1 2024 results on Monday, April 22, 2024 after markets close. The news release detailing PrairieSky's Q1 2024 results will provide operating and financial information. Financial statements along with management's discussion and analysis will be available on PrairieSky's website at www.prairiesky.com and on SEDAR+ at www.sedarplus.com .

A conference call to discuss the results will be held for the investment community on Tuesday, April 23, 2023 beginning at 6:30 am MT (8:30 am ET). To participate in the conference call, you are asked to register at the link provided below. Details regarding the call will be provided to you upon registration.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Discovers New Lightning Zone Grading 0.29% U3O8 over 0.9 Metres as It Completes 2024 Winter Drill Program at Hook Lake Joint Venture

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") announced today the completion of its winter drill program at the Hook Lake Joint Venture at the Carter Corridor. The Hook Lake Project is a joint venture between Cameco Corporation (39.5%), Orano Canada Inc. (39.5%), and Purepoint (21%) and lies on trend with high-grade uranium discoveries including Fission Uranium's Triple R Deposit and NexGen's Arrow Deposit.

"This year's drill program ended with a discovery of 0.9 metres of 0.29% U3O8, including 0.3 metres of 0.68% U3O8, associated with a major structure intersected by hole CRT24-10," said Scott Frostad, Vice President Exploration at Purepoint. "Encouragingly, the basement hosted uranium mineralization is within an altered breccia matrix that borders a 10 metre wide graphitic shear. All the 2024 holes intersected anomalous radioactivity and the results continue to show the extensive 20-kilometre conductive structural zone known as the Carter Corridor remains highly prospective for an economic uranium discovery."

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour and JV Partner Orano Commence 2024 Exploration Programs at the Preston Uranium Project 

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHB F ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has commenced a comprehensive 2024 field campaign at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program will include a ground electromagnetic survey (ML-TEM), a ground gravity survey, and a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

Blue Sky Uranium Files Technical Report for Updated Preliminary Economic Assessment at Amarillo Grande Uranium-Vanadium Project, Argentina

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTC: BKUCF) "Blue Sky" or the "Company") is pleased to announce that the Company has filed the NI 43-101 Technical Report (the "Report") supporting disclosure of the independent Preliminary Economic Assessment(" PEA") for the Ivana Deposit at the Company's 100% owned Amarillo Grande Uranium-Vanadium Project in Rio Negro Province Argentina as reported on February 22 nd 2024 .

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Skyharbour Partner Company Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

Skyharbour Partner Company Tisdale Clean Energy Completes First Two Drill Holes at the South Falcon East Uranium Project, Athabasca Basin, Saskatchewan

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ( " Skyharbour " or the " Company ") is pleased to announce that partner company Tisdale Clean Energy Corp. ("Tisdale") has provided an update on its diamond drilling program at the South Falcon East Uranium Project, which hosts the Fraser Lakes B uranium deposit. Under the Option Agreement and assuming the 75% interest is earned, Tisdale will have issued Skyharbour 1,111,111 Tisdale shares upfront, and will fund exploration expenditures totaling CAD $10,500,000, as well as pay Skyharbour CAD $11,100,000 in cash of which $6,500,000 can be settled for shares in the capital of Tisdale ("Shares") over the five-year earn-in period.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
{{ sections }}

Latest Press Releases

Related News

×