CANADA SILVER COBALT Amends Warrants and Announces Warrant Exercise Incentive Program

CANADA SILVER COBALT Amends Warrants and Announces Warrant Exercise Incentive Program

(TheNewswire)

Canada Silver Cobalt Works Inc.

Coquitlam, BC TheNewswire - November24, 2022 - Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt") announces that further to its news release dated September 19, 2022, it is amending the terms of an aggregate of 3,798,800 outstanding common share purchase warrants ("Warrants") issued pursuant to a private placement that closed on November 25, 2020. The Warrants have an exercise price of $0.80 and an expiry date of November 27, 2022. The Company will amend the Warrant exercise price to $0.1125 per share and extend the Warrant expiry date by two years to November 27, 2024.

The Warrants, as amended, will be subject to an accelerated expiry provision such that if for any ten consecutive trading days (the "Premium Trading Days") during the unexpired term of the Warrants, the closing price of the Company's shares on the TSX Venture Exchange exceeds $0.14, representing the amended Warrant exercise price of $0.1125 plus 25%, the exercise period of the Warrants will be reduced to 30 days, starting seven days after the last Premium Trading Day. The Company will announce any such accelerated expiry date by press release. All other terms of the Warrants remain unchanged.

The Company has obtained consent from all of the warrant holders to amend the Warrants.  The amendment of the Warrants is subject to TSX Venture Exchange (the "Warrant Amendment Approval").

Warrant Exercise Incentive Program

The Company also announces that if it obtains Warrant Amendment Approval, the Company will institute a warrant exercise incentive program (the "Incentive Program") designed to encourage the early exercise of the 3,997,333 Warrants. Under the Incentive Program, the Company will offer an inducement to each Warrant holder that exercises its Warrants during a period of 30 days from receipt of Warrant Amendment Approval, by the issuance of one additional common share purchase warrant (an "Incentive Warrant") for each Warrant exercised during the 30-day period. Each Incentive Warrant will entitle the holder to purchase one additional common share of the Company at a price of $0.15 for a period of one year from the date of Warrant Amendment Approval.

The Incentive Program will commence upon receipt of Warrant Amendment Approval and will expire 30 days thereafter at 4:00 p.m. (Vancouver time). The Incentive Warrants will include an accelerated expiry provision such that if, for any ten consecutive trading days during the one-year term of the Incentive Warrants, the closing price of the Company's shares on the TSX Venture Exchange is at least $0.15, the exercise period of the Incentive Warrants will be reduced to 30 days. The Company will announce any such accelerated expiry date of the Incentive Warrants by press release.

The Company intends to issue an updating news release upon receipt, if any, of Warrant Amendment Approval and commencement of the Incentive Program, outlining the terms and conditions and the method of exercising Warrants pursuant to the Incentive Program. The Incentive Program is subject to approval by the TSX Venture Exchange.

About Canada Silver Cobalt Works Inc.

Canada Silver Cobalt Works Inc. recently discovered a major high-grade silver vein system at Castle East located 1.5 km from its 100%-owned, past-producing Castle Mine near Gowganda in the prolific and world-class silver-cobalt mining district of Northern Ontario. The Company has completed a 60,000 m drill program aimed at expanding the size of the deposit with an update to the resource estimate underway.

In May 2020, based on a small initial drill program, the Company published the region's first 43-101 resource estimate that contained a total of 7.56 million ounces of silver in Inferred resources, comprising very high-grade silver (8,582 grams per tonne un-cut or 250.2 oz/ton) in 27,400 tonnes of material from two sections (1A and 1B) of the Castle East Robinson Zone, beginning at a vertical depth of approximately 400 meters. Note that mineral resources that are not mineral reserves do not have demonstrated economic viability. Please refer to Canada Silver Cobalt Works Press Release May 28, 2020, for the resource estimate. Report reference: Rachidi, M. 2020, NI 43-101 Technical Report Mineral Resource Estimate for Castle East, Robinson Zone, Ontario, Canada, with an effective date of May 28, 2020, and a signature date of July 13, 2020.

