Emerita Intersects 13.0 Meters Grading 0.2% Copper; 3.6% Lead; 13.1% Zinc; 1.35 g/t Gold and 120.9 g/t Silver and 22.9 Meters Grading 0.6% Copper; 2.0% Lead; 4.8% Zinc; 0.58 g/t Gold and 79.2 g/t Silver Extending La Romanera Deposit at Depth, Completes Environmental Base Line Studies at IBW

Emerita Intersects 13.0 Meters Grading 0.2% Copper; 3.6% Lead; 13.1% Zinc; 1.35 g/t Gold and 120.9 g/t Silver and 22.9 Meters Grading 0.6% Copper; 2.0% Lead; 4.8% Zinc; 0.58 g/t Gold and 79.2 g/t Silver Extending La Romanera Deposit at Depth, Completes Environmental Base Line Studies at IBW

Emerita Resources Corp. (TSX V: EMO; OTCQB: EMOTF; FSE: LLJA) (the "Company" or "Emerita") is pleased to announce additional assay results from the ongoing delineation drilling program at La Romanera Deposit, part of Emerita's wholly owned Iberian Belt West project ("IBW" or the "Project"). IBW hosts three previously identified massive sulphide deposits: La Infanta, La Romanera and El Cura. Results contained in this release are from La Romanera. All deposits are open for expansion along strike and at depth.

Assays have been received for two additional drill holes that were not included in the recently announced NI 43-101 compliant mineral resource estimate (Please see Emerita's news release dated May 23, 2023). See Figures 1, 2 and 3 for intercept locations and Table 1 for diamond drilling data. Drill holes LR146 and LR147 demonstrate that the deposit remains open at depth and is high grade and thick in this central area.

According to Ian Parkinson, EVP Corporate Development and Capital Markets for Emerita, "It is exciting to see such strong results as a follow up to the recently announced maiden mineral resource estimate at IBW. La Romanera is the cornerstone deposit on this Project and it appears to be sustaining excellent thicknesses and higher than average grades as we continue to expand the mineral resource at relatively shallow depth."

Drill Hole LR146:

The Upper Lens was intersected at 580.9 m down the hole. It encountered 13.0 meters grading 0.2% Copper; 3.6% Lead; 13.1% Zinc; 1.35 g/t Gold and 120.9 g/t Silver; including 6.0 meters grading 0.3% Copper; 4.8% Lead; 15.9% Zinc; 2.32 g/t Gold and 181.5 g/t Silver . The Lower Lens was intersected at 593.9 meters down the hole. It comprised 22.9 meters grading 0.6% Copper; 2.0% Lead; 4.8% Zinc; 0.58 g/t Gold and 79.2 g/t Silver; including 3.9 meters grading 0.3% Copper; 6.1% Lead; 9.1% Zinc; 2.36 g/t Gold and 247.8 g/t Silver .

Drill Hole LR147:

The Upper Lens was intersected at 649.3 m down the hole . It encountered 16.5 meters grading 0.4% Copper; 0.1% Lead; 0.2% Zinc; 0.17 g/t Gold and 22.1 g/t Silver, including 2.0 meters grading 0.4 % Copper; 0.1 % Lead; 0.4 % Zinc; 0.22 g/t Gold and 106.5 g/t Silver. The Lower Lens was intersected at 665.75 m down the hole. It comprised 17.2 meters grading 0.4% Copper; 2.0% Lead; 9.8% Zinc; 0.64 g/t Gold and 89.3 g/t Silver; including 7.0 meters grading 0.5% Copper; 2.9% Lead; 16.5% Zinc; 0.83 g/t Gold and 57.0 g/t Silver.

The current drilling program is focused on testing the extension of La Romanera deposit at depth. Drill holes LR152 and LR153 are in progress. Drill holes LR148, LR150 and LR151 are completed with assays pending and have intersected significant massive sulphide intervals including; 40.0 m (24.0 m for the Upper Lens; 16.0 m for the Lower Lens), 4.3 m and 40.9 m (27.8 m for the Upper Lens; 13.1m for the Lower Lens) of massive sulphides, respectively; increasing the potential for additional resources expansion.

