Battery Mineral Resources Continues to Deliver Favorable Drilling Results at Punitaqui Copper Mine

Battery Mineral Resources Continues to Deliver Favorable Drilling Results at Punitaqui Copper Mine

Battery Mineral Resources Corp. (TSXV: BMR) (OTCQB: BTRMF) ("Battery" or "BMR" or the "Company") is pleased to announce encouraging drill core assay results from the on-going 2021 exploration and in-fill drill program at the San Andres zone of the Punitaqui mine complex ("Punitaqui") in Chile. Punitaqui is slated for resumption of copper concentrate production in the second half of 2022.

San Andres is the "normal" fault displaced upper portion of the adjacent Cinabrio copper deposit that is part of Punitaqui. Cinabrio was the primary source of copper for the Punitaqui mill which typically produced between 20 and 25 million pounds of copper annually and was operated for nine plus years by each of Glencore and Xiana Mining. The San Andres zone is one of several historic zones within BMR's Punitaqui project with partially delineated resource potential and established underground access. Historic wide-spaced drilling completed by the previous operators between 2011- 2020 totaled 9,676 meters in 76 holes.

Highlights

  • The San Andres drill program is designed to confirm resource potential identified over a 600-meter ("m") strike length by previous drilling programs.
  • Final assay results from remaining San Andres drillholes have been returned with encouraging results as follows (see Table 1):
    • SAS-21-36: 37.6 meters ("m") at 1.36% Copper ("Cu") including 27.4m at 1.55% Cu and including 14.7m at 2.12% Cu
    • SAS-21-35: 25.1m at 0.54% Cu including 6.9m at 1.10% Cu
    • SAS-21-34: 9.2m at 1.57% Cu
    • SAS-21-31: 2.8m at 1.74% Cu
    • SAS-21-25: 4.6m at 0.82% Cu
    • SAS-21-32: 4m at 1.44% Cu
    • SAS-21-38: 2.2m at 1.10% Cu
    • SAS-21-33: 2.0m at 0.73% Cu
    • SAS-21-37: 2.1m at 0.66% Cu
  • 8,156m of drilling in 38 diamond core holes were completed in the Phase 1 drill program at San Andres and final complete multi-element analytical results have been received for all samples.
  • Drilling tested the Target Stratigraphic Unit ("TSU") sediments to the north and south along strike and at depth. In total, 36 holes reached target depth and intersected the favorable mineralized horizon. Of those, 29 drillholes produced significant copper intercepts during the program.
  • Cross-sectional geological interpretation sections have been compiled and a three-dimensional San Andres zone geological model has been completed.
  • The geological model and corresponding assay database have been forwarded to JDS Energy & Mining to complete a resource estimate for San Andres.
  • A composite drillcore metallurgical sample from the San Andres zone was shipped to SGS Lakefield in Ontario where preliminary metallurgical testwork is underway.

Battery CEO Martin Kostuik states; "The completion of the first phase of drilling at the San Andres zone brings us one step closer to providing the market with BMR's maiden resource statement for Punitaqui. We believe these new drilling results complement the prior successful drilling at San Andres and, together, demonstrate that this drill program has the potential to provide the Company with an additional source of copper ore for the Punitaqui mill and longevity for the project. We look forward to providing further exciting updates for the drill program as we progress towards the 2022 resource update and funding the potential near term resumption of operations and cashflow at Punitaqui"

Previously released copper assay highlights include those as follows (see Table 2):