The Company also has: (1) 14 battery metals properties in Northern Quebec where it has recently completed an almost 15,000-metre drill program on the Graal property and an airborne VTEM geophysical survey is being conducted at its Lowney-Lac Edouard property; and (2) the prospective 1,000-hectare Eby-Otto gold property close to Agnico Eagle's high-grade Macassa Mine near Kirkland Lake, Ontario where it is exploring in 2022.

Canada Silver Cobalt's flagship silver-cobalt Castle mine and 78 sq. km Castle Property feature strong exploration upside for silver, cobalt, nickel, gold, and copper. With underground access at the fully-owned Castle Mine, an exceptional high-grade silver discovery at Castle East, a pilot plant to produce cobalt-rich gravity concentrates, a processing facility (TTL Laboratories) in the town of Cobalt, and a proprietary hydrometallurgical process known as Re-2Ox (for the creation of technical-grade cobalt sulphate as well as nickel-manganese-cobalt (NMC) formulations), Canada Silver Cobalt is strategically positioned to become a Canadian leader in the silver-cobalt space. More information at www.canadasilvercobaltworks.com .

"Frank J. Basa"

Frank J. Basa, P. Eng.

Chief Executive Officer

For further information, contact:

Frank J. Basa, P.Eng.

Chief Executive Officer

416-625-2342

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Caution Regarding Forward-Looking Statements

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. This news release may contain forward-looking statements which include, but are not limited to, comments that involve future events and conditions, which are subject to various risks and uncertainties. Except for statements of historical facts, comments that address resource potential, upcoming work programs, geological interpretations, receipt and security of mineral property titles, availability of funds, and others are forward-looking. Forward-looking statements are not guarantees of future performance and actual results may vary materially from those statements. General business conditions are factors that could cause actual results to vary materially from forward-looking statements. A detailed discussion of the risk factors encountered by Canada Silver Cobalt is available in the Company's Annual Information Form dated July 19, 2021 for the fiscal year ended December 31, 2020 available under the Company's profile on SEDAR at www.sedar.com.

Copyright (c) 2022 TheNewswire - All rights reserved.

News Provided by TheNewsWire via QuoteMedia

CCW:CA
The Conversation (0)
Canada Silver Announces Effective Date of Name Change to "NORD PRECIOUS METALS MINING INC."

Canada Silver Announces Effective Date of Name Change to "NORD PRECIOUS METALS MINING INC."

(TheNewswire)

Canada Silver Cobalt Works Inc.

January 19, 2024 TheNewswire - Coquitlam, BC, Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt") is pleased to announce that further to its news release dated January 4, 2024, the TSX Venture Exchange has accepted the name change to " Nord Precious Metals Mining Inc. ".

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Announces Name Change to Nord Precious Metals Mining Inc.

Canada Silver Announces Name Change to Nord Precious Metals Mining Inc.

(TheNewswire)

Canada Silver Cobalt Works Inc.

Coquitlam, BCCanada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the "Company" or "Canada Silver Cobalt is pleased to announce that shareholders at the Annual and General Meeting held on October 31, 2023 voted in favour to change the Company's name to "Nord Precious Metals Mining Inc".  The new name will better reflect the direction of the Company.  The name change is subject to TSX Venture Exchange ("Exchange") approval.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt Works Reflects on a Productive Year of Achievements

Canada Silver Cobalt Works Reflects on a Productive Year of Achievements

(TheNewswire)

Canada Silver Cobalt Works Inc.

New discoveries of precious and battery metals and progress towards surfacing value for shareholders through a spinout of a potentially large nickel-copper-cobalt property in Quebec

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt Begins Drilling at Lowney-Lac Edouard in Quebec, Targeting Nickel-Copper-Cobalt Mineralization

Canada Silver Cobalt Begins Drilling at Lowney-Lac Edouard in Quebec, Targeting Nickel-Copper-Cobalt Mineralization

(TheNewswire)

Canada Silver Cobalt Works Inc.

The property has many yet-to-be-drilled targets and prospective electromagnetic anomalies identified by an airborne geophysical survey.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Canada Silver Cobalt to Reprice Warrants

Canada Silver Cobalt to Reprice Warrants

(TheNewswire)

Canada Silver Cobalt Works Inc.