A down-the-hole transient electromagnetic ("TEM") survey was completed in drillhole LR151, showing a conductor anomaly which continues for another 100 m at depth. The downhole TEM survey is being used by the exploration team to target the depth extension of La Romanera deposit.


230621_EMO_Fig 1

Figure 1: Diamond drilling plan map
View Figure 1 here:
https://www.globenewswire.com/NewsRoom/AttachmentNg/062d6db0-4a8f-4138-b20b-8e366248a59b


230621_EMO_Fig 2

Figure 2: Longitudinal section of the Lower Lens, La Romanera showing grade contours. Note the thick, high-grade trend of the deposit at depth where the extension drilling is focused. These areas are thicker and higher grade than the average resource grade which will provide an important contribution to a future resource estimate update.
View Figure 2 here:
https://www.globenewswire.com/NewsRoom/AttachmentNg/0008b42a-49c7-4a7f-98bc-728d39015784


230621_EMO_Fig 3

Figure 3: Longitudinal section of the Upper Lens, La Romanera showing grade contours. Note the thick, high grade trend at depth along the east side of the lens where the extension drilling is focused.
View Figure 3 here:
https://www.globenewswire.com/NewsRoom/AttachmentNg/d625b583-948d-4d69-9169-c9ac68d8b6f4

*ZnEq % formula used for Figure 2 and 3: ZnEq % = [(Zn grade * Zn recovery * Zn price) + (Pb grade * Pb recovery * Pb price) + (Cu grade * Cu recovery * Cu price) + (Ag grade * Ag recovery * Ag price) + (Au grade * Au recovery * Au price)] / (Zn recovery * Zn price)

Table 1: Diamond Drilling Data

DDH Easting Northing Elevation azimuth dip depth
(m)
FROM TO Width
(m)
Cu_% Pb_% Zn_% Au_g/t Ag_g/t LENS
LR146 646802 4172735 150 212 -62 645.5 580.9 593.9 13.0 0.2 3.6 13.1 1.35 120.9 UL
incl. 585.9 591.9 6.0 0.3 4.8 15.9 2.32 181.5 UL
LR146 593.9 616.8 22.9 0.6 2.0 4.8 0.58 79.2 LL
incl. 611.9 615.8 3.9 0.3 6.1 9.1 2.36 247.8 LL
LR147 646751 4172871 154 198 -56 701.3 649.3 665.8 16.5 0.4 0.1 0.2 0.17 22.1 UL
incl. 659.0 661.0 2.0 0.4 0.1 0.4 0.22 106.5 UL
LR147 665.8 682.9 17.2 0.4 2.0 9.8 0.64 89.3 LL
incl. 674.0 681.0 7.0 0.5 2.9 16.5 0.83 57.0 LL


Next Steps

The Company has recently strengthened its treasury with successful financings generating gross proceeds of $11 million which, coupled with the existing treasury, provides the runway to efficiently advance the Project towards permitting and a production decision. The key activities planned for the remainder of 2023 will be as follows:

  • Continue to expand La Romanera Deposit at IBW. The Company presently has six (6) diamond drills operating on the Project.
  • Complete the initial drilling on the historical El Cura deposit which is situated approximately midway between La Infanta and La Romanera of the IBW property. This program has commenced.
  • Complete metallurgical studies on La Romanera and La Infanta. This program has commenced, and the Company has contracted metallurgical support from SRK to work as part of the owners team and selected Wardell Armstrong LLP of the UK, who are highly experienced with Iberian Pyrite Belt deposits, to do the actual laboratory testing for the metallurgy.
  • Complete initial conceptual mine planning to a level appropriate to support site selection for future infrastructure as well as conversion of Exploration Licenses to Exploitation Licenses at IBW. Grupo IPH, a Spanish mining engineering firm based in Huelva that contracts for mines in the region is being contracted to complete this work.
  • Complete the initial exploration drilling campaign at the Nuevo Tintillo project. Drilling will commence after the summer season when heat related operating restrictions have been lifted.