  • SAS-21-01: 3.0m grading 1.52% Cu
  • SAS-21-03: 11.0m at 1.39% Cu including 8.0m at 1.63% Cu
  • SAS-21-04: 16.7m grading 1.37% Cu including 11.7m at 1.64% Cu and a second interval of 9.0m at 1.75% Cu
  • SAS-21-05: 9.0m at 2.06% Cu
  • SAS-21-07: 3.4m at 2.10% Cu and a second interval of 4.0m at 1.56% Cu
  • SAS-21-08: 5.3m at 1.39% Cu and a second intervalof 3.8m at 1.85% Cu
  • SAS-21-11: 2.0m at 0.91% Cu
  • SAS-21-12: 7.0m at 1.81% Cu and a second intercept of 2m grading 1.04% Cu
  • SAS-21-13: 3.0m at 1.96% Cu, 3.0m grading 0.87% Cu and a third interval of 1.8m at 0.83% Cu
  • SAS-21-14: 28.1m at 0.98% Cu including 10.1m at 1.44% Cu and a second intercept of 9.4m grading 1.24% Cu
  • SAS-21-15: 3.0m at 0.5% Cu, 3.0m grading 0.48% Cu and a third interval of 2.0m at 0.51% Cu
  • SAS-21-17: 3.6m at 1.04% Cu
  • SAS-21-19: 5.0m at 1.08% Cu including 4.0m at 1.24% Cu
  • SAS-21-20: 2.4m at 0.70% Cu
  • SAS-21-21: 25.0m at 0.88% Cu including 13.0m at 0.96% Cu and 4.0m at 1.19% Cu and a second intercept of 2.0m at 1.12% Cu
  • SAS-21-23: 2.8m at 1.00% Cu
  • SAS-21-24: 3.0m at 0.82% Cu
  • SAS-21-27: 11m at 2.16% Cu
  • SAS-21-29: 16m at 1.49% Cu
  • SAS-21-30: 5m at 1.39% Cu

San Andres Drill Program

The San Andres target is a zone of copper mineralization located 500m southwest of the high-grade Cinabrio deposit mined by Glencore and Xiana Mining (see Figure 1).San Andres is a tabular sedimentary horizon within a volcanic sequence. This sedimentary horizon is variably mineralized and has a variable width ranging from 5m - 30m. It consists of an interlayered volcano-sedimentary sequence composed of dark colored laminated and unlaminated shales, volcanoclastic sandstone, conglomerates and breccias and tuff breccias. There is a variable component of syngenetic pyrite. The horizon dips 40 to 50 degrees to the east and is cut-off at depth by the moderately west dipping San Andres fault (see Figure 3).

Mineralization consists of veinlets and irregular disseminations in both the fine and coarse-grained clastic rocks and locally within the volcanic rocks above and below the host unit. The host horizon is also cut and offset by other faults with a wide range of orientations. The fundamental orientations identified to date include:

  • moderately west dipping splays of the San Andres fault, generally with downward and westward movement
  • steep dipping northeast to northwest trending faults with both sinistral and dextral offsets
  • Faults parallel and sub-parallel to stratigraphy
  • Historic wide-spaced drilling completed by the previous operators between 2011- 2020 totaled 76 holes / 9,676.65m. Significant historic drilling intercepts (see Table 3) included:
    • SAS-20-07: 16m at 2.52% Cu
    • SAS-07-50: 11m at 2.39% Cu
    • SAS-20-01: 11m at 2.16% Cu
    • SAS-20-08: 17m at 1.74% Cu
  • BMR's Phase 1 San Andres diamond drilling program comprised of 8,156 meters of diamond core drilling in 38 drill holes (See Figure 1 and Figure 2).

Sample assay results, reported herein, are from the final nine drill holes and are in addition to the results reported previously from the first 29 drillholes completed at San Andres (see Table 1 and Table 2 below).

SAS-21-37: 2.1m at 0.66% Cu from 210.1m

SAS-21-38: 15m at 0.40% Cu from 218m including 2.2m at 1.10% Cu from 230.8m.

Drillhole SAS-21-25 was designed to test San Andres targeted stratigraphic unit ("TSU") 60m down-dip from the SAS-21-08 intercept (5.3m at 1.39% Cu and a second interval of 3.8m at 1.85% Cu). This down-dip test resulted in an intercept of 4.6m at 0.82% Cu from 245m confirming the mineralized zone at depth at about the same width.

Drillhole SAS-21-31 targeted the TSU about 50m up-dip from hole SAS-21-06 that intersected an 18.2m downhole interval of the TSU consisting of shales and volcanoclastic sandstone and conglomerates with abundant pyrite and trace chalcopyrite. Further down, the hole intersected a thick section of the TSU with abundant pyrite with weak copper sulphides that yielded an intercept of 2.8m at 1.74% Cu from 169.8m.

Drillhole SAS-21-32 was planned as an infill hole targeting the gap between SAS-21-04 (16.7m grading 1.37% Cu including 11.7m at 1.64% Cu and a second interval of 9.0m at 1.75% Cu) and SAS-21-20(2.4m at 0.70% Cu). This hole successfully intersected 36m of the TSU including a 7m interval of mineralized shaley sediments. Two mineralized intercepts were reported 5.3m at 0.70% Cu from 212m and 4m at 1.44% Cu from 230m.