Canada Silver Cobalt Works Inc. (TSXV:CCW) (OTC:CCWOF) (Frankfurt:4T9B) (the " Company " or " Canada Silver Cobalt ") announces that it is proposing to amend the terms of an aggregate 23,380,092 outstanding common share purchase warrants ("Warrants") by amending the exercise price to $0.06 per share

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Victory is Pleased to Announce the Appointment of Gary Musil to the Company's Board of Directors and a Private Placement

Victory is Pleased to Announce the Appointment of Gary Musil to the Company's Board of Directors and a Private Placement

Victory Battery Metals Corp. (CSE:VR)(OTC PINK:VRCFF)(FWB:VR6) welcomes Gary Musil as a director of the Company, effective July 1, 2024. Gary Musil has more than 35 years of management and financial consulting experience and has served as an officer and director on numerous public companies since 1988. This experience has resulted in his overseeing the financial aspects and expenditures on exploration projects in Peru, Chile, Eastern Europe (Slovak Republic), and British Columbia, Ontario, Quebec, Saskatchewan and New Brunswick (Canada). Prior to his public company work, he was employed for 15 years with Dickenson Mines Ltd. and Kam-Kotia Mines Ltd., as the Controller for their producing silverleadzinc mine in the interior of British Columbia

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Albemarle Announces Quarterly Common Stock Dividend

Albemarle Announces Quarterly Common Stock Dividend

The Board of Directors of Albemarle Corporation (NYSE: ALB) announces that it has declared a quarterly common stock dividend of $0.405 per share. The dividend, which has an annualized rate of $1.62 is payable Oct. 1, 2024 to shareholders of record at the close of business as of Sept. 13, 2024 . For 30 consecutive years, Albemarle has raised its dividend.

Albemarle Corp. Logo. (PRNewsFoto/Albemarle Corporation)

About Albemarle
Albemarle Corporation (NYSE: ALB) leads the world in transforming essential resources into critical ingredients for mobility, energy, connectivity and health. We partner to pioneer new ways to move, power, connect and protect with people and planet in mind. A reliable and high-quality global supply of lithium and bromine allows us to deliver advanced solutions for our customers. Learn more about how the people of Albemarle are enabling a more resilient world at Albemarle.com , LinkedIn and on X (formerly known as Twitter) @AlbemarleCorp .

Albemarle regularly posts information to www.albemarle.com , including notification of events, news, financial performance, investor presentations and webcasts, non-GAAP reconciliations, U.S. Securities and Exchange Commission filings and other information regarding the company, its businesses and the markets it serves.

Forward-Looking Statements

Some of the information presented in this press release, including, without limitation, information related to future dividends and results, and all other information relating to matters that are not historical facts may constitute forward- looking statements within the meaning of the Private Securities Litigation Reform Act of 1995. Actual results could differ materially from the views expressed. Factors that could cause actual results to differ materially from the outlook expressed or implied in any forward-looking statement include, without limitation: changes in economic and business conditions; adverse changes in liquidity or financial or operating performance; changes in the demand for our products or the end-user markets in which our products are sold and the other factors detailed from time to time in the reports we file with the U.S. Securities and Exchange Commission, including those described under "Risk Factors" in our Annual Report on Form 10-K and our Quarterly Reports on Form 10-Q. These forward-looking statements speak only as of the date of this press release. We assume no obligation to provide any revisions to any forward-looking statements should circumstances change, except as otherwise required by securities and other applicable laws.

