CanAlaska Confirms Uranium Mineralization of 0.27% U3O8 on Geikie Project

CanAlaska Confirms Uranium Mineralization of 0.27% U3O8 on Geikie Project

Assay Results Confirm Uranium Enrichment in Multiple Drillholes

Falcon Airborne Gravity Survey Completed; Final Results Pending

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) ("CanAlaska or the "Company") is pleased to announce that it has received assay results from the 2023 exploration program on the Geikie project (the "Project") located near the Athabasca Basin margin (Figure 1). Assay results confirm uranium mineralization and enrichment associated with hydrothermal alteration and structure. The program is highlighted by 0.5 metres @ 0.27% U3O8 from 185.0 metres in drillhole GKI002. The program focused on a 15-kilometre-long northeast trending conductor system with high-priority structural targets. The Geikie project is approximately 10 kilometres east of the Athabasca Basin margin and 10 kilometres west of Highway 905. The 2023 drill program consisted of 2,217 metres in eight drill holes, representing CanAlaska's first drill holes on its 40%-owned Geikie project.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2864/181983_9da46cd7e443ba25_002.jpg

Figure 1 – Geikie Project Location

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2864/181983_9da46cd7e443ba25_002full.jpg

2023 Drill Program Geochemical Assay Results

Assay results from the 2023 drill program on the Geikie project confirm uranium mineralization in the Aero Lake target area, which is located at the southern end of the 15-kilometre-long conductor trend. GKI 002 intersected 0.27% U3O8 over 0.5 metres from 185.0 metres to 185.5 metres. In addition, GKI002 intersected hydrothermal alteration associated with large-scale reactivated fault zones.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/2864/181983_9da46cd7e443ba25_004.jpg

Figure 2 – Geikie Project Target Corridor Locations

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/2864/181983_9da46cd7e443ba25_004full.jpg

Assay results also confirm uranium enrichment in drillholes completed in the Preston Creek target area, located at the northeastern end of the 15-kilometre-long conductor trend. GKI005 intersected three intervals of uranium enrichment, most notably 0.06% U3O8 from 255.3 metres to 255.6 metres, associated with a sheared graphitic pelite (Table 1). GKI008 intersected two intervals of uranium enrichment, including 2.5 metres at 0.02 %U3O8 from 27.8 metres to 30.3 metres (Table 1). Drillholes in the Preston Creek target area were drilled in a zone of structural disruption, where a north to north-northwest trending fault transects the conductor trend. Each drill hole in this target area intersected reactivated basement faults of up to 30 metres in width, consisting of clay gouge and breccias within variably graphitic pelitic host rocks. Hydrothermal alteration enveloping the major fault zones consisted of hematite, chlorite, clay, and structurally-enhanced graphitic clays. Within the fault zones, the alteration intensifies and locally overprints the original host.

The 2023 drilling program successfully intersected graphitic host rocks with large reactivated and brecciated fault zones, associated with hydrothermal alteration, uranium mineralization, and uranium enrichment. The drill program confirmed the presence of hydrothermal alteration systems within a complex structural framework at Geikie, features which are commonly associated with basement-hosted high-grade uranium deposits elsewhere in the Athabasca Basin. Results of this first drill program will allow for refinement of the exploration model on the Geikie project to advance the most prospective portions of the multiple target corridors. Early results from the Preston Creek target area indicate the 15-kilometre-long structural corridor represents a high-priority area for further drill testing.

Falcon Airborne Gravity Gradiometer Survey Completed

The Company is pleased to report that the detailed fixed-wing Falcon Airborne Gravity Gradiometer (AGG) survey on the Geikie project has been completed. The survey consisted of approximately 1,800 line-kilometres of airborne surveying at 200 m spacing across the majority of the Geikie project. The purpose of the AGG survey, a demonstrated successful technique in identifying uranium alteration systems in the Athabasca Basin, is to identify potential target areas of enhanced basement alteration associated with previously interpreted and drill defined structural corridors. The exploration potential of the current targets and the broader Geikie project is highlighted through the styles and significance of alteration observed in drilling at the Preston Creek and Aero Lake Prospects.

Once processing has been finalized, the AGG survey results will be combined with existing high-resolution airborne geophysical data sets previously collected, including electromagnetics, radiometrics, magnetics, and the recent drill hole information, to validate existing targets and generate additional targets for future drill programs. The Company is actively planning a drill program for 2024 on the Geikie project. The Geikie project is currently being sole-funded by Basin Energy Limited (ASX: BSN) under an option earn-in agreement with the Company.