Drillhole SAS-21-33 targeted the gap west of the underground workings in the northern part of the San Andres zone. The drillhole intersected a 36m section of the TSU with disseminated chalcopyrite mineralization. A narrow, mineralized intercept of 2m at 0.73% Cu from 99m was reported.

Drillhole SAS-21-34 was designed to test the "drilling gap" between SAS-21-14 (28.1m at 0.98% Cu including 10.1m at 1.44% Cu and a second intercept of 9.4m grading 1.24% Cu) and SAS-21-07 (3.4m at 2.10% Cu) and a second interval of 4.0m at 1.56% Cu). SAS-21-34 intercepted 32m of the TSU with variable chalcopyrite and bornite sulphides that resulted in an encouraging assay of 9.2m at 1.57% Cu from 232m.

Drillhole SAS-21-35 tested the "drilling gap" between the high-grade intercept in SAS-21-27(11m at 2.16% Cu) and SAS-21-17 (3.6m at 1.04% Cu). The hole cut a 37m long section of the targeted stratigraphic unit with pyrite and chalcopyrite. The mineralized horizon produced a broad anomalous intercept of 25.1m at 0.54% Cu from 206.9m including 6.9m at 1.10% Cu from 225.1m.

Drillhole SAS-21-36 was designed to test the "drilling gap" between SASA-21-03 (11.0m at 1.39% Cu including 8.0m at 1.63% Cu) and historic hole SAS-20-02 (16m at 1.05% Cu). Hole SAS-21-36 positively intersected a strongly mineralized 51m of the TSU with pyrite and chalcopyrite that produced assays of 37.6m at 1.36% Cu from 178.4m including 27.4m at 1.55% Cu from 178.4m including 14.7m at 2.12% Cu from 191.1m and 7.1m at 1.16% Cu from 209.0m and including 3.2m at 1.93% Cu from 212.9m.

Drillhole SAS-21-37 was designed to test the "drilling gap" between SAS-21-03 (11.0m at 1.39% Cu including 8.0m at 1.63% Cu) and SAS-21-23(2.8m at 1.00% Cu). The hole intersected 10.2m of the TSU with pyrite and chalcopyrite. The hole successfully returned an intercept of 2.1m at 0.66% Cu from 210.1m.

Drillhole SAS-21-38 was designed to test the "drilling gap" between SAS-21-14 (28.1m at 0.98% Cu including 10.1m at 1.44% Cu and a second intercept of 9.4m grading 1.24% Cu) and SAS-21-24(3.0m at 0.82% Cu). The infill hole successfully intersected the TSU within which were 6.4m of shaley sediments with pyrite and copper sulphides of the TSU that produced 15m at 0.40% Cu from 218m including 2.2m at 1.10% Cu from 230.8m.

Table 1: San Andres Drilling Latest Significant Assays Results - November 2021

Drillhole
Number
From
(m)
To
(m)
Sample
Interval
(m)
Copper
Cu (%)
Silver
Ag (g/t)
SAS-21-25
and
237.2
245
239
249.6
1.8
4.6
0.68
0.82
0.7
1.6
SAS-21-31169.8172.62.81.744.1
SAS-21-32212217.35.30.702.6
and 23023441.442.9
SAS-21-339910120.7311
SAS-21-34
including
232.0
235.0
241.2
241.2
9.2
6.2
1.57
2.10
4.4
6.4
SAS-21-35
including
and
206.9
206.9
225.1
232.0
213.2
232.0
25.1
6.3
6.9
0.54
0.80
1.10
4.8
13.1
4.5
SAS-21-36
including
including
and
including
178.4
178.4
191.1
209.0
212.9
216.1
205.8
205.8
216.1
216.1
37.6
27.4
14.7
7.1
3.2
1.36
1.55
2.12
1.16
1.93
10.3
12.4
16.6
6.5
12.8
SAS-21-37210.1212.22.10.662.8
SAS-21-38
including
218.0
230.8
233.0
233.0
15
2.2
0.40
1.10
1.4
1.8