Baseline Studies Completed

Emerita Resources has completed the Baseline Studies at the IBW project. The objectives of the studies are to gain an understanding of the current natural environment of the site, support further mine development decisions and management plans. The Company engaged the services of specialist Spanish companies with broad experience in Baseline Studies:

  • BIOGEOS, Estudios Ambientales SL
  • Diseño de Soluciones Medioambientales (DSM)
  • Laboratorios MICROAL SL

The Baseline Studies were initiated in June 2022, due to the need to integrate the environmental variability in both the current operational phase of the authorized exploration license and in the design stage of the future mining project within the regulatory framework of the Exploitation Concession associated with "IP. LA ROMANERA No. 15,029", which includes the La Romanera, El Cura and La Infanta deposits.

The Environmental Baseline Study lasted one year and consisted of the following technical analyses:

  • Diagnosis of the natural environment and landscape.
  • Analytical investigation of soils and water (surface and subsurface).
  • Hydrological and hydrogeological study (water balance).

The purpose of the work carried out has served to:

  • Establish a Mining-Environmental management process necessary to establish a zoning of areas, delimiting exclusion zones and admission zones for future activities and facilities linked to the future mining exploitation.
  • To update the official environmental information offered by the Environmental Administration.

Quality Assurance/Quality Control

Drilling at La Romanera is HQ size and core is placed into core trays at the drill site and transported directly from the site to Emerita's coreshack (15Km) from La Romanera and (8Km) from La Infanta. Once the cores are received at Emerita's coreshack they are photographed and geotechnical logging is performed. Geological, mineralogical and structural logging follows and mineralized zones are identified. The samples are marked every 1m or less, and respecting lithological contacts, with most of the samples 1.0m long. The zone immediately above and below the mineralized zones are also sampled. Core samples are sawed in half and half of the core is returned to the core tray for future reference. Once the core samples are cut, bagged and tagged, they are shipped to the ALS laboratory in Seville by Emerita personnel where sample preparation is done. In Seville, ALS performs the mechanical preparation of the samples and then the pulps are sent to ALS Ireland (ICP) and ALS Romania (fire assay). The analysis at ALS Lab corresponds to the ME-ICPore (19 elements) package, together with the Au-AA23 fire assay (Gold).

10% of the analyzed samples correspond to control samples (fine blanks, coarse blanks, high, medium and low grade standards). In addition, 10% of pulps are reanalyzed at a second independent certified laboratory (AGQ Lab Sevilla). When the analysis is completed, the certificates are received from the laboratory and the QA/QC protocol identifies any deviation or anomaly in the results and the entire batch is reassayed in such case. Once the data is approved by the QA/QC protocol assays are entered digitally directly into the database.

Qualified Person

The scientific and technical information in this news release has been reviewed and approved by Mr. Joaquin Merino, P.Geo, President of the Company and a Qualified Person as defined by NI 43-101 of the Canadian Securities Administrators.

About Emerita Resources Corp.

Emerita is a natural resource company engaged in the acquisition, exploration and development of mineral properties in Europe, with a primary focus on exploring in Spain. The Company's corporate office and technical team are based in Sevilla, Spain with an administrative office in Toronto, Canada.

For further information, contact:

Joaquin Merino
+34 (628) 1754 66 (Spain)

Vincent Chen
+1 778 990 9433 (Toronto)
info@emeritaresources.com

Cautionary Note Regarding Forward-looking Information

This press release contains "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information includes, without limitation, the mineralization of the IBW Project; the timing of assay results; the prospectivity of the Project and Nuevo Tintillo; the economic viability of the Project; the results of metallurgical studies; the Company's ability to obtain an exploitation licence and other permits and approvals for the Project; site selection for infrastructure; the results of baseline studies and other studies and the Company's future plans. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward- looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Emerita, as the case may be, to be materially different from those expressed or implied by such forward-looking information, including but not limited to: general business, economic, competitive, geopolitical and social uncertainties; the actual results of current exploration activities; risks associated with operation in foreign jurisdictions; ability to successfully integrate the purchased properties; foreign operations risks; and other risks inherent in the mining industry. Although Emerita has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information. Emerita does not undertake to update any forward-looking information, except in accordance with applicable securities laws.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.


