• Connect with us
    • Information
      • About Us
      • Contact Us
      • Careers
      • Partnerships
      • Advertise With Us
      • Authors
      • Browse Topics
      • Events
      • Disclaimer
      • Privacy Policy
    • Australia
      North America
      World
    Login
    Investing News NetworkYour trusted source for investing success
    • North America
      Australia
      World
    • My INN
    Videos
    Companies
    Press Releases
    Private Placements
    SUBSCRIBE
    • Reports & Guides
      • Market Outlook Reports
      • Investing Guides
    • Button
    Resource
    • Precious Metals
    • Battery Metals
    • Base Metals
    • Energy
    • Critical Metals
    Tech
    Life Science
    Base Metals Market
    Base Metals News
    Base Metals Stocks
    • Base Metals Market
    • Base Metals News
    • Base Metals Stocks

    Fjordland: Drilling at Woodjam South Yields 349.3 m Grading 0.36% Copper

    Investing News Network
    Jun. 16, 2011 01:30PM PST
    Base Metals Investing

    Fjordland Exploration Inc. (CVE:FEX) and Cariboo Rose Resources Ltd. (CVE:CRB) report drill results from three new holes (1,214.6 m) of the 2011 infill and expansion diamond drilling program.

    Fjordland Exploration Inc. (TSXV:FEX) and Cariboo Rose Resources Ltd. (TSXV:CRB) report drill results from three new holes (1,214.6 m) of the 2011 infill and expansion diamond drilling program.

    The press release is quoted as saying:

    At Woodjam South, a 15,000-metre (m) drilling program (5,000 m infill, 6,000 m expansion drilling, and 4,000 m unallocated) commenced on March 16th in the core area measuring 800 m by 630 m to a depth of more than 400 m. A number of the drill sites are planned to allow calculation of an inferred pit-constrained NI 43-101 compliant resource by the end of 2011. This work program is part of Gold Fields’ $5 million budget announced on March 2, 2011. This initial drilling program, utilizing two rigs, concentrated on the southern and southeastern areas of the core area of mineralization, primarily dictated by access logistics during the spring months. Drilling will next test the northern and northwestern areas of the core area of mineralization. To date, nineteen holes totaling more than 8,000 m have been completed; further results will be reported in batches when received. A drill location map may be viewed at www.fjordlandex.com/news/nr11-11b.pdf.

    Click here to access the entire news release. 

    tsxv:fextsxv:crbdrill results
    The Conversation (0)

    Go Deeper

    AI Powered

    Drill Tracker Weekly: Balmoral Intersects Longest High-grade Interval to Date at Martiniere

    TSXV:RPX

    Red Pine Intersects 5.7 g/t Gold Over 0.6 Metres And 5.2 g/t Over 0.9 Metres 100 Metres Below The Current Surluga Resource

    Latest News

    Outlook Reports

    Resource
    • Precious Metals
      • Gold
      • Silver
    • Battery Metals
      • Lithium
      • Cobalt
      • Graphite
    • Energy
      • Uranium
      • Oil and Gas
    • Base Metals
      • Copper
      • Nickel
      • Zinc
    • Critical Metals
      • Rare Earths
    • Industrial Metals
    • Agriculture
    Tech
      • Artificial Intelligence
      • Cybersecurity
      • Gaming
      • Cleantech
      • Emerging Tech
    Life Science
      • Biotech
      • Cannabis
      • Psychedelics
      • Pharmaceuticals

    Featured Stocks

    More featured stocks

    Browse Companies

    Resource
    • Precious Metals
    • Battery Metals
    • Energy
    • Base Metals
    • Critical Metals
    Tech
    Life Science
    MARKETS
    COMMODITIES
    CURRENCIES
    ×