Note: All intervals reported as downhole core intervals

Table 2: San Andres 2021 Drill Program Significant Drillhole Intercepts

Drillhole
Number
From
(m)
To
(m)
Sample
Interval
(m)
Copper
Cu (%)
SAS-21-01180.2183.231.52
SAS-21-0218518830.04
SAS-21-03
including
195
201
209
209
14
8
1.19
1.63
SAS-21-04
including
and
185
190
223
201.7
201.7
232
16.7
11.7
9
1.37
1.64
1.75
SAS-21-05
including
and
200
203
220
210
207
229
10
4
9
0.52
0.87
2.06
SAS-21-07
including
and
241.4
244.7
257
263.7
249
261
22.3
4.4
4
0.71
1.94
1.56
SAS-21-08
including
and
221.8
221.8
232.9
236.6
227
236.65
14.8
5.3
3.75
0.95
1.39
1.85
SAS -21-11535520.91
SAS-21-12
and
including
162
176
176
164
194
183
2
18
7
1.04
1.18
1.81
SAS-21-13
and
and
including
199
211
217
217
202
212.8
221
220
3
1.8
4
3
0.87
0.83
1.59
1.96
SAS-21-14
including
including
including
203.2
203.2
207
227
239
216
216
239
35.8
12.8
9
12
0.98
1.45
1.83
1.25
SAS-21-15
and
and
116
133
139
119
136
141
3
3
2
0.50
0.48
0.51
SAS-21-17241.42453.61.04
SAS-21-19
including
74
74
79
78
5
4
1.08
1.24
SAS-21-20266.9269.32.40.70
SAS-21-21
including
including
and
106
106
115
136
131
119
119
138
25
13
4
2
0.88
0.96
1.19
1.12
SAS-21-23194196.82.81.00
SAS-21-2423123430.82
SAS-21-27213224 112.16
SAS-21-29218234161.49
SAS-21-30
including
50
52
55
55
5
3
1.39
1.89

 
Note: All Intercepts reported as downhole core intervals

Table 3: San Andres Significant Historic Drillhole intercepts

Drillhole
Number
From
(m)
To
(m)
Sample
Interval
(m)
Copper
Cu (%)
SAS-20-07180196162.52
SAS-17-04A20921342.52
SAS-07-50128139112.39
SAS-17-06
and
189
216
197
223
8
7
2.30
1.87
SAS-20-01186197112.16
SAS-17-05229.152344.851.80
SAS-20-08183200171.74
Note: All intervals reported are downhole core lengths

 

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6076/114451_b74fc1e764b52b6a_002.jpg

Figure 1: Cinabrio - San Andres Area Geology and Targets Map

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6076/114451_b74fc1e764b52b6a_002full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6076/114451_b74fc1e764b52b6a_003.jpg

Figure 2: San Andres Drillhole Location Map

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6076/114451_b74fc1e764b52b6a_003full.jpg

Cannot view this image? Visit: https://orders.newsfilecorp.com/files/6076/114451_b74fc1e764b52b6a_004.jpg

Figure 3: San Andres 3D Geological Model View Looking Along Strike South to North

To view an enhanced version of this graphic, please visit:
https://orders.newsfilecorp.com/files/6076/114451_b74fc1e764b52b6a_004full.jpg

Quality Control

Sample preparation, analysis and security procedures applied on the BMR exploration projects is aligned with industry best practice. BMR has implemented protocols and procedures to ensure high quality collection and management of samples resulting in reliable exploration assay data. BMR has implemented formal analytical quality control monitoring for all field sampling and drilling programs by inserting blanks and certified reference materials into every sample sequence dispatched.

Sample preparation is performed ALS Global - Geochemistry Analytical Lab in La Serena, Chile and sample analyses by ALS in Lima, Peru. ALS analytical facilities are commercial laboratories and are independent from BMR. All BMR samples are collected and packaged by BMR staff and delivered upon receipt at the ALS Laboratory. Samples are logged in a sophisticated laboratory information management system for sample tracking, scheduling, quality control, and electronic reporting. Samples are dried then crushed to 70%

  • ME-MS61: A high precision, multi-acid digest including Hydrofluoric, Nitric, Perchloric and Hydrochloric acids. Analysed by inductively coupled plasma ("ICP") mass spectrometry that produces results for 48 elements.
  • ME-OG62: Aqua-Regia digest: Analysed by ICP-AES (Atomic Emission Spectrometry) or sometimes called optical emission spectrometry (ICP-OES) for high levels of Co, Cu, Ni and Ag.

Certified standards are inserted into sample batches by ALS. Blanks and duplicates are inserted within each analytical run. The blank is inserted at the beginning, certified standards are inserted at random intervals, and duplicates are analysed at the end of the batch.