Primary Logo

News Provided by GlobeNewswire via QuoteMedia

EMO:CA
The Conversation (0)
Emerita Resources Files Supporting Documentation For Exploitation Licence For The IBW Project

Emerita Resources Files Supporting Documentation For Exploitation Licence For The IBW Project

Emerita Resources Corp. (" Emerita " or the " Company ") (TSX-V: EMO; OTCQB: EMOTF; FSE: LLJA) announces that through its wholly-owned Spanish subsidiary, Emerita Resources España S.L.U., it has submitted all the required documentation (the " Supporting Documentation ") to support its application to the "Delegación Territorial de Energía y Minas in Huelva province, Junta de Andalucia" for an exploitation licence (the " Exploitation Licence ") for Emerita's wholly-owned Iberian Belt West project (" IBW " or the " Project "). Please see the Company's September 12, 2023 press release for further details regarding the Company's application for the Exploitation Licence.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Emerita Announces Commencement of Drilling Program at Nuevo Tintillo Project, Spain

Emerita Announces Commencement of Drilling Program at Nuevo Tintillo Project, Spain

Emerita Resources Corp. (TSX–V: EMO; OTCQB: EMOTF; FSE: LLJA) (the "Company" or "Emerita") announces it is commencing with the previously announced diamond drill program (see news release August 30, 2023) (the "Drill Program") at its wholly owned Nuevo Tintillo project ("Nuevo Tintillo" or the "Project") (Figure 1). Due to an unusually hot and dry summer, the restrictions related to fire prevention in the area were extended to mid-October.   During the hottest weather in this region of Spain, heavy equipment is not permitted to operate during the daytime hours. According to Joaquin Merino, P.Geo., President of Emerita, "This is the most extended dry period seen in the region in many years. Some rainy weather has started however much more is needed as reservoirs, ponds, smaller streams and rivers are still dry in many cases. The Company will truck water for the drill program."

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Emerita Intersects 6.3 Meters Grading 0.8% Copper; 1.6% Lead; 3.9% Zinc; 2.8 g/t Gold and 52.0 g/t Silver within a 27.6 Meters Thick Massive Sulphide Zone, Extending La Romanera Deposit at Depth. Three Additional Thick Massive Sulphide Intervals, Assays Pending

Emerita Intersects 6.3 Meters Grading 0.8% Copper; 1.6% Lead; 3.9% Zinc; 2.8 g/t Gold and 52.0 g/t Silver within a 27.6 Meters Thick Massive Sulphide Zone, Extending La Romanera Deposit at Depth. Three Additional Thick Massive Sulphide Intervals, Assays Pending

Emerita Resources Corp. (TSX V: EMO; OTCQB: EMOTF; FSE: LLJA) (the "Company" or "Emerita") announces additional drilling results from the ongoing drilling program at La Romanera Deposit, part of Emerita's wholly owned Iberian Belt West project ("IBW" or the "Project"). IBW hosts three previously identified massive sulphide deposits: La Infanta, La Romanera and El Cura. Results contained in this release are from La Romanera deposit where drilling is tracing the extension of the deposit at depth.

Results herein are from drill holes LR154 and LR155, which have intercepted polymetallic mineralization in the form of a massive to semi-massive sulphide lens at approximately -450m elevation (approximately 600m below surface). See Figure 1 and Table 1 below.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Emerita Resources Files Exploitation Licence Application for the IBW Project

Emerita Resources Files Exploitation Licence Application for the IBW Project

Emerita Resources Corp. (" Emerita " or the " Company ") (TSX-V: EMO; OTCQB: EMOTF; FSE: LLJA) announces that through its wholly-owned Spanish subsidiary, Emerita Resources España S.L.U., it has submitted an application to the "Delegación Territorial de Energía y Minas in Huelva province, Junta de Andalucia" (the " Junta ") for an exploitation licence (the " Exploitation Licence ") for Emerita's wholly-owned Iberian Belt West project (" IBW " or the " Project ").