CanAlaska CEO, Cory Belyk, comments, "Confirmation of the presence of uranium mineralization and enrichment in at least two target areas on the Geikie project is a fantastic outcome from this first drilling program by CanAlaska and Basin Energy. The team looks forward to final processing of the gravity data that will undoubtedly provide added target inventory for this very large and prospective project area for the next phase of drilling scheduled for 2024. These are exceptional results at this early stage of project evaluation and is a testament to the project generating prowess of the CanAlaska technical team."

Table 1 - 2023 Geikie Exploration Drilling Results

DDHFrom
(m)
To
(m)
Length
(m)
6
Average Grade
(% U3O8)
Maximum Grade
(% U3O8)
GKI0021,3185.0185.50.50.270.27

GKI0052,4199.7200.00.30.020.02
GKI0052,4231.6232.10.50.010.01
GKI0052,4255.3255.60.30.060.06

GKI0082,527.830.32.50.020.03
GKI0082,576.476.70.30.070.07
  1. Intersection interval is composited above a cut-off grade of 0.1% U3O8 with a maximum of 1.0 m of internal dilution.
  2. Intersection interval is composited above a cut-off grade of 0.01% U3O8 with a maximum of 1.0 m of internal dilution.
  3. GKI002 was drilled at an azimuth of 128˚ with an inclination of -50˚, collared at 545,821 mE / 6,366,173 mN, 446 m A.S.L. (UTM NAD83 Z13N).
  4. GKI005 was drilled at an azimuth of 122˚ with an inclination of -45˚, collared at 551,424 mE / 6,373,287 mN, 436.7 m A.S.L. (UTM NAD83 Z13N).
  5. GKI008 was drilled at an azimuth of 100˚ with an inclination of -45˚, collared at 551,245 mE / 6,372,646 mN, 433.6 m A.S.L. (UTM NAD83 Z13N).
  6. All reported depths and intervals are drill hole depths and intervals, unless otherwise noted, and do not represent true thicknesses, which have yet to be determined.

 

Geochemical Sampling Procedures

All drill core samples from the 2023 program were shipped to the Saskatchewan Research Council Geoanalytical Laboratories (SRC) in Saskatoon, Saskatchewan in secure containment for preparation, processing, and multi-element analysis by ICP-MS and ICP-OES using total (HF:NHO3:HClO4) and partial digestion (HNO3:HCl), boron by fusion, and U3O8 wt% assay by ICP-OES using higher grade standards. Assay samples are chosen based on downhole probing radiometric equivalent uranium grades and scintillometer (SPP2 or CT007-M) peaks. Assay sample intervals comprise 0.3 - 0.5 metre continuous half-core split samples over the mineralized interval. One half of the split sample is retained and the other sent to the SRC for analysis. The SRC is an ISO/IEC 17025/2005 and Standards Council of Canada certified analytical laboratory. Blanks, standard reference materials, and repeats are inserted into the sample stream at regular intervals by CanAlaska and the SRC in accordance with CanAlaska's quality assurance/quality control (QA/QC) procedures. For results from the Geikie project, a qualified person employed by CanAlaska has performed detailed QAQC and data verification, were possible, of all datasets prior to disclosure.

All reported depths and intervals are drill hole depths and intervals, unless otherwise noted, and do not represent true thicknesses, which have yet to be determined.

Other News

The Company is currently drilling at its West McArthur and Moon Lake South uranium projects in the eastern Athabasca Basin, advancing two new high-grade uranium discoveries.

About CanAlaska Uranium

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) holds interests in approximately 350,000 hectares (865,000 acres), in Canada's Athabasca Basin - the "Saudi Arabia of Uranium." CanAlaska's strategic holdings have attracted major international mining companies. CanAlaska is currently working with Cameco and Denison at two of the Company's properties in the Eastern Athabasca Basin. CanAlaska is a project generator positioned for discovery success in the world's richest uranium district. The Company also holds properties prospective for nickel, copper, gold and diamonds. For further information visit www.canalaska.com.

The Qualified Person under National Instrument 43-101 Standards of Disclosure for Mineral Projects for this news release is Nathan Bridge, MSc., P. Geo., Vice-President Exploration for CanAlaska Uranium Ltd., who has reviewed and approved its contents.

On behalf of the Board of Directors
"Cory Belyk"
Cory Belyk, P.Geo., FGC
CEO, President and Director
CanAlaska Uranium Ltd.