Additional Information

Michael Schuler, Battery Mineral Resources Corp. Chile Exploration Manager, supervised the preparation of and approved the scientific and technical information in this press release pertaining to the Punitaqui Exploration Drill Program. Mr. Schuler is a qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

About Battery Mineral Resources Corp.

A battery mineral company with high-quality assets providing shareholders exposure to the global mega-trend of electrification and focused on growth through cash-flow, exploration, and making acquisitions in the world's top mining jurisdictions. BMR is currently developing the Punitaqui Mining Complex and pursuing the potential near term resumption of operations for second half of 2022 at the prior producing Punitaqui copper-gold mine. The Punitaqui mine, operating as recently as April 2020, has typically produced 20 to 25 million lb. of copper in concentrate during its 9 plus year operating history and is located in the Coquimbo region of Chile.

BMR is engaged in the discovery, acquisition, and development of battery metals (cobalt, lithium, graphite, nickel and copper), in North and South America and South Korea with the intention of becoming a premier and sustainable supplier of battery minerals to the electrification marketplace. BMR is the largest mineral claim holder in the historic Gowganda Cobalt-Silver Camp, Canada and continues to pursue a focused program to build on the recently announced, +1-million-pound high grade cobalt resource at McAra by testing over 50 high-grade primary cobalt silver-nickel-copper targets. In addition, the Company owns 100% of ESI Energy Services, Inc., also known as Ozzie's, a mainline pipeline and renewable energy equipment rental and sales company with operations in Leduc, Alberta and Phoenix, Arizona. ESI, established in 1979, typically generates positive EBITDA in the range of C$4-$5 million and is poised for growth in 2022 and 2023. For more information on the business of Ozzie's Pipeline Padder, see https://ozzies.com

For further information, please contact:

Battery Mineral Resources Corp.
Martin Kostuik
Phone: +1 (604) 229 3830
Email: info@bmrcorp.com

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

Forward Looking Statements

This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements reflect the beliefs, opinions and projections of the Company on the date the statements are made and are based upon a number of assumptions and estimates that, while considered reasonable by the Company, are inherently subject to significant business, economic, competitive, political and social uncertainties and contingencies. Many factors, both known and unknown, could cause actual results, performance, or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements and the parties have made assumptions and estimates based on or related to many of these factors. Such factors include, without limitation, the ability of the Company to obtain sufficient financing to complete exploration and development activities, risks related to share price and market conditions, the inherent risks involved in the mining, exploration and development of mineral properties, government regulation and fluctuating metal prices. Accordingly, readers should not place undue reliance on forward-looking statements. Battery undertakes no obligation to update publicly or otherwise revise any forward-looking statements contained herein, whether as a result of new information or future events or otherwise, except as may be required by law.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/114451

News Provided by Newsfile via QuoteMedia

BMR:CA
The Conversation (0)
Battery Mineral Resources Corp. Announces US$2,000,000 Debt Financing, Closing of Previously Announced Interest Settlement Transactions & Corporate Update

Battery Mineral Resources Corp. Announces US$2,000,000 Debt Financing, Closing of Previously Announced Interest Settlement Transactions & Corporate Update

(NewsDirect)

Battery Mineral Resources Corp. ( TSXV: BMR ) ( OTCQB: BTRMF ) (" Battery " or " BMR " or the " Company ") is pleased to announce that it has entered into a debt financing arrangement with Weston Energy LLC (the " Lender ") for aggregate gross proceeds of US$2,000,000. In connection with the financing, BMR issued a promissory note to the Lender, which matures on September 15, 2023, and bears interest at a rate of 8% per annum, with interest payable at the maturity of the note. The proceeds of the financing will be used for general working capital.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Battery Mineral Resources Corp. Announces Facility Increase and Maturity Extension of Bridge Loan, Exploration Update on Cinabrio Concessions, and Publication of Inaugural ESG Report

Battery Mineral Resources Corp. Announces Facility Increase and Maturity Extension of Bridge Loan, Exploration Update on Cinabrio Concessions, and Publication of Inaugural ESG Report

(NewsDirect)

Battery Mineral Resources Corp. ( TSXV: BMR ) ( OTCQB: BTRMF ) (" Battery " or " BMR " or the " Company ") announces that it has entered into an amendment to its existing bridge loan facility provided by Weston Energy LLC (the " Lender "). The amendment increases the facility size from USD$4,000,000 to USD$5,300,000 and extends the maturity date to September 15, 2023. All other terms remain unchanged.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Battery Mineral Resources to Attend 121 Mining Investment Conference in New York

Battery Mineral Resources to Attend 121 Mining Investment Conference in New York

Battery Mineral Resources (TSXV: BMR) (OTCQB: BTRMF) is pleased to announce the company is participating in the upcoming 121 Mining Investment Conference in New York City.