The Exploitation Licence in Spain, when granted, has a 30-year term and can be extended for two subsequent 30-year periods.   Under Spanish regulations, in support of its Exploitation License application, Emerita has 3 months to submit certain additional documentation to supplement the application for the Exploitation Licence including an environmental impact study and mining plan.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Emerita Announces Planned Drilling Program at Nuevo Tintillo Project, Spain

Emerita Announces Planned Drilling Program at Nuevo Tintillo Project, Spain

Emerita Resources Corp. (TSX V: EMO; OTCQB: EMOTF; FSE: LLJA) (the "Company" or "Emerita") announces planned diamond drilling program (the "Drill Program") at its wholly owned Nuevo Tintillo project ("NT" or the "Project). The Drill Program is expected to commence late in the third quarter or early in the fourth quarter of this year. The precise start date for the Drill Program will depend on the easing of regulations presently imposed in southern Spain to reduce the risk of fires. Restrictions typically end around the middle of September as the weather begins to moderate. Presently, heavy equipment is not permitted to operate during the daytime hours due to hotter temperatures.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Lumina Gold Announces US$3.1 million Wheaton Precious Metals Draw and Amendment to the PMPA

Lumina Gold Announces US$3.1 million Wheaton Precious Metals Draw and Amendment to the PMPA

Lumina Gold Corp. (TSXV: LUM) (OTCQB: LMGDF) (the "Company" or "Lumina") is pleased to announce that under the previously announced US$300 million precious metals purchase agreement (the "PMPA") with Wheaton Precious Metals International Ltd., a wholly owned subsidiary of Wheaton Precious Metals Corp. ("Wheaton"), the Company has drawn the final installment of US$3.1 million (the "Final Installment") from the Early Deposit (as defined in the PMPA). The draw is related to specific pre-construction acquisition transactions. Wheaton has now advanced a total of US$48 million to Lumina. The remaining US$252 million under the PMPA will be advanced once specific conditions allowing for the start of construction have been met.

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less
Forte Minerals Engages Trion Communications GmbH for European Investor Awareness

Forte Minerals Engages Trion Communications GmbH for European Investor Awareness

Forte Minerals Corp. ("Forte" or the "Company") ( CSE: CUAU ) ( OTCQB: FOMNF ) ( Frankfurt: 2OA ) is pleased to announce its engagement of Trion Communications GmbH ("Trion") to provide investor relations and communication services in the German-speaking markets effective April 1, 2025 in accordance with Canadian Securities Exchange ("CSE") policies.

Trion Communications GmbH will support Forte in enhancing visibility among investors in Germany, Austria, and Switzerland. Their role includes distributing company news, translating shareholder communications, coordinating editorial placements in German financial publications, and fielding investor inquiries via multiple channels.

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Cygnus intersects new high-grade gold, plus visible gold* identified in subsequent holes

Cygnus intersects new high-grade gold, plus visible gold* identified in subsequent holes

Chibougamau Copper-Gold Project, Canada

HIGHLIGHTS:

News Provided by GlobeNewswire via QuoteMedia

Keep reading...Show less
Fast Track Application for the Taranaki VTM Project Lodged

Fast Track Application for the Taranaki VTM Project Lodged

Manuka Resources (MKR:AU) has announced Fast Track Application for the Taranaki VTM Project Lodged

Download the PDF here.

WESTERN COPPER AND GOLD STRENGTHENS STRATEGIC PARTNERSHIP WITH MITSUBISHI MATERIALS

WESTERN COPPER AND GOLD STRENGTHENS STRATEGIC PARTNERSHIP WITH MITSUBISHI MATERIALS

western copper and gold corporation ("Western" or the "Company") (TSX: WRN) (NYSE American: WRN) is pleased to announce that it has strengthened its relationship with Mitsubishi Materials Corporation ("Mitsubishi Materials").