Contacts:

Cory Belyk, CEO and President
Tel: +1.604.688.3211 x 138
Email: cbelyk@canalaska.com

General Enquiry
Tel: +1.604.688.3211
Email: info@canalaska.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-looking information

All statements included in this press release that address activities, events or developments that the Company expects, believes or anticipates will or may occur in the future are forward-looking statements. These forward-looking statements involve numerous assumptions made by the Company based on its experience, perception of historical trends, current conditions, expected future developments and other factors it believes are appropriate in the circumstances. In addition, these statements involve substantial known and unknown risks and uncertainties that contribute to the possibility that the predictions, forecasts, projections and other forward-looking statements will prove inaccurate, certain of which are beyond the Company's control. Readers should not place undue reliance on forward-looking statements. Except as required by law, the Company does not intend to revise or update these forward-looking statements after the date hereof or revise them to reflect the occurrence of future unanticipated events.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/181983

News Provided by Newsfile via QuoteMedia

CVV:CA
The Conversation (0)
CanAlaska Announces Senior Management Change

CanAlaska Announces Senior Management Change

Misty Urbatsch, Vice-President Corporate Development, Resigns Position to Focus on Core Nickel Corp

Appointed to Advisory Board of CanAlaska

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Increases Private Placement Financing to $12 Million

CanAlaska Increases Private Placement Financing to $12 Million

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) ("CanAlaska" or the "Company") announces that further to its news release of November 20, 2023, due to increased demand, it is increasing the total gross amount to be raised under its non-brokered private placement to $12 million (the "Offering"). The Offering will be comprised of a combination of: (i) non-flow-through units (the "NFT Units") to be sold at a price of $0.36 per NFT Unit; (ii) flow-through units of the Company (each, a "FT Unit") to be sold at a price of $0.425 per FT Unit; and (iii) flow-through units to be sold to charitable purchasers (each, a "Charity FT Unit") to be sold at a price of $0.5575 per Charity FT Unit.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Announces up to $7.5 Million Private Placement Financing

CanAlaska Announces up to $7.5 Million Private Placement Financing

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7) ("CanAlaska" or the "Company") announces that it proposes to undertake a non-brokered private placement of securities to raise total gross proceeds of up to $7.5 million (the "Offering"). The Offering will be comprised of a combination of: (i) non-flow-through units (the "NFT Units") to be sold at a price of $0.36 per NFT Unit; (ii) flow-through units of the Company (each, a "FT Unit") to be sold at a price of $0.425 per FT Unit; and (iii) flow-through units to be sold to charitable purchasers (each, a "Charity FT Unit") to be sold at a price of $0.5575 per Charity FT Unit.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Reports Large Gravity Targets Identified at Geikie Project in Athabasca Basin

CanAlaska Reports Large Gravity Targets Identified at Geikie Project in Athabasca Basin

Airborne Gravity Survey Highlights Numerous Targets Coincident with Regional Fault Structures and Mineralization

Winter Drilling Program Planned for Q1 2024

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
CanAlaska Uranium Ltd. and Core Nickel Corp. Announce Closing of Spin-Out Plan of Arrangement

CanAlaska Uranium Ltd. and Core Nickel Corp. Announce Closing of Spin-Out Plan of Arrangement

CanAlaska Uranium Ltd. (TSXV: CVV) (OTCQX: CVVUF) (FSE: DH7N) ("CanAlaska" or the "Company") and Core Nickel Corp. ("Core Nickel") are pleased to announce that further to CanAlaska's press releases dated September 5, 2023 and October 26, 2023, the plan of arrangement spin-out transaction (the "Arrangement") has closed effective November 10, 2023 (the "Effective Date").

Completion of the Arrangement, as set forth in the arrangement agreement dated September 1, 2023 (the "Arrangement Agreement"), entered into between the CanAlaska and Core Nickel, was approved by the shareholders of CanAlaska (the "CanAlaska Shareholders") on October 25, 2023; by a Final Order granted by the Supreme Court of British Columbia on October 31, 2023, in accordance with Part 9 of the Business Corporations Act (British Columbia), and accepted by the TSX Venture Exchange (the "TSXV").

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Baselode Reports High Levels of Radioactivity Over Wide Intercepts at ACKIO Uranium Project

Baselode Reports High Levels of Radioactivity Over Wide Intercepts at ACKIO Uranium Project

  • Over 30 metres of continuous radioactivity, such as 907 cps over 34 m, including 9,173 cps over 0.4 m
  • AK24-118 and AK24-119 returned the widest radioactivity levels in Pod 6
  • All three drill holes with over 20 metres of cumulative thickness of radioactivity
  • The second drill for regional exploration targets has now mobilized to site

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce radioactivity results from the first three diamond drill holes within the ACKIO ("ACKIO") uranium prospect of the Hook project ("Hook") in the Athabasca Basin area of northern Saskatchewan (Figure 1).