Investor Relations Contact: Meredith Bandy , +1 (980) 999-5768, meredith.bandy@albemarle.com
Media Contact: Peter Smolowitz
, +1 (980) 308-6310, media@albemarle.com

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/albemarle-announces-quarterly-common-stock-dividend-302198618.html

SOURCE Albemarle Corporation

News Provided by PR Newswire via QuoteMedia

Keep reading...Show less
Altech Batteries Ltd  Update on CERENERGY ABS60 Battery-pack Prototypes

Altech Batteries Ltd Update on CERENERGY ABS60 Battery-pack Prototypes

Perth, Australia (ABN Newswire) - Altech Batteries Limited (ASX:ATC) (FRA:A3Y) (OTCMKTS:ALTHF) is pleased to provide an update on the production of its CERENERGY(R) ABS60 BatteryPack prototypes. All 240 cells for the first ABS60 BatteryPack Prototype have now been fabricated, assembled and initialized at Fraunhofer IKTS Hermsdorf's pilot plant.

Highlights

- Prototype production is progressing well

- All CERENERGY(R) cells for the first 60 KWh Prototype completed

- Cell contacting system manufacturing finished and delivered

- Improved cell electrode design showing excellent results

- Cell quality tests by Fraunhofer delivering better than expected capacity

- Welding of cells to cell contacting system underway

- Completed modules will be mounted into ABS60 BatteryPack next week

To validate a homogeneous cathode material distribution, all cells were cycled through several testing stations at Fraunhofer IKTS Hermsdorf and Arnstadt.

IMPROVED CELL ELECTRODE DESIGN

During the fabrication of the two 60kWh CERENERGY(R) ABS60 BatteryPack prototypes, the Altech and Fraunhofer team made several design improvements to the cell's positive probe. These enhancements aimed to boost the cell's energy capacity and reduce the nickel content. The "V2" design of the positive probe allows for slightly faster charging and discharging while lowering the unit costs of the battery. Testing revealed that most cells had higher-than-expected energy capacities, an outstanding result that strongly supports the chosen electrode design. With all cells manufactured according to the series design and optimized processes, the best cells to date have been completed. The table below demonstrates that all the cells are meeting the expected specifications.

CELL CONTACTING SYSTEM COMPLETED

The Cell Contacting System (CCS) has undergone stringent testing and has now been completed and delivered by key supplier Hofer AG. The CCS was delivered to Fraunhofer IKTS in Dresden, where all parts of the modules will be collected to assemble each of the five modules. Each module contains 48 cells, that are currently being welded to the CCS by an external service provider.

After welding is completed, the ABS60 BatteryPack with its 60 kWh capacity can be completely assembled.

MODULE WELDING TRIALS

To guarantee the most time-efficient welding, a unique tool was designed and built at Xenon, which is responsible for welding and quality control across the 120 MWh battery plant. After completing the welding tool, it was shipped to an external laboratory, accompanied by a test module and several trial cells. The aim was to determine the best working parameters and to proof the handling of certain parts of the module.

The trials were successfully finished.

CELL MANUFACTURING PROGRESSING WELL

All 240 cells for the first ABS60 BatteryPack Prototype have been assembled and initialised at Fraunhofer IKTS, Hermsdorf. To validate a homogeneous cathode material distribution, all cells were cycled through several testing stations at Fraunhofer IKTS Hermsdorf and Arnstadt.

INTERIM CELL TESTING

At Fraunhofer IKTS in Hermsdorf, all cells were scanned using a unique X-ray microtomography device that enables the ability to look inside cells after they are hermetically closed. This is required to ensure the most homogeneous material distribution inside the cells as well as the best possible alignment of cell components e.g. electrode. The results have been excellent to date. Another quality assurance procedure involved cycling cells to ensure the electrical requirements and parameters are operating as designed.

MODULE WELDING AND BATTERYPACK ASSEMBLY

After every cell passed all quality checks, the modules containing the cells were shipped to the laboratory for welding onto the CCS. By using the predetermined parameters for welding, all modules have been successfully welded. After completion, the modules will be shipped to Fraunhofer IKTS, Dresden, where all five modules will then be mounted into the ABS60 BatteryPack and the first Prototype will be completed.

This will enable testing and demonstration to potential customers, to prove individual use cases for each customer.

ABOUT THE ABS60 - BATTERYPACK

The 60kWh Altech Battery Pack consists of five 12kWh modules with 48 cells each, mounted on top of each other and sealed in a thermal isolated stainless steel hood housing. The Battery management system is mounted at the base. To maintain thermal self-sufficiency, an insulation hood was designed, where the required heat of the system can be maintained inside the BatteryPack as long as possible, although the outer surface only has ambient temperature. This was achieved by using vacuum insulation. The base of each module is designed to accommodate folklift transport for easy mounting into the GridPack.