Western Copper and Gold Corporation Logo (CNW Group/Western Copper and Gold Corporation)

Western has entered into an amended and restated investor rights agreement (the "Agreement") with Mitsubishi Materials, most notably extending the rights and obligations thereunder until May 30, 2026 , subject to Mitsubishi Materials acquiring 2 million common shares of the Company through open market purchases. These purchases will be non-dilutive to existing shareholders, as no new shares will be issued by the Company. Upon completion, Mitsubishi Materials' equity ownership in Western is expected to return to approximately 5%.

"Mitsubishi Materials have been a supportive partner, and we are pleased to see them grow their ownership in Western," said Sandeep Singh , President and CEO. "Their continued support through this proposed new investment, made through non-dilutive, open market purchases, is another vote of confidence in the team and the Casino Project. The corresponding extension of rights reflects the productive and aligned relationship we've built, and we look forward to continuing to collaborate as we advance one of Canada's most important critical minerals projects."

ABOUT western copper and gold corporation

western copper and gold corporation is developing the Casino Project, Canada's premier copper-gold mine in the Yukon Territory and one of the most economic greenfield copper-gold mining projects in the world.

The Company is committed to working collaboratively with our First Nations and local communities to progress the Casino Project, using internationally recognized responsible mining technologies and practices.

For more information, visit www.westerncopperandgold.com .

On behalf of the board,

"Sandeep Singh"

Sandeep Singh
President and CEO
western copper and gold corporation

Cautionary Note Regarding Forward-Looking Statements

This news release includes certain "forward-looking information" and "forward-looking statements" (collectively "forward-looking statements") within the meaning of applicable Canadian and United States securities legislation including the United States Private Securities Litigation Reform Act of 1995. These forward-looking statements are made as of the date of this news release. Forward-looking statements are frequently, but not always, identified by words such as "expects", "anticipates", "believes", "plans", "projects", "intends", "estimates", "envisages", "potential", "possible", "strategy", "goals", "opportunities", "objectives", or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions. Such forward-looking statements herein include statements regarding Mitsubishi Materials acquiring additional common shares of the Company.

Forward-looking statements involve known and unknown risks, uncertainties and other factors that may cause actual events to be materially different from those expressed or implied by such statements. Such factors include but are not limited to the risk of unforeseen challenges in advancing the Casino project, potential impacts on operational continuity, changes in general market conditions that could affect the Company's performance; and other risks and uncertainties disclosed in the Company's annual information form and Form 40-F for the most recently completed financial year and its other publicly filed disclosure documents.

Forward-looking statements are based on assumptions management believes to be reasonable, such assumptions and factors as set out herein, and in the Company's annual information form and Form 40-F for the most recently completed financial year and its other publicly filed disclosure document.

Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, other factors may cause results to be materially different from those anticipated, described, estimated, assessed or intended. These forward-looking statements represent the Company's views as of the date of this news release. There can be no assurance that any forward-looking statements will be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not intend to and does not assume any obligation to update forward-looking statements other than as required by applicable law.

Cision View original content to download multimedia: https://www.prnewswire.com/news-releases/western-copper-and-gold-strengthens-strategic-partnership-with-mitsubishi-materials-302428507.html

SOURCE western copper and gold corporation

Cision View original content to download multimedia: http://www.newswire.ca/en/releases/archive/April2025/15/c9765.html

News Provided by Canada Newswire via QuoteMedia

Keep reading...Show less

Talon Metals Drills Significant Nickel-Copper Mineralization Intercept at Tamarack During Feasibility Study Drilling

Intercept is outside of the Tamarack Resource Area at shallow depths in the CGO East Zone

Talon Metals Corp. (TSX: TLO) (OTC Pink: TLOFF) (together with its subsidiaries, "Talon" or the "Company"), the majority owner and operator of the Tamarack Nickel-Copper-Cobalt Project ("Tamarack Nickel Copper Project") in central Minnesota, is pleased to announce a mixed massive sulphide intercept in the CGO East Zone at the Tamarack Nickel Copper Project measuring 16.09 meters.

News Provided by Newsfile via QuoteMedia

Keep reading...Show less

Latest Press Releases

Related News

×