"AK24-119's results rank as one of the top 10 best drill hole radioactivity intersections at ACKIO, making this a unique drill hole. Previous drill hole AK22-035 intersected 0.54% U3O8 over 7.3 m (see Baselode News Release dated September 12, 2022) in Pod 6, and we are seeing similar levels of radioactivity within AK24-118 and AK24-119 but over broader widths within the same Pod, suggesting mineralization remains open in this area. ACKIO has continued to deliver encouraging results since the discovery in 2021, and we expect more promising results to follow.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project

Skyharbour and JV Partner Orano Announce Completion of Geophysics and Upcoming Commencement of Field Program at Preston Uranium Project

Skyharbour Resources Ltd. (TSX-V: SYH ) (OTCQX: SYHBF ) (Frankfurt: SC1P ) ("Skyharbour" or the "Company"), is pleased to announce that its joint-venture partner company, Orano Canada Inc. ("Orano"), has recently completed a geophysical program at the 49,635 hectare Preston Uranium Project ("Preston" or the "Property") located in the western Athabasca Basin, Saskatchewan, Canada. The program included a ground electromagnetic survey (ML-TEM) and a ground gravity survey. Orano is now preparing for a Spatiotemporal Geochemical Hydrocarbons (SGH) soil sampling program that will take place this summer at the project.

Location Map of Preston Project:
https://www.skyharbourltd.com/_resources/maps/Sky_Preston_20211209.jpg

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Purepoint Uranium Redefines Turnor Lake Project with Latest Technology and Advanced Data Integration

Purepoint Uranium Redefines Turnor Lake Project with Latest Technology and Advanced Data Integration

Purepoint Uranium Group Inc. (TSXV: PTU) (OTCQB: PTUUF) ("Purepoint" or the "Company") today announced significant exploration advancements at its Turnor Lake project, located in the prolific Athabasca Basin of Northern Saskatchewan. After nearly 15 years since the last major drilling campaign, Turnor Lake is being revitalized with a completely fresh geological and geophysical outlook, positioning it as a potential host for the next major uranium discovery in Saskatchewan. A drill program is currently underway at Turnor Lake, aiming to explore and define the extent of uranium mineralization.

The Turnor Lake project spans 9,705 hectares across vital structural and conductive corridors, aligning with the region's significant uranium discoveries and historical high-grade deposits. Our exploration revitalization is driven by the application of advanced technology and methodologies while integrating a wealth of historical data with ongoing real-time drilling insights.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Nuclear Fuels Appoints Gregory Huffman as Chief Executive Officer

Nuclear Fuels Appoints Gregory Huffman as Chief Executive Officer

CSE:NF
OTCQX:NFUNF

Nuclear Fuels Inc. (CSE: NF) (OTCQX: NFUNF) ("Nuclear Fuels" or the "Company") today announced the appointment of Mr. Gregory Huffman as Chief Executive Officer, President and Director of the Company effective immediately. Mr. Huffman brings over two decades of mining analysis and equity finance experience to the Company, with a focus on uranium and other energy-related metals.  In connection with his appointment, Mr. Huffman will purchase by way of private placement a total of 2,000,000 units at $0.35 per unit, each consisting of a common share and a half of a share warrant, with each whole warrant exercisable at a price of $0.55 for two years.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Blue Sky Uranium Launches Strategic Exploration Program for In-Situ Recovery Uranium Targets in Argentina with Two New Project Acquisitions

Blue Sky Uranium Launches Strategic Exploration Program for In-Situ Recovery Uranium Targets in Argentina with Two New Project Acquisitions

TSX Venture Exchange: BSK
Frankfurt Stock Exchange: MAL2
OTCQB Venture Market (OTC): BKUCF

Blue Sky Uranium Corp. (TSXV: BSK) (FSE: MAL2) (OTC: BKUCF), "Blue Sky" or the "Company") is pleased to announce the acquisition of two new projects totaling nearly 80,000 hectares that are prospective for discovery of uranium deposits amenable to In Situ Recovery (" ISR ") in the Neuquén Basin of Argentina (see Figure 1 ). These acquisitions represent a strategic initiative to broaden the Company's medium to long-term prospects for discovery of additional uranium mineral resources.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Baselode Now Drilling at ACKIO Uranium Prospect

Baselode Now Drilling at ACKIO Uranium Prospect

  • Up to 16,000 metre project-wide drill program, the second largest drill program on Hook project
  • The second drill is anticipated to start in two weeks

Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("Baselode" or the "Company") is pleased to announce diamond drilling has started on the ACKIO ("ACKIO") uranium prospect within the Hook project ("Hook") in the Athabasca Basin area of northern Saskatchewan (Figure 1).

"We are excited to be finally be back at our flagship Hook project, where we will be looking to expand upon our near-surface uranium discovery ACKIO. Additional drilling on ACKIO offers excellent prospects for expanding the known zones and making new discoveries along strike and depth.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×