Critical Resources

Drilling Identifies New Mineralised Zone South of Mavis Lake

Lithium development company, Critical Resources Limited (ASX:CRR) (“Critical Resources” or “the Company”) is pleased announce further exceptional spodumene-bearing pegmatite intercepts from recent drilling at Mavis Lake1. Additionally, the results identify a new mineralised zone located~300m south of the Main Zone at Company’s 100% owned Mavis Lake Lithium Project in Ontario, Canada.

Highlights

  • Step-out drilling, of newly permitted drill pads, has intersected significant spodumene- bearing pegmatites, approximately 300m south of the Main Zone
  • Logging of core from the South Zone identifies very-high concentrations of spodumene up to 45% over lengths greater than 6m.
  • Highlights include:
    • Drill hole SZ23-002: 6.8m of spodumene-bearing pegmatite from 72.4m down hole;
    • Drill hole SZ23-004: 9.45m of spodumene-bearing pegmatite from 111.85m down hole; and
    • Drill hole SZ23-010: 6.45m of spodumene-bearing pegmatite from 208.05m down hole
  • Main Zone drilling continues to intersect thick intervals of spodumene-bearing pegmatite, proving down dip continuation of the Main Zone
  • Highlights include:
    • Drill hole MF23-190: 14.7m of spodumene-bearing pegmatite from 167.6m down hole, and 20.05m of spodumene-bearing pegmatite from 251.5m down hole;
    • Drill hole MF23-189: 17.65m of spodumene-bearing pegmatite from 167.6m down hole; and
    • Drill hole MF22-188: 16.15m of spodumene-bearing pegmatite from 165.1m down hole
  • Drilling continues to expand the known area of lithium mineralisation at Mavis Lake, with all results supporting the development of the Company’s JORC 2012 compliant, Maiden Mineral Resource Estimate
Drilling Program Delivers Continued Success

The Company recommenced drilling in early January 2023 with two drill rigs focusing on different areas at Mavis Lake. The recent results extend the known mineralisation of the Main Zone down dip, and confirms that mineralisation remains open at depth. The results also confirms a new mineralisation area to the south of the Main Zone. The successful drilling of the South Zone highlights the continued potential for scale and growth at Mavs Lake with multiple, mapped, spodumene- bearing outcrops yet to be drill tested.

All drill results will be incorporated in a Maiden Mineral Resources Estimate which is currently being developed. Tables 1 and 2 provide a summary of key intercepts, with full exploration results in Appendix 1.

Table 1 – Key spodumene-bearing pegmatite intersections and estimates of spodumene percentage confirmed through visual estimate (South Zone)1

Figure 1 – SZ23-004 core with fine to large white spodumene laths from 111.85m to 121.3m

Future Work

The Company continues drilling at Mavis Lake and has also commenced baseline technical and environmental studies and assessments to support the preparation of a Scoping Study for the Mavis Lake Project.

The Company is awaiting assays from samples collected from over 50 individual drill holes (including samples generated from drilling in late 2022).

Critical Resources’ Managing Director Alex Cheeseman said:

“These are further great results from Mavis Lake, identifying a new mineralisation zone has the ability to significantly increase the scale potential of the project, and is extremely encouraging.

These results reinforce the Company's commitment to conduct comprehensive, large scale drilling programs throughout 2022 and continuing in 2023.

We look forward to further develop our understanding of the mineralisation at Mavis Lake and adding these results to our pending Mineral Resource Estimate.”


Click here for the full ASX Release

This article includes content from Critical Resources Limited, licensed for the purpose of publishing on Investing News Australia. This article does not constitute financial product advice. It is your responsibility to perform proper due diligence before acting upon any information provided here. Please refer to our full disclaimer here.

CRR:AU
The Conversation (0)
Critical Resources

Critical Resources

High-grade Lithium Portfolio, in a Tier 1 Location, Aligned with the World’s Green Energy Transition

High-grade Lithium Portfolio, in a Tier 1 Location, Aligned with the World’s Green Energy Transition Keep Reading...
Person using tablet with financial charts and numbers on screen.

Two Dollars of Drilling for Every One Raised: The Junior Mining Structure Most Investors Miss

When investors focus on geology, they are literally and figuratively on the rocks. By solely looking at the physicality of a project, they overlook the very framework that determines how those rocks translate into value.Mining studies posit that “a lack of effective strategies to develop capital... Keep Reading...
Periodic table with lithium highlighted in white against a dark blue background.

California Lithium Developer CTR to Go Public in US$4.7 Billion SPAC Deal

Lithium developer Controlled Thermal Resources (CTR) plans to go public through a US$4.7 billion merger with special purpose acquisition company (SPAC) Plum Acquisition in a deal aimed at accelerating development of a major geothermal and lithium project in California.The companies said the... Keep Reading...

Snow Lake Announces Name Change to Frontier Nuclear and Minerals Inc. and Trading Symbol Change to "FNUC"

Name Change and New Trading Symbol to be effective on March 16, 2026Snow Lake Resources Ltd., dba Snow Lake Energy (NASDAQ: LITM) ("Snow Lake" or the "Company"), a nuclear fuel cycle company, announces that it will change its name to "Frontier Nuclear and Minerals Inc.", and will change its... Keep Reading...
Closeup of LFP battery on a dark background.

LFP Batteries Claim 60 Percent of Global Market as North America Scrambles to Build Supply Chain

The rise of lithium-iron-phosphate (LFP) batteries was a popular theme at the Benchmark Week Summit in Toronto, where industry executives said the chemistry’s combination of safety, versatility and lower costs is driving explosive growth across electric vehicles and grid storage.According to... Keep Reading...
  Charger Metals

Lake Johnston drill program testing extensions to Xmas Gold Discovery and Medcalf Lithium Resource

Charger Metals NL (ASX: CHR, “Charger” or the “Company”) is pleased to provide a drilling progress update at its 100%-owned Lake Johnston Lithium and Gold Project (“Lake Johnston”) in the Yilgarn, Western Australia. Charger has completed a total of 3,054m drilling this quarter to date, including... Keep Reading...
Cleantech Lithium

Laguna Verde CEOL Terms Agreed with Chilean Government

CleanTech Lithium (AIM: CTL, Frankfurt:T2N), an exploration and development company advancing sustainable lithium projects in Chile, is delighted to announce that the Company and the Mining Ministry in Chile have formally agreed the contractual terms on which the Special Lithium Operating... Keep Reading...

Interactive Chart

Latest Press Releases

Related News