Commenting on the progress, MD and CEO Iggy Tan stated "Altech's team in Germany, together with its joint venture partner Fraunhofer, and with the assistance of key suppliers, have made excellent progress on the fabrication of two 60kWh CERENERGY(R) ABS60 BatteryPack prototypes. All components for the first BatteryPack have now been fabricated. Altech is now completing the welding of the cells to the Cell Contacting System, after which the five completed battery modules will be delivered to Fraunhofer IKTS in Dresden, where all five modules will be mounted into the ABS60 BatteryPack and the first ABS60 Prototype will be completed. The BatteryPack will then be available for testing and demonstration to potential customers, thereby assisting Altech in securing offtake and finance for the 120MWh CERENERGY(R) battery plant to be constructed on Altech's land in Germany".

*To view tables and figures, please visit:
https://abnnewswire.net/lnk/O449B2I4



About Altech Batteries Ltd:

Altech Batteries Limited (ASX:ATC) (FRA:A3Y) is a specialty battery technology company that has a joint venture agreement with world leading German battery institute Fraunhofer IKTS ("Fraunhofer") to commercialise the revolutionary CERENERGY(R) Sodium Alumina Solid State (SAS) Battery. CERENERGY(R) batteries are the game-changing alternative to lithium-ion batteries. CERENERGY(R) batteries are fire and explosion-proof; have a life span of more than 15 years and operate in extreme cold and desert climates. The battery technology uses table salt and is lithium-free; cobalt-free; graphite-free; and copper-free, eliminating exposure to critical metal price rises and supply chain concerns.

The joint venture is commercialising its CERENERGY(R) battery, with plans to construct a 100MWh production facility on Altech's land in Saxony, Germany. The facility intends to produce CERENERGY(R) battery modules to provide grid storage solutions to the market.

News Provided by ABN Newswire via QuoteMedia

Keep reading...Show less
Nevada Sunrise Initiates Data Review to Develop New Drill Targets at the Coronado Copper Project, Nevada

Nevada Sunrise Initiates Data Review to Develop New Drill Targets at the Coronado Copper Project, Nevada

Nevada Sunrise Metals Corporation (TSXV: NEV) (OTCBB: NVSGF) ("Nevada Sunrise" or the "Company") is pleased to announce that the Company has initiated a geological and geophysical data review on its Coronado Copper Project (" Coronado ", or the " Project ") located in Pershing County, Nevada approximately 48 kilometers (30 miles) southeast of Winnemucca . The purpose of the Coronado data review is to identify new, shallow drill targets in an area of the Project where historical drilling in 1976 identified high-grade copper mineralization.

Highlights of the Coronado Copper Project

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
NextSource Materials Appoints Jaco Crouse as Chief Financial Officer

NextSource Materials Appoints Jaco Crouse as Chief Financial Officer

NextSource Materials Inc. (TSX:NEXT)(OTCQB:NSRCF) ("NextSource" or the "Company") announces the appointment of Jaco Crouse as Chief Financial Officer (CFO) of the Company as part of its global growth strategy

Mr. Crouse today replaces Marc Johnson who has served as CFO since October 2015. Mr. Johnson will continue to provide consulting services to the Company to assist with the smooth transition of this role. The Board of Directors of the Company would like to thank Mr. Johnson for his service to the Company over the years and wishes him well in his future endeavours.

News Provided by ACCESSWIRE via QuoteMedia

Keep reading...Show less
Nevada Sunrise Signs Indicative Term Sheet to Sell Remaining Interest in the Kinsley Mountain Gold Project, Nevada

Nevada Sunrise Signs Indicative Term Sheet to Sell Remaining Interest in the Kinsley Mountain Gold Project, Nevada

Nevada Sunrise Metals Corp. (TSXV: NEV) (OTCBB: NVSGF) ("Nevada Sunrise" or the "Company") announced today that it has signed a non-binding, indicative term sheet with CopAur Minerals Inc. (" CopAur ") for CopAur to acquire Nevada Sunrise's remaining ownership interest in the Kinsley Mountain Gold Project in Nevada (" Kinsley Mountain "). If the transaction is completed, CopAur will own 100% of Kinsley Mountain .

