NV Gold Corporation is pleased to announce that the Company has completed 3 Notices of Intent to commence drilling at its 100% owned Slumber, Discovery Bay and Pickhandle projects in north-central Nevada, USA. The Company also reports that a 2D seismic survey has been completed at its optioned SW Pipe Project located along the Cortez Gold Belt approximately 6 km southwest of the Pipeline Gold Complex operated by ...

NV Gold Corporation (TSXV:NVX)(OTCQB:NVGLF) ("NV Gold" or the "Company") is pleased to announce that the Company has completed 3 Notices of Intent (NOI) to commence drilling at its 100% owned Slumber, Discovery Bay and Pickhandle projects in north-central Nevada, USA. The Company also reports that a 2D seismic survey has been completed at its optioned SW Pipe Project located along the Cortez Gold Belt approximately 6 km southwest of the Pipeline Gold Complex operated by Nevada Gold Mines

Upcoming Plans:

  • The upcoming Slumber drill program is designed to determine the extent of additional near-surface oxide-mineralization at its north-central Nevada (see Figure 1) project. The 6-8 drill program is expected to commence later this month.
  • The Discovery Bay Project is located approximately 15 km southeast of the Cove-McCoy gold deposits in Lander County, Nevada (see Figure 1) controlled by I-80 Gold Corp. This North-South structural zone, also known as the "Rabbit Suture", hosts other significant gold deposits such as Turquoise Ridge, Twin Creeks as well as the Fortitude, Phoenix and Lone Tree Mines. Drilling of a four-hole recon program is expected to commence in November.
  • The Pickhandle Project is located at the structural intersection of the Rabbit Suture (Hwy 305) and the Crescent Valley Fault Zone (see Figure 1). Pickhandle is located 25 kilometers south of the Discovery Bay Project. The 3-4-hole drilling program is anticipated to begin in December.
  • The recently announced IP/Resistivity program at the Sandy Project has added a highly compelling target that will likely be drilled in Q1 2022. See news release on 9/28/2021.
  • At the SW Pipe, a 2D Seismic survey was recently completed by the optionee to determine depth to Carlin-type host lithologies and structural drill targets (see Figure 2). Drilling at SW Pipe is scheduled for mid-2022 depending on core rig availability.

Our projects are pushing forward, and I am more than pleased to have our drill contract in place, equipment committed and permits in-hand. NV Gold has high-quality projects with excellent discovery potential that can now be drill-tested. Besides Slumber, Discovery Bay and Pickhandle, there are several more projects entering the project pipeline. These projects are moving toward permitting, fulfilling our goal of drill-testing multiple, high-potential projects within the next 18 months to deliver value to our shareholders," commented Thomas Klein, VP Exploration of NV Gold.

Figure 1: NV Gold's projects with NOIs in place and location of SW Pipe with 2D Seismic completed.

Figure 2: 2D Seismic equipment at SW Pipe with Cortez mines in the background.

On behalf of the Board of Directors,

John E. Watson
President & CEO

For further information, visit the Company's website at www.nvgoldcorp.com or contact: Freeform Communications Inc. at 604.245.0054

Neither the TSX Venture Exchange nor its Regulation Service Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release includes certain forward-looking statements or information. All statements other than statements of historical fact included in this release, including, without limitation, statements regarding the extent and timing of the Company's planned exploration activities, are forward-looking statements that involve various risks and uncertainties. There can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company's plans or expectations include regulatory issues, market prices, availability of capital and financing, general economic, market or business conditions, timeliness of government or regulatory approvals, The Company disclaims any intention or obligation to update or revise any forward-looking statements whether because of new information, future events or otherwise, except as otherwise required by applicable securities legislation.

SOURCE: NV Gold Corporation



View source version on accesswire.com:
https://www.accesswire.com/667137/NV-Gold-Corporation-Announces-Updates-on-Five-Active-Projects-in-Nevada-USA

News Provided by ACCESSWIRE via QuoteMedia

Metals & Mining Live Virtual Investor Conference December 8th & 9th

- Virtual Investor Conferences, the leading proprietary investor conference series, today announced the agenda for the upcoming Metals & Mining Investor Conference on December 8 th & 9 th .

Keep reading... Show less
Satori Resources: Developing the Past-Producing Tartan Lake Gold Mine Near Flin Flon, Manitoba

Satori Resources: Developing the Past-Producing Tartan Lake Gold Mine Near Flin Flon, Manitoba

Satori Resources (TSXV:BUD) redevelops past-producing mines to have a quicker path to production by leveraging existing infrastructure, workforce and historical data. Its flagship project is the 100 percent owned Tartan Lake Gold project near Flin Flon, Manitoba. The past-producing Tartan Lake Gold Mine was operational from 1986 to 1989 but was shut down when the price of gold fell below $400 per ounce in 1989.

Keep reading... Show less
K9 Provides Clarification for Analytical Data in December 2, 2021 News Release

K9 Provides Clarification for Analytical Data in December 2, 2021 News Release

K9 Gold Corp. (TSXV: KNC) (OTC Pink: WDFCF) (FSE: 5GP) ("K9" or the "Company") wishes to clarify the units reported for the analytical data in a table included in the company news release dated December 2, 2021. The gold values reported in the first paragraph of the release (ppb) are correct, but were reported incorrectly in the accompanying table. The corrected table is as follows:

Sample # From (m) To (m) ppb ppm As
105122 0.0 3.0 425 >1000
105123 3.0 6.0 2138 >1000
105124 6.0 9.0 817 >1000
105125 9.0 12.0 428 >1000
105126 12.0 15.0 238 >1000

 

Keep reading... Show less
gold bars and silver coins with dollar bill

VIDEO — EB Tucker: Don't Get Fleeced — Know What You Want to Own, Preserve Your Wealth

EB Tucker: Don't Get Fleeced — Know What You Want to Own, Preserve Your Wealth youtu.be

Expectations were running high for gold and silver at the beginning of 2021, but with only one month left in the year, both precious metals look set to finish close to where they started.

Speaking to the Investing News Network, EB Tucker, author of "Why Gold? Why Now?," shared his thoughts on what happened and whether the situation is likely to change in the new year.

In his opinion, part of the problem is that the market has been distorted by minute-to-minute trends — people want to make money as quickly as possible and are less interested in long-term strategies.

Keep reading... Show less
Altan Rio CEO Paul Stephen

Altan Rio CEO Paul Stephen: Positioned to Deliver a More Than Million-ounce Discovery

Altan Rio (TSXV:AMO) has recommenced its reverse-circulation drilling program to test targets immediately below the existing pilot mine in the prolific Southern Cross greenstone belt, Western Australia.

According to Altan Rio CEO Paul Stephen, the company is drilling underneath a known body with strong evidence that it continues at depth in a similar manner to a very large mine on the same trend that goes down up to 800 meters.

Keep reading... Show less

Fortune Bay Announces Closing of $6,863,700 Non-Brokered Private Placement

Fortune Bay Corp. (TSXV: FOR) ( Frankfurt : 5QN) ("Fortune Bay" or the "Company") is pleased to announce that it has closed its previously announced non-brokered private placement (the "Offering") for aggregate gross proceeds of $6,863,700 . The Company issued 4,669,231 units and 4,972,338 flow through shares.  Each unit was issued at a price of $0.65 per unit, with each unit comprised of one common share and one-half common share purchase warrant.  Each whole warrant will be exercisable into one common share of the Company at an exercise price of $0.85 per share for a period of two years.  The flow through shares were issued at a price of $0.77 per share.

Keep reading... Show less

Top News

Related News