Radisson Mining Files NI 43-101 Technical Report for O'Brien Gold Project

Company News
TSXV:RDS

Radisson Mining Resources Inc. (TSXV:RDS) announced that it has filed on SEDAR and on Radisson’s website a National Instrument 43-101 technical report for the preliminary economic assessment of the O’Brien gold project.

Radisson Mining Resources Inc. (TSXV:RDS) announced that it has filed on SEDAR and on Radisson’s website a National Instrument 43-101 technical report for the preliminary economic assessment of the O’Brien gold project.
As quoted in the press release:

The O’Brien project is located 500 meters north of Trans-Canada Highway 117 (Road 117), along the world renowned Larder-Lake-Cadillac Fault, halfway between Rouyn-Noranda and Val-d’Or, two mining towns known for their highly skilled workforces and qualified contractors.


There are no material changes between the results announced by press release on December 15, 2015 and the results contained in the Report effective November 29, 2015 and dated January 29, 2016 on SEDAR www.sedar.com.
6,200 metres diamond drill program update
In December 2015, the corporation announced a 6,200 m diamond drill program. On January 29th, 4 drill holes for a total of 1,591 m were completed. The 4 holes were completed with purpose of extending known ore shoot in and around PEA infrastructures. Two drill holes were completed in area 4 and 5. Drill holes are currently being logged, and will be split and sent to laboratory for assays in the coming weeks.

Connect with Radisson Mining Resources Inc. (TSXV:RDS) to receive an Investor Presentation.

The Conversation (0)
×