121 Mining Investment New York will be hosting over 80 mining companies and more than 300 sophisticated investors for two days of pre-arranged, targeted 1-2-1 meetings. This year's event is being held on June 5-6.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less
Battery Mineral Resources Corp. announces attendance at CESCO week in Santiago Chile and interest settlement transactions with holders of convertible debentures

Battery Mineral Resources Corp. announces attendance at CESCO week in Santiago Chile and interest settlement transactions with holders of convertible debentures

(NewsDirect)

Battery Mineral Resources Corp. ( TSXV: BMR ) ( OTCQB: BTRMF ) (" Battery " or " BMR " or the " Company ") is very pleased to announce that its senior executives will be attending the Centro de Estudios de Cobre y la Mineria (" CESCO ") event in Santiago Chile the week of April 17 th to 21 st . CESCO Week and the World Copper Conference provide some of the most important commercial and networking opportunities in the mining industry, attracting in excess of 2000 delegates. Both events are renowned for the calibre of delegates and attract CEO participants from the world's most important miners and smelters.

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Battery Mineral Resources Corp. Announces Community and Social Initiatives at the Punitaqui Project in Chile

Battery Mineral Resources Corp. Announces Community and Social Initiatives at the Punitaqui Project in Chile

(NewsDirect)

Battery Mineral Resources Corp. ( TSXV: BMR ) ( OTCQB: BTRMF ) (" Battery " or " BMR " or the " Company ") is very pleased to announce that it has completed agreements with the Comunidad Agricola Potrerillos Alto (" Potrerillos Community ") and the Comunidad Agricola Punitaqui (" Punitaqui Community ").

News Provided by TheNewsWire via QuoteMedia

Keep reading...Show less
Cobalt periodic symbol over map of the world.

Top 10 Cobalt Producers by Country (Updated 2024)

The cobalt market is facing high demand, but analysts advise that production is also on the rise.

One of the metal’s main catalysts is excitement about electric vehicles. The lithium-ion batteries that power electric vehicles require lithium, graphite and cobalt, among other raw materials, and demand for these important commodities is expected to keep rising as the shift toward clean technologies continues at a global scale. Additionally, the metal is predominantly produced as a by-product of copper and nickel, two other metals that are important for the green transition.

Given those circumstances, it’s interesting to look at the top cobalt producers by country. According to the US Geological Survey, world production has increased significantly over the past two years. In 2023 total cobalt output topped 230,000 metric tons (MT), a large increase from 2022’s 190,000 MT, and a big jump from 2021's 165,000 MT.

Keep reading...Show less
Blue batteries.

Electra Battery Materials Secures US$20 Million Grant for Ontario Cobalt Facility

Electra Battery Materials (TSXV:ELBM,NASDAQ:ELBM) has received a US$20 million grant from the US Department of Defense to support the construction and commissioning of a cobalt refinery in Ontario.

According to a Monday (August 19) press release from the Department of Defense, the money will come to Electra via the Defense Production Act Investments Office and will use funds from the Ukraine Supplemental Appropriations Act of 2022.

The US$250 million refinery project is situated approximately 500 kilometers north of Toronto in Temiskaming Shores, a location strategically chosen to support North America's expanding electric vehicle (EV) supply chain.

Keep reading...Show less
Cobalt Investor Report

Cobalt Investor Report

Ready to ignite your portfolio?

Investing in cobalt? Let our experts help you stay ahead of the markets.

✓ Trends ✓ Forecasts ✓ Top Stocks

Keep reading...Show less

Sherritt Appoints Shelley Brown to its Board of Directors

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE   SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

News Provided by Business Wire via QuoteMedia

Keep reading...Show less
High Tech Metals Limited

ASX Retraction Statement

High-Tech Metals Limited (ASX: HTM) (High-Tech, HTM or the Company), refers to the announcement dated 6 September 2023 regarding the Company’s acquisition of the Norpax Nickel Sulphide Deposit (Norpax).

Keep reading...Show less

Sherritt Reports Second Quarter 2024 Results; Metals and Power Deliver Strong Performance; Net Direct Cash Cost Significantly Improved

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

News Provided by Business Wire via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×