American Manganese’s Artillery Peak Project is Economical

American Manganese Inc.(TSXV:AMY) announced the news that its Artillery Peak Manganese Project is economic as per the results of the pre-feasibility study prepared by Tetra Tech Wardrop. The Company are aiming to file the NI 43-101 report on SEDAR in the next 45 days.

As quoted in the press release:

As shown in the Report, the total amount of EMM produced over the life of the mine is estimated to be 994,499 tonnes (about 2.19 billion pounds). The average unit production cost of the EMM, after credits from by-product and on-site waste steam power generation. The plan incorporates a low waste strip ratio (2.20:1) and higher grade (3.13% Mn) in the first 6 years of operation; followed by the second phase of mining ending in year 10 that has an average grade of 2.68% MN and a waste strip ratio of 2.17:1.

Click here to read the American Manganese Inc. (TSXV:AMY) press release

See this press release on Marketwire
Click here to see the American Manganese Inc. (TSXV:AMY) profile

Get the Latest Manganese Investing Stock Information

Get the latest information about companies associated with Manganese Investing delivered directly to your inbox.


By selecting company or companies above, you are giving consent to receive email from those companies. And remember you can unsubscribe at any time.


There Is No Guide to Critical Metals Investing That is More Concise, Clear and Authoritative.

  Download this FREE Special Report, Investing in Today’s Critical Metals – Context for Lynas News and Molycorp News.

Leave a Reply