Cypress Posts Drill Results from Gunman Zinc-Silver Oxide Project

Cypress Development Corp. (TSXV:CYP,OTC Pink:CYDVF) provided the results of a drill program completed at its Nevada-based Gunman zinc-silver oxide project. The work was completed as part of the 2014 Phase 1 exploration program at the property.

As quoted in the press release:

Thirteen reverse circulation (RC) drill holes were completed at the Gunman zinc-silver-copper project in eastern White Pine County, Nevada. The drilling program totaled 3520 feet and was directed at three targets areas located in the central portion of the property.

Infill and confirmation drilling within the RH Zone intersected long intervals of strong dolomitic alteration containing abundant gossanous iron oxide zones. Assays from five foot interval samples within the oxide zone and adjacent fractured dolomitized limestone show spectacular zinc and silver mineralization.

Click here to read the full Cypress Development Corp. (TSXV:CYP,OTC Pink:CYDVF) press release.

Get the Latest Silver Investing Stock Information

Get the latest information about companies associated with Silver Investing delivered directly to your inbox.

Silver $0-15m
Silver $15-50m
Silver $250m+
Silver $50-250m

By selecting company or companies above, you are giving consent to receive email from those companies. And remember you can unsubscribe at any time.

Silver-eBook-Cover-smallSilver Investing News Free Exclusive Report: When Will Silver Go Up: Is the Highest Price of Silver Still to Come? Here’s a look at all the major catalysts that are expected to affect the silver price brought to you by Investing News - Bringing you unbiased news, education and helping investors realize their financial goals

Leave a Reply