Nevada Sunrise Metals Corporation Logo (CNW Group/Nevada Sunrise Metals Corporation)

The indicative term sheet outlines a potential transaction whereby CopAur would acquire Nevada Sunrises' 18.74% ownership interest in Kinsley Mountain in consideration of the payment of CDN$475,000 and the issuance of 1,000,000 common shares of CopAur (the "Shares"). The Shares would be deposited in escrow and released in successive releases of 250,000 Shares once every calendar quarter commencing after expiry of the four-month statutory hold period following the closing date. The terms of the transaction are indicative and the final terms are subject to the negotiation and completion of a definitive agreement on terms acceptable to Nevada Sunrise and CopAur. The transaction is subject to a number of conditions including CopAur arranging a financing in the amount of a minimum of CDN$475,000 , completion of satisfactory due diligence, and the fulfilment of various closing conditions, including acceptance by the TSX Venture Exchange.

About Kinsley Mountain

Kinsley Mountain was a historical past producer that yielded 138,000 ounces of near-surface, open-pit oxide gold between 1995 and 1999, and currently hosts a compliant National Instrument 43-101 mineral resource. A technical report on Kinsley Mountain entitled "Technical Report of the Kinsley Project, Elko and White Pine Counties, Nevada, U.S.A. ", dated June 21, 2021 , with an effective date of May 5, 2021 , prepared by Michael M. Gustin and Gary L. Simmons , is available for review under New Placer Dome Gold Corp.'s issuer profile on sedarplus.ca

About Nevada Sunrise

Nevada Sunrise is a junior mineral exploration company with a strong technical team based in Vancouver, BC , Canada , that holds interests in lithium, gold and copper exploration projects located in the State of Nevada, USA .

Nevada Sunrise owns 100% interests in the Gemini, Jackson Wash and Badlands lithium projects, all of which are located in the Lida Valley in Esmeralda County, NV , and in the Pelican lithium project in Saskatchewan, Canada . The Company owns Nevada Water Right Permit 86863, also located in the Lida Valley basin, near Gold Point, NV.

Nevada Sunrise has the right to earn a 100% interest in the Coronado Copper Project , located approximately 48 kilometers (30 miles) southeast of Winnemucca, NV.

The Company owns an 18.74% interest in the Kinsley Mountain Gold Project near Wendover, NV , in a joint venture with CopAur, which is now the subject of a potential transaction between Nevada Sunrise and CopAur.

FORWARD LOOKING STATEMENTS

This release may contain forward–looking statements. Forward looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or that events or conditions "will", "would", "may", "could" or "should" occur and include disclosure of anticipated exploration activities. Although the Company believes the expectations expressed in such forward–looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in forward looking statements. Forward–looking statements are based on the beliefs, estimates and opinions of the Company's management on the date such statements were made. The Company expressly disclaims any intention or obligation to update or revise any forward–looking statements whether as a result of new information, future events or otherwise.

Such factors include, among others, risks related to: the completion of the potential transaction with CopAur Minerals Inc. for the purchase of the Company's remaining participating interest in the Kinsley Mountain Gold Project joint venture; reliance on technical information provided by third parties on any of our exploration properties; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; labor disputes and other risks of the mining industry; delays due to pandemic; delays in obtaining governmental approvals, financing or in the completion of exploration, as well as those factors discussed in the section entitled "Risk Factors" in the Company's Management Discussion and Analysis for the Six Months Ending March 31 , 2024,  which is available under Company's SEDAR profile at www.sedar.com .

Although Nevada Sunrise has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Nevada Sunrise disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise. Accordingly, readers should not place undue reliance on forward-looking information.

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

SOURCE Nevada Sunrise Metals Corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/July2024/08/c